HomeMy WebLinkAboutNCC203072_NOT Closeout Documents_20230804 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
Trojan Solar Electric Power Generation
County: Columbus Project: Facility River basin: Cape Fear
Person financially responsible:CS Energy,LLC-Gary Garnet,Senior Project#:COLUM-2020-014
Project Manager
Address: 2045 Lincoln Highway,Edison,NJ 08817
1. Project Location: US 74,Delco
Pictures: No
2. Weather and soil conditions: 80's sunny,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): None Title:
Inspection report: Sent Report Date given/sent: October 22,2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self-monitoring or self-inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).
The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Caroline Dalis Others present:
Date of inspection: October 21,2021 Time arriving on site: 3:30 PM Time leaving site: 3:50 PM