Loading...
HomeMy WebLinkAboutNCC232368_Site Plan or Location Map (2)_20230808 GROVE 98 - NORTHEAST QUADRANT COMMERCIAL LOT 4 PUD s LIMITS -1(g SITE - el CONSTRUCTION PLANS (SP-21 -33-A) colejenest&stone BOLTON do MEN K,INC. -.; SCM#1 \\ \ \ •'•j 418 S DAWSON STREET • RALEIGH NORTH CAROLINA 27601 l I / \ 1;;;;:::::::::: - �. Phone:(919)719-1800 / \ a 4y+ Email:info@colejeneststone.com \ _' 3 www.bolton-menk.com ,oro -- — \ \ / STILES CORPORATION \ \\ / SCMm / VICINITY MAP N.T.S.031 / 111111 I I I I I • SURVEY DISCLAIMER 1 II�� I J300 W.SUMMIT AVE )♦ EXISTING BASED ON SURVEYIN BASE CAD FILE,PROVIDED BY BN%,RALEIGH, SUITE 230 II I —O I I + — — — — — — — NC 19191 8 51-4 62 2.DATED GATED07/09/191. CHARLOTTE,NC 28203 / GROVE 98 CD- o10,_ _.___ — RICHLAND CLOVE AVE { ��� NORTHEAST — 70'PUBLIC R/W rlo II - ' .... __ �,4 \\ Sheet Index QUADRANT LOT 4 I — • C � \ Sheet Number Sheet Title HIGHWAY 98 AND LIGON MILL ROAD � - — — — \) WAKE FOREST,NC —II I r 1 1 11 1 A� =_______, . �.��� I C-000 COVER SHEET Y L� NWQ MULTIFAMILY DEVELOPMENT - N 4 I C-400.1 EXISTING CONDITIONS COVER SHEET LOT 1 �� �— 4pcOM :CAL LOT4 Id \\� 1 � (2.36 AC) I I I I I 1' 0 I C-300 OVERAROSION � el,� I. I CONTROL • \ ,•• BUILDING A:±35,002 SF C)I. C] ❑ _ C-301 SOIL EROSION CONTROL PHASE I -= IL A �, \ ��� I PROJECT NO: I ' ' \\ ( II il: (INCLUDING MEZZANINE) t I I I I I I I I I I I I I I I I I I U C-302 SOIL EROSION CONTROL PHASE II 50436 T IMoi- matI I■` �V—'�IJ « I C-400 GRADING AND DRAINAGE PLAN 11 _ IL—��1111111 Ig�I�- \ ` I on. ~ 41 /t I C-500 UTILITY PLAN REVISIONS: , I D I I MN p■. �� / I C-600 CODE LANDSCAPING PLAN 12/08/2022: RESPONSE TO 1ST ROUND .11 � II \ re, 1���� a CD COMMENTS TO2 I BED.■■■ ■ ••BB••••• C-700 SITE DETAILS IlW 1. I faorm1�N:mmmu' � + t + t � 01/17/2023: RESPONSET02NDROUND OI I ■ 6 NEQ MULTI-FAMILY C-701 SITE DETAILS CD COMMENTS �1IIIIR....III....MA 111111 1111 111 111111 I/J1■ s� .i (PLANS UNDER REVIEW) I .. _-- I C-7100 LANDSCAPEDETAILS 04/05/2023: RESPONSE TOMMEN SRD ROUND I �� CD COMMENTS i 0 Mil l I • - -- - -- ----- y y y Q 3 I C80 SEC S 05/30/2023: RESPONSE TO 4TH ROUND ——— — .. _ C801 STORMWATER DETAILSI.aP _. mo 1 `\� C-802 let I 1 U 1IA. .aP = MM M M MM S I Cc il C-803 UTILITY DETAILS II -- -- to _' TC-804 NCGO1 — — II __ __ Z a_ °' PP-101 LIGHTING PHOTOMETRIC 1EL ------1_L - + t- - i t. == 0NWQ-COMMERCIAL PARCEL BLOT 3 N � � NEQ COMMERCIAL �� NEQ COMMERCIAL (UNDER CONSTRUCTION) = CC = I LOT 5 mm % LOT 6 ,q\ I I . . (UNDERI CONSTRUCTION) �� (FUTURE SUBMITTAL) 1 c ,� I I I I J T I a R �t ,va .ow la.o� P t- 6 IIt qq' „paTNINPgpg',, R 1• v i .:0.:cc..s/o' 2' ................................. GAo 11 &M ,l.• 1 It �,g1�1111111111111Q ®11111� t '9: (.0,E:it. oFf � IIIh — , r M, «69A .M Dui - M, -I'`'' :e° 1F $? °PseA� �CM A M 1I7'/.%//. i 4 7'bY•2- ti qr S: QN I �� 1 .�0� NGINFE GSA,. s�A�:?a1:'�y�6 ...:[AL:e:'c°•11I� !1 I I •S'H0� °••�O,` �N Ml,pE-C„:0 �eleJeven°''��AA 06/07/2023 ff"O6/07/2023HI/q////Ifnf I SITE PERMITTING APPROVAL 'o PROJECT DATA. PROPOSED BUILDING Water and Sawa,Permits m wawbl.) The M of Raleigh consents to the connection and exrenaon ofthecnysPubn.S.w.Svrt.m as shown on this plan.The 5 PROJECT NAME: GROVE 98 PUD-NORTHEAST QUADRANT COMMERCIAL LOT 4 SQUARE FOOTAGE: 35,002 SF(INCLUDING MEZZANINE) materialendCo„atmrnonmethods.mrormisprojea:heRnsMormtomestandardsandspecinreretons&Mecm/SPut. 4 win.Handbook.city Mn.I.Mhv.bM Militia.Dammam Permit PROJECT LOCATION: UGON MILL ROAD AND RICHLAND GROVE AVE„WAKE FOREST NC BUILDING HEIGHT: PROPOSED=35'TO TOP OF PARAPET The City M Raleigh consents to the connection and extension ofthe cM's Public W..Syatam as shown on this plan.me PIN: 1830875268 PARKING REQUIRED: 123 VEHICULAR SPACES utilities and Construction methods used h ea ,tn;s project mall raMan o tome standard:and specifications CR ications me ys Public INDOOR RECREATION PARKING=1 PER 4 PERSONS PERMITTED enxaaabook.City MwN,d,wMm Wilk.Department wn rwrmn PROJECT ADDRESS: 11136 UGON MILL RD MAXIMUM OCCUPANTS PERMITTED=492 The cnyM Raleigh consents tome mnne<nonmua public newer system and anenamnmmel.xm..w.r.Ml.tlan WAKE FOREST,NC 27587 MAXIMUM OCCUPANTS ANTICIPATED AT TYPICAL PEAK USAGE=231. d xe o rni.Ham The mate,.and consnmconformtionsmethods used for misproject shall, arm tome standard. *SEE SUPPLEMENTAL ESTIMATED PEAK USAGE DATA AND ARCHITECTURAL PLANS ma anaa meCity's Nike UnmiesHandbook. Z OWNER& ATTACHED TO MASTER PLAN SUBMITTAL SET MASTER DEVELOPER: WB FITNESS WAKE FOREST LLC city el/Welsh RMl.Inlw.nee...Perm. WILSON BLOUNT DEVELOPMENT INC BICYCLE=2 PER 40 AUTO SPACES PROVIDED(124)-6 SPACES 2626 GLENWOOD AVE STE 350 N c RALEIGH NC 27608-1041 PARKING PROVIDED: 124 VEHICULAR SPACES=5 HC+119 STANDARD ATTN: MITT COZART,WCOZARTOYALSONBLOUNT.COM 1919-659-3293 8 BICYCLE PARKING SPACES(4 RACKS: 2 BIKES PER'U'RACK) 679 '^ CITY OF RALEIGH-PIANS AUTHORIZED FOR CONSTRUCTION PREPARED BY: BOLTON&MENK,INC.I COLEJENEST&STONE,PA PRINCIPLE BUILDING FRONT SETBACK.10'MIN. Electronic APwova:TNa approval a bens issued electronically.This approaua.aild only upon Me signature of a Cityof 1, 418 5 DAWSON ST SETBACKS: STREET SIDE/SECONDARY FRONT SETBACK=5'MIN. Raleigh Review Officer below.The City.11 retain copy afMeapproved plans.Any workamhamm bymis approval mast RALEIGH,NC 27601 SIDE(FROM ADJACENT LOT)SETBACK=5'MIN. ALL PUBUC FACIUTIE6.INCLUDING unUTIES,SIDEWALKS,AND nakept on nlewnhmecM.mlaelectranieaPPrmal may natbeemree...MA./ ATTN: JORDAN PETERSEN,RLA,LEED AP HANDICAP RAMPS ARE TO BE CONSTRUCTED ON ALL STREETS o REAR SETBACK=20'MIN. modification this eace issued mhralm.mm�aasPm+al. ..,r:r.:x.a.-,. JORDAN.PETERSENOBOLTON-MENK.COM,919-748-1797 AS SPECIFIED BY TM STANDARDS THESE FACIUTES HAVE m Timothy Beasley°`''„^:li'''' WATERSHED OVERLAY: RICHLAND CREEK WATER SUPPLY WATERSHED(WS-IV) BEEN APPROVED BY THE TOWNOF WAKE FOREST AND SHALL City of Raleigh Development Approval BE SO INSTALLED UNLESS A CHANGE IS APPROVED BY THE SCALE: 1"=50' CURRENT ZONING: GROVE 98 PLANNED UNIT DEVELOPMENT(FORBES PUD RZ-18-15,AS AMENDED) SPECIAL HIGHWAY OVERLAY(SH2-0) TOWN OF WAKE FOREST. Raleigh Water Review OfficerREVIEW ENGINEER DISCLAIMER O COMMUNITY PLAN DESIGNATION: CORRIDOR COMMERCIAL SPECIAL FLOOD EXECUTION OF THIS CONSTRUCTOR PLAT BY THE REVIEW 0 25' 50' 100' CURRENT LAND USE: N/A HAZARD OVERLAY: NONE ENGINEER FOR THE TOWN OF WAKE FOREST IN NO WAY LIMITS THE RESPONSIBILITY OF THE OWNER AND ENGINEER OF RECORD rvg PROPOSED LAND USE: COMMERCIAL(FTNESS CENTER) PROPOSED STORMWATER WITH REGARD TO COMPLIANCE OATH ALL FEDERAL,STATE,AND These plans have been electronically approved for construction by the Town of Wake Forest SCALE: CURRENT PROPERTY CONTROL MEASURE: REFERENCE STORMWATER REPORT FOR GROVE 98 NORTH INFRASTRUCTURE LOCAL STANDARDS AND/OR GDNDITDNS. Planning Department.This approval may not be 00:1,3 once;:sued. DATE: 05/30/23 2 CONSTRUCTION PLANS(PROJECT TRACKING ID SP-20-26/SP-20-02) OWNER CERTIFICATE - ;: Tim Richards , OVERALL PUD AREA(GROSS): 96.25 AC OWNER HEREBY CERTIFIES AND AGREES TO TAKE SUCH ACTION --0]/24/2023 DESIGNED BY: PK,AR ` OVERALL GROVE 98 NORTH AREA(GROSS): 50.53 AC PARK SPACE: 0 SF(SEE APPROVED GROVE 98 MP FOR OVERALL PUD CALCULATIONS AS MAY BE REQUIRED BY THE TOWN OF WAKE FOREST TO Plennin ( )• CORRECT ANY ERRORS,OMISSIONS OR NON-COMPLIANCE WITH g 'm OPEN SPACE: 0 SF(SEE APPROVED GROVE 98 MP FOR OVERALL PUD CALCULATIONS DRAWN BY, PK,AN TOWN STANDARDS AND/OR CONDITIONS DESCRIBED IN THIS COMMERCIAL LOT 4 GROSS AREA: 2.36 ACRES PUBUC IMPROVEMENT CONSTRUCTION PLAT.INCLUDING RE-SUBMISSION OR CHECKED BY: BLIP o QUANTITIES: PUBUC WATER=(PROPOSED SERVICE METER CONNECTION ALONG NC98 RE-EXECUTION OF THIS CONSTRUCTION PLAT'MTfi THE $ TOTAL DISTURBED AREA: 2.43 ACRES/105,850 SF ) APPROPRIATE CORRECTIONS AND/OR REVISIONS. TOTAL IMPERVIOUS AREA: 1.87 ACRES(77.OR) PUBLIC SEWER=(1)PROPOSED 8'LATERAL WITH GREASE TRAP TO MH These plans have been electronically approved for construction by the Town of Wake Forest M v,, G/ Public Works and Engineering Department.This approval may not be edited once issued. PRIVATE IMPROVEMENT _ ryH a0p a QUANTITIES: PRIVATE STORM- 15"RCP-90 LF OWNER DATE "4„ o/2B/2 23na C-QOQ Public Works/Engineering Q o FILE NO.: