Loading...
HomeMy WebLinkAbout20140090 Ver 2_Site 2 Sediment loss_20150709Wanucha, Dave From: Wanucha, Dave Sent: Friday, July 10, 2015 12:15 PM To: Euliss, Amy Cr. Suggs, Phillip H; Guy, Jeremy M; Wyrick, Scott D; Panek, Lindsey F Subject: RE: Silt Loss at Site #2 and Potentia) Shut Down Notice Thanks. Hovv about W�ds or Thurs morning of n�xt vv��k to r�vi�vv th� sit�? Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston�Salem, NC 27105 Cell (336) 403�5655 Office (336) 776�9703 Dave. Wanucha(r�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s From: Euliss, Amy Sent: Friday, July 10, 2015 12:10 PM To: Wanucha, Dave Cc: Suggs, Phillip H; Guy, Jeremy M; Wyrick, Scott D; Panek, Lindsey F Subject: RE: Silt Loss at Site #2 and Potential Shut Down Notice I r�vi�vv�d sit� 2 this morning. Th� str�am at sit� 2 has b��n ad�quat�ly cl�an�d to th� point you r�qu�st�d, and th� �rosion control m�asur�s hav� b��n r�pair�d and r�vis�d. I°v� attach�d a coupl� pictur�s of th� m�asur�s. Photo 1 is tak�n abov� th� first m�asur� and photo 2 is tak�n abov� th� s�cond m�asur�. Th� sit� has b��n s��d�d and vvill b� stravv mulch�d as soon as possibl�. L�t m� knovv vvh�n you vvould lik� to r�visit th� sit�. -A�,y From: Euliss, Amy Sent: Tuesday, July 07, 2015 3:51 PM To: Wanucha, Dave Subject: FW: Silt Loss at Site #2 and Potential Shut Down Notice � From: Guy, Jeremy M Sent: Tuesday, July 07, 2015 3:08 PM To: Martin Alos,Jose Ignacio. (jimartinalosbC�Draqados-USA.com) Cc: 'acrespo@dragados-USA.com'; Andres, Jorge (jandresC�Draqados-USA.com); Wyrick, Scott D; Euliss, Amy; Suggs, Phillip H; Archer Sr, Wright; Davis, Vickie G; Puckett, Lester L; Freeman, R. Mark; Ivey, Stephen P; Raulston, Keith E Subject: Silt Loss at Site #2 and Potential Shut Down Notice Jose, As you may know we lost quite a bit of sediment at Site 2 on the C203484 project. This was reported yesterday to the agencies around lunch and it was added to the erosion report around the same time. This was labeled as Urgent on the NPDES form and included cleaning up the silt and more importantly repairing the EC devices in this area and adding additional measures to protect this area. I spoke with Scott W., Jorge, Carlos and Raymond today onsite about the importance of cleaning up this area and protecting it. We told them that Dave W. with The Division of Water Resources was personally coming out to see this area at 1PM today. We told them the importance of having all available crews cleaning up these areas and protecting them within 24 hours. Jorge Carlos and Raymond stated that they would move extra men over to work on these areas. I was just notified by Amy Euliss and Scott W. that there is little effort going on in this area and that there are 8 men with buckets cleaning out the stream, however there is no one on site repairing the measures in this area. This does not fare well for you and it appears it could mean that we receive an NOV as Dave is not happy with what he is seeing. I know that Amy, myself and Scott feel the same way. Phil was gracious not to give an ICA yesterday (and really over the basin issue the other week since you had so many people working to fix the issues). That effort stopped yesterday and I have no choice but to ensure that we do all we can to protect these sites and follow the stipulations set forth by the permits. Honestly I think Roger has been a step in the right direction and he has helped the project, however he is one person and for a job this size and with this much open area, a larger force will be necessary. Let me know if you have any questions. Thanks, Jeremy M. Guy, P.E. Resident Engineer Forsyth Construction Office I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U°ii� �e,i�dcr i� �ul�j��;� �u �C�h°ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h°ih�rl I�artie,�,