Loading...
HomeMy WebLinkAbout20231085 Ver 1_Site Plan_202308071; Pha%r a►4i,o n-ta►r►v %irtr fi lf.e follo*ing InlnrmIIIon on IIv1% plan and piovlde dlmen%ions for hR # itllr.w a 0%1 Ivryti"avl %rl(rtitk•n Itearmot h teat►om of ►►o ►ap vu NI to be placed above the. Full Fund/ Ffurmal Water Level elevation c 1oc at►.1n of no rap or f►,l to be placed below the Full Fond/ Normal Water Level elevation d lot x',ion of any pruposed structures such as buildings, retaining walls, docks, etc, e t�Natlon of any excavat►on or dredging below the Full Pond/ Normal Water level elevation d/ r Plan La ke (At Full Fond/ Normal Water level) M w u w�4 wwl X y ak ` AYwt bf wr,W hKl II.IWIL a1111 L E AMPLE Plan View FORrA: SSGP 02-2017 Page 3 of 4 C O View ILL. 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing 'if necessary Existing bank 10 ft. bank Side Vi AMPLE 1: SSGP 02-2017 Page 4 of 4