HomeMy WebLinkAbout20231085 Ver 1_Site Plan_202308071; Pha%r a►4i,o n-ta►r►v %irtr fi lf.e follo*ing InlnrmIIIon on IIv1% plan and piovlde dlmen%ions for
hR # itllr.w
a 0%1 Ivryti"avl %rl(rtitk•n Itearmot
h teat►om of ►►o ►ap vu NI to be placed above the. Full Fund/ Ffurmal Water Level elevation
c 1oc at►.1n of no rap or f►,l to be placed below the Full Fond/ Normal Water Level elevation
d lot x',ion of any pruposed structures such as buildings, retaining walls, docks, etc,
e t�Natlon of any excavat►on or dredging below the Full Pond/ Normal Water level elevation
d/ r
Plan
La ke
(At Full Fond/ Normal Water level)
M
w u w�4 wwl
X y ak ` AYwt bf wr,W hKl
II.IWIL a1111 L
E AMPLE
Plan View
FORrA: SSGP 02-2017 Page 3 of 4
C
O
View
ILL.
3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing
'if necessary
Existing bank
10 ft. bank
Side Vi
AMPLE
1: SSGP 02-2017 Page 4 of 4