Loading...
HomeMy WebLinkAbout20140090 Ver 2_July 7 Inspection_20150707Wetland Inspection Report Project Num: 20140090 Version: 2 Status: Issued Project Name: NCDOT- US 158 (U-2579B) Project Type: Road County: Forsyth Region: �lanston Salem pair/improvemen Location: NCDOT- US 158 (U-2579B) Latitude: +36° 07' Longitude: -80° 07' 55" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 7/7/2015 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Title: Phone: Primary Inspector: Dave Wanucha Phone: 336-776-9703 Ext.3 Secondary Inspector(s): Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: Standards/Sediment Question Areas: � Unpermittable Activities Inspection Summary: page: 1 Site Number: 20140090 Owner: Thorpe, Gregory Inspection Date: 7/7/2015 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Unpermittabie Activities # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? Is wetland(s) free of unpermittable impacts? Is open water(s) free of unpermittable impacts? Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? Are surFace waters on the site free of illegal discharges? Yes No NA NE ❑ � ❑ ❑ ❑ ❑ � ❑ ❑ � ❑ ❑ ❑ ❑ ❑ � ❑ � ❑ ❑ Comment: Sediment loss occured within the pond at downstream of Site 6 and at Site 2. Some turbidity was noted with the pond but not major. It was to be clean out. Site 2 involved a sediment release several 100 ft downstream. Measures were in place but were blown out. Crews had begun to clean the channel. I walked down several hundred feet and directed to clean to a point 50 feet downstream of a UT to the channel. Will followup next week. page: 2