Loading...
HomeMy WebLinkAboutNC0037834_Compliance Evaluation Inspection_20230807 (2)United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 2 u 3 I NC0037834 111 121 23/06/29 I17 18 LC] I 19 I s I 20L] 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 73 � I 74 79 I I I I I I I80 70 I I 71 I LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 10:OOAM 23/06/29 17/08/01 Archie Elledge WWTP 2801 Griffith Rd Exit Time/Date Permit Expiration Date Winston Salem NC 271036417 12:30PM 23/06/29 22/06/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Matthew Richard Lavigne/ORC/336-397-7600/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Jon M Southern,2801 Griffith Rd Winston Salem NC 271036417//336-397-7600/3366594320 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Operations & Maintenar 0 Records/Reports Sludge Handling Dispo: Facility Site Review 0 Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date GarDv Hudson DWR/Division of Water Qua Iity/336-776-9694/ by: ocuSigned aarQsbt& 8/2/2023 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date by: 8/4/2023 FDocuSigned ti -T. 15 ,,dcr EPA Form Y96&-flfev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO037834 I11 12I 23/06/29 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) July 19, 2023 — Inspection Summary — NC0037834 On June 29, 2023, Division of Water Resources staff Gary Hudson conducted a routine compliance inspection at the Archie Elledge WWTP. Bonnie McKee and Matthew Lavigne were present during the inspection. A review of the October 2022, and April 2023 eDMR was compared to laboratory bench sheets. No discrepancies were noted. During the inspection, no violations or items of concern were noted. The following treatment components were inspected: Permit The permit became effective on August 1, 2017, and expired on June 30, 2022. A renewal application was submitted on December 28, 2021. Odor Control: The Archie Elledge WWTP has six carbon air scrubbers for odor control. Four are located at the influent/preliminary treatment, one is located at the primary clarifiers, and one is located at the sludge thickener. Carbon is replaced yearly. All units were operating properly during the inspection. Preliminary Treatment: Preliminary treatment consists of two mechanical bar screens, two grit classifiers, and two cyclone grit chambers. All six units are rated at a maximum capacity of 50 million gallons pr day (MGD). All units were operating properly during the inspection. Primary Treatment: Primary treatment consists of four large primary clarifiers. All units were operating properly during the inspection. Secondary Treatment: Secondary treatment consists of activated sludge basins, and six secondary clarifiers. All units were operating properly during the inspection. Magnesium hydroxide is used for pH adjustment when needed. Final Effluent: Sodium hypochlorite is used for disinfection and sodium bisulfate is used for de -chlorination. The effluent composite sampler is set to collect 140 ml sample every 28 pulses. The refrigerator temperature was 5 degrees centigrade. Sludge Digestion: Sludge digestion consists of six floating cover anaerobic digesters. Sludge Handling and Disposal: All sludge is run through a gravity belt thickener before it enters the anaerobic digesters. After digestion, the sludge is run through a dryer and turned into pellets. All of the dried pellets are sold to a private contractor to be used as fertilizer. Page# Permit: NCO037834 Owner -Facility: Archie Elledge WWTP Inspection Date: 06/29/2023 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The permit became effective on August 1, 2017, and expired on June 30, 2022. A renewal application was submitted on December 28, 2021. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: Ms. McKee, Mr. Lavigne, and the rest of the staff do a very good lob with keeping records. A review of the October 2022, and April 2023 eDMR was compared to laboratory bench sheets. No discrepancies were noted. Page# 3 Permit: NCO037834 Inspection Date: 06/29/2023 Owner -Facility: Archie Elledge WWTP Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The WWTP appeared to be well operated and maintained. No discrepancies were noted during the inspection. Bar Screens Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Yes No NA NE ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: Preliminary treatment consists of two mechanical bar screens, two grit classifiers, and two cyclone grit chambers. All six units are rated at a maximum capacity of 50 million _gallons pr day (MGD). All units were operating properly during the inspection. Grit Removal Type of grit removal a.Manual b.Mechanical Is the grit free of excessive organic matter? Is the grit free of excessive odor? # Is disposal of grit in compliance? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: The Archie Elledge WWTP has six carbon air scrubbers for odor control. Four are located at the influent/preliminary treatment, one is located at the primary clarifiers, and one is located at the sludge thickener. Carbon is replaced yearly. All units were operating properly during the inspection. Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Page# 4 Permit: NCO037834 Inspection Date: 06/29/2023 Owner -Facility: Archie Elledge WWTP Inspection Type: Compliance Evaluation Primary Clarifier Yes No NA NE Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) ❑ ❑ ❑ Comment: Primary treatment consists of four large primary clarifiers. All units were operating properly during the inspection. Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ 0 ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? ■ ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) ❑ ❑ ❑ Comment: Secondary treatment consists of activated sludge basins, and six secondary clarifiers. All units were operating properly during the inspection. Magnesium hydroxide is used for pH adjustment when needed. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ■ ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ■ ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ■ ❑ ❑ ❑ Is scum removal adequate? ■ ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? ■ ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) ❑ ❑ ❑ Page# 5 Permit: NC0037834 Inspection Date: 06/29/2023 Secondary Clarifier Owner -Facility: Archie Elledge WWTP Inspection Type: Compliance Evaluation Comment: All six secondary clarifiers appeared to be well maintained. Anaerobic Digester Type of operation: Is the capacity adequate? # Is gas stored on site? Is the digester(s) free of tilting covers? Is the gas burner operational? Is the digester heated? Is the temperature maintained constantly? Is tankage available for properly waste sludge? Comment: Sludge digestion consists of six floating cover anaerobic digesters. Yes No NA NE Yes No NA NE Floating cover ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Page# 6