Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20130912 Ver 1_Emails_20150626Wanucha, Dave
From: Nicole Thomson <nthomson@sepiengineering.com>
Sent: Friday, June 26, 2015 12:27 PM
To: Wanucha, Dave; Bailey, David E SAW
Cc: Whitley, Kimball; Lorenz, Kris; Register, Kenneth d; drhodes100@hotmail.com
Subject: Sediment losses on Neelley Road (R2612B)
Attachments: 20150624_154529jpg; 20150624_154540jpg; 20150624_154948jpg; neelley rd
62515jpg; neelley rd 62515 site ljpg
Good morning Dave!
As we discussed yesterday, please see some of the photos I grabbed from the wetland area over at Site III on the above
project. This area is proposed to be under fill, so I instructed them not to bother removing the sediment loss. I also
included a shot of that inlet pipe so that you could see it BEFORE the subsequent monsoon we had onsite
yesterday. That storm event is what overwhelmed the cross pipe that fouled the stream just below. After you left
yesterday, Kim, Doug and myself went around with the contractor and staff identifying areas that needed repair and
clean out due to the storm.
As the water recedes in these areas, clean up efforts continue. Site I(which is the ramp/loop system on the other side
of Neelley road) also experienced some sediment loss—these areas are denoted as impact areas (last 2 pictures I've
attached). They were completely underwater yesterday. As the water has lowered, sediment is visible. The contractor
has been advised that any areas that are greater than 1" need to be removed by hand. Areas that are just a skim layer
need seed and straw (rather than sediment removal). The pond WAS drained — it has since filled back up. As the water
level lowers, any built up areas of sediment will also be removed.
Please feel free to drop me a line if you have any other questions or concerns.
I will swing by the project next week to put my eyes on the clean up efforts.
Thanks and have a great weekend!
Nik
� N E tl W W&„ilG�. �; be ry A..
�^iu��:����; �. II"����u������
I�n�ti%nm��u�u�����9�4 ��m����;�:P ���u����„c;m
1025 Wade Avenue
Raleigh, NC 27605
Direci: (919� 573-9914
Main Line: (919� 789-9977
Fax: (919� 789-9591
Cell: (919� 754-7806
www.sepiengineering.com
Confidentiality Notice: This message is intended only for the designated recipient(s). It may contain confidential or
proprietary information and may be subject to the attorney-client privilege or other confidentiality protections. If you are not a
designated recipient, you may not review, copy or distribute this message. If you receive this in error, please notify the
sender by reply e-mail and delete this message. Thank you.