Loading...
HomeMy WebLinkAbout20130517 All Versions_R24313B Field Minutes_20150708��� BLYTHE DEVELOPMENT CO. 1415 EAST WESTINGHOUSE BOULEVARD • CHARLOTTE, NORTH CAROLINA 28273 TEL (704) 588-0023 • FAX (704) 588-9935 Meetinq Minutes 7/8/15 24138 Site 4, 5, 6, 7, 8 Site #4: The plans and permits were reviewed on-site at this location. No pipe stakes were installed therefore Flatiron/elythe was notified to stake this area several days before laying the pipe to make any field adjustments needed (the alignment of the pipe coming into the existing stream channel should be adjusted both horizontally and vertically if needed to ensure the banks do not wash out or a scour hole doesn't form in the creek channel). There was not a construction sequence attached in the RFC plans. Once the pipe is sraked Flatiron/Blythe will submit a plan for NCDOT/NCDNER review. It was noted that this was a dry stream channel. Site #5: The plans and permits were reviewed on-site at this locarion. No pipe stakes were installed therefore Flatiron/Blythe was notified to stake this area several days before laying the pipe to make any field adjustments needed (the alignment of the pipe coming into the existing stream channel should be adjusted both horizontally and vertically if needed to ensure the banks do not wash out or a scour hole doesn't form in the creek channel). The construction sequence was reviewed and will be followed prior to installing the proposed pipe. Site #6: The plans and permits were reviewed on-site at this location. No pipe stakes were installed therefore Flatiron/Blythe was notified to stake this area several days before laying the pipe to make any field adjustments needed (the alignment of the pipe coming into the existing stream channel should be adjusted both horizontally and vertically if needed to ensure the banks do not wash out or a scour hole doesn't form in the creek channel). There was not a construction sequence attached in the RFC plans. This area is completely out of the jurisdictional stream. Flatiron/Blythe was still reminded that sediment needs to remain within the job limits and out of the Jurisdictional area below the pipe outfall. Plan measures need to be installed and maintained during construction. Site #7: The plans and permits were reviewed on-site at this location. No pipe stakes were installed therefore Flatiron/elythe was notified to stake this area several days before laying the pipe to make any field adjustments needed (the alignment of the pipe coming into the existing stream channel should be adjusted both horizontally and vertically if needed to ensure the banks do not wash out or a scour hole doesn't form in the creek channel). The construction sequence was reviewed and will be followed prior to installing the proposed pipe. Site #8: The plans and permits were reviewed on-site at this location. The construction sequence was reviewed and will be followed prior to installing the proposed culvert. The culvert will be installed followed by stream mitigation. There was a question about the temporary excavation in the wetland area. Todd Collins is going to follow up with RKK concerning this matter to see if this additional work is needed. • If any field changes are made prior to the pipe being installed (alignment or elevationsJ an email will be sent to RKK/NCDNER/NCDOT for their records. • If the construction sequence deviates from the plans or what was discussed in the field a new plan will be submitted similar to previous construction submittals.