Loading...
HomeMy WebLinkAboutNCC214587_NOT Closeout Documents_20230803 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Cumberland Project: Cypress Pointe-Lots 3-15 River basin: Cape Fear Person financially responsible:H&H Constructors of Fayetteville,LLC-Leslie Project#: CUMBE-2022-003 Groves,VP of Sales NCC214587 Address: 3709 Raeford Road,Suite 200,Fayetteville,NC 28304 1. Project Location: Revelstroke Road,Grays Creek Pictures: No 2. Weather and soil conditions: cloudy/workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: February 10,2023 9. Corrective action needed: 10. Comments: Permanent groundcover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the Permittee via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Te3rmination process. Reported by: Melissa Joyner Others present: Jodi Pace Date of inspection: February 10,2023 Time arriving on site: 2:41 PM Time leaving site: 2:49 PM CC: