Loading...
HomeMy WebLinkAbout20230747 Ver 1_More Info Received_20230726 (2)7/19/23, 12:41 PM Corps AID Number: Example: SAW-2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* OYes ONo New Submission Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): O Wetlands Q Streams -tributaries O Buffers O Open Waters O Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact* (') 3b.lmpact 3c. Type of impact* 3d. S. name* 3e. Stream 3f. Type of 3g. S. width* 3h. Impact type* Type *M Jurisdiction* length* S1 Roadway Crossin, Permanent Culvert Unnamed Tributar Perennial Both 3 100 Average (feet) Qinearfeet) S2 Roadway Crossirn Permanent]Culvert Unnamed Tributar Both Average (feet) (linear feet) Add another impact ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 https://edocs.deq.nc.gov/Forms/Pre-Construction_Notification_Form 6/10