Loading...
HomeMy WebLinkAbout20230811 Ver 1_more info received Revised plans_2023070525 YEAR STORM PIPE CHART Downstream Upstream Rim Downstream Upstream Pipe Downstream Rainfall Intensity Drainage Area Total Area Flow to Inlet Maximum Flow Average Velocity Full Flow Upstream HGL Downstream Upstream Node Runoff Coef. Total Flow (cfs) Full Flow (cfs) Diameter (in) Slope (%) Pipe Length (ft) Node Elev (ft) Rim Elev (ft) Invert (ft) Pipe Invert (ft) (in/hr) (Acres) (Acres) (cfs) (cfs) (fps) Velocity (fps) (ft) HGL (ft) HW 101 H W 102 767.03 766.55 760.32 759.82 0.65 4.14 32.23 32.23 86.73 86.73 91.90 98.86 42.00 0.83 59.92 10.86 9.55 763.03 762.53 FES 103 FES 104 727.87 727.77 723.87 723.77 0.65 3.60 65.64 65.64 153.52 153.52 97.49 104.88 48.00 0.39 25.48 12.53 7.76 727.85 727.39 TEMPORARY IMPACT SUMMARY: TEMPORARY STREAM IMPACT \ \ TS 2: 10 LF/ 55 SF _ PERMANENT IMPACT SUMMARY: ` ZONE 1: PERMANENT BUFFER IMPACT: ` \\ O PZ 1A: 2,066 SF (0.047 AC) ,N) \ \ PZ 1 B: 2,044 SF (0.047 AC) ZONE 1 TOTAL: 4,110 SF (0.094 AC) \ \ 30' STREAM PERMANENT STREAM IMPACT: BUFFER S1: 60 LF/ 623 SF (0.017 AC) PERMANENT BUFFER \ \ 7 S2: 28 LF/308 SF (0.007 AC) DISTURBANCE TOTAL: 820 SF (0.019 AC) -0+50 r PZ 1A= 2,066 SF PERMANENT WETLAND IMPACT: 770 TEMPORARY MEWW1: 0 SF (0.000 AC) 06 BYPASS PIPE 7s8 28'x11'x2' CLASS 1 - \ RIP RAP PAD PERMANET STREAM DISTURBANCE S2= 308 SF (28 LF) - v -762- EXISTING HEADWALL 102 POND - 764 NCDOT STD. 838.80 _ NV: 759.82' _ 766 PERMANENT STREAMIMPACT S1 = 623 SF (60 LF) - ow _ i -770 �ERMANENT BUFFER 4%*T RBANCE 772- PZ 1 B44 S6.. / - / -774 _- /- / I-778 - 780 / -782- \ CROSSING #1 -0+50 0+00 780 770 RIP RAP APRON (EMBEDDED IN STREAM BED 1' FOOT) 760 F I HEADWALL 101 NCDOT STD. 838.80 INV: 760.32' 770 _ TS 2: 55 SF (10 LF) PUMP► AROUND TEMP. IMPACTS \ 1 V APPROXIMATE ` ----- STREAM TOB \ 60 LF 42'' RCP @ 0.80% � � \ 765 o� TEMPORARY SANDBAGS CO- TEMPORARY CREEK ' _ CROSSING PUMP (SEE (� DETAILS) PRO.ROAD I \ \ \ 20' EP-EP \\\ \ 760 \ i 1 1 784 t li 20 0 10 20 40 80 SCALE: 1 " = 20' PROPOSED GRADE I N M �? N O M co � � o M O (0 O C:, o 2WcAz0 N0 ooti T_U)0 I 6" C-900 PVC WATERMAIN 60 LF 42" RCP @ 0.83% 1+00 EXISTING GRADE 0+00 'RADE 42" PIPE INVERT OF PIPE TO BE BURIED 8.5" BELOW STREAM CHANNEL CROSS SECTION A-B VERTICAL SCALE: 1" = 4' HORIZONTAL SCALE: 1" = 40' 2+00 / 1 _740_ / \A �83\�� / 738- NP PROP. ' ACCESS PERMANENT BUFFER 736- 6, DISTURBANCE 0+50 PZ 1A= 1,308 SF / � / /�_UO -734-- TEMPORARY BYPASS PIPE -732 32'x12'x2 CLASS 1 RIP RAP PAD PERMANET STREAM d 1 DISTURBANCE 25 48'`F S2= 384 SF (32 LF) d FES 104 INV:723.7T PERMANENT BUFFER 00, DISTURBANCE ` �WELANDS PZ 1 B= 890 SF CROSSING #2 -0+50 740 730 720 TEMPORARY IMPACT SUMMARY: TEMPORARY STREAM IMPACT TS 2: 10 LF/ 55 SF PERMANENT IMPACT SUMMARY: 742 ZONE 1: 740 PERMANENT BUFFER IMPACT: _ PZ 1A: 1,306 SF (0.030 AC) - PZ 1 B: 890 SF (0.020 AC) 738- ZONE 1 TOTAL: 2,196 SF (0.050 AC) r 736- _- PERMANENT STREAM IMPACT: S1: 26 LF/ 244 SF (0.006 AC) -734 S2: 32 LF/384 SF (0.009 AC) - TOTAL: 665 SF (0.015 AC) _ PERMANENT WETLAND IMPACT: W1: 0 SF (0.000 AC) " PERMANENT STREAM IMPACT D S1 = 244 SF (26 LF) TEMPORARY CREEK CROSSING PUMP (SEE DETAILS) -0+50 730 8' APPROXIMATE STREAM TOB - 729 TS 2: 55 SF (10 LF) PUMP \ / AROUND TEMP. IMPACTS TEMPORARY SANDBAGS \ FES 103 �3p INV: 723.87' 000� � �� ` y �725 \ 732-0#0 -� I' 734 1� \ -736 i 738 - _ 740 �o 20 0 10 20 40 80 720 SCALE: 1" = 20' 0+00 1+00 ti c LO 09 CD Omer- CO CO P_+ C0 N �I" LLc~/)0 LL U)?0 PROPOSED GRADE EXISTING r25 48" GRADERIP RAP APRON PE(EMBEDDEDINSTREAM 39% BED 1' FOOT) O 0 0 O O O 0 0 0 O e- EXISTING I GRADE SITE z Rpgp LN VICINITY MAP 1 "=2000' 0+00 '-PROPOSED GRADE 48" PIPE INVERT OF PIPE TO BE BURIED 10" BELOW STREAM CHANNEL CROSS SECTION C-D VERTICAL SCALE: 1" = 4' HORIZONTAL SCALE: 1" = 40' 0+50 O m jr N V z E "= � O 0 v V O Ln C O V N 0 V) 0 •M�Ov Nz w H 60 a) - 00 3 3 m V coo `✓ W LL 2 2 0 QN g U z O ZCL J LO W M U) N dOCnZ7 OZOOv W o� O Z M oQ01§s 2 i' W LPL W 7<.J L_ IL O cn W p Q. 0L T� U 0 w w U Q Z J Z ° O W WU H 2 Oo0 O U } Z W Z W � O� aU(n W I- O z z O U) W af W Q 0 zaaaaaa DRAWN BY: TS/ADY CHECKED BY: BCS DATE: 06/26/2023 PROJECT NO.: 01420.020 REF. NO.: - SCALE: PRELIMINARY FOR REVIEW ONLY \otAUS � L I TYT p , 0 �010 J� OZ -4 SHEET ¢ Z D m 7 y BEFORE YOU DIG! CONTACT ONE -CALL CENTER 22 OF 27 Cus ,�O�NLITYT RTcO �A O Jw Oz= Q Z D m 7 y W1 (FT.) ELEVATION W2 (FT. PI AN STREAM 6 MIL. PLASTIC PUMP EXCESS WATER TO APPROVED DEWATERING DEVI DRY WORK AREA SAND OR GRAVEL BAG COFFERDAM NOT TO SCALE TEMPORARY CREEK CROSSING PUMP AROUND DETAIL (NTS) EXISTING PLAN VIEW SECTION AA I. DESCRIPTION THE WORK SHALL CONSIST OF INSTALLING A PUMP AROUND WHEN CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE STREAM CHANNEL II. MATERIAL SPECIFICATIONS SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO ULTRAVIOLET RADIATION, TEARING AND PUNCTURE, AND WOVEN TIGHTLY ENOUGH TO PREVENT LEAKAGE OF FILL MATERIAL (i.e. SAND, FINE GRAVEL, ETC.) III. CONSTRUCTION REQUIREMENTS 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AS THE FIRST ORDER OF WORK. 2. THE HEIGHT OF THE SANDBAGS SHALL BE AS INDICATED IN SECTION A -A. THE SANDBAGS SHALL BE PLACED ON A SMOOTH PREPARED SURFACE. 3. ALL EXCAVATED MATERIALS SHALL BE DISPOSED OF OUTSIDE THE 100 YEAR FLOOD PLAIN UNLESS APPROVED ON THE PLANS. 4. ALL DEWATERING OF THE CONSTRUCTION AREA SHALL BE PUMPED TO A DEWATERING PUMP DISCHARGE FILTER BAG OR SILT BASIN. 5. THE PUMP SHALL BE OF SUFFICIENT SIZE TO CONVEY NORMAL STREAM FLOW. 6. SEDIMENT CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL ALL DISTURBED AREAS ARE STABILIZED AND THE CITY ENGINEERING DEPT APPROVES THEIR REMOVAL. 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE 2 6" 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE SIDE NOTES: * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, 838.39, 838.51, 838.57, 838.63 AND 838.69. * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. * USE 4000 PSI CONCRETE. * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. * PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR * ALL ELEMENTS PRECAST TO MEET ASTM C913. * WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. * CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 #5 @ 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ 8" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.5 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.0 95 @ 8" 4.50/5.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.5 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 #5 @ W' 1 4.50/5.00 1 7.50/8.50 3.25/4.00 7.75/9.25 14.75/16.75 10 Q- z O� Fr Q Q LL J CL Z O O u)= LLJ LL = Q U O H F- LLJ CnHLLOJ 00(ncr 2--, 1 CL LLJ w J Y O J LL 3m z � , �z Q W a H o W a H= o W a Q � r � V � zQ O z CC- r NLu } p Q C-17 z W cl) CL = d O LL SITE LN \/I(`INIITV NA4P I d4.11q ROAD Ln Lf) o m CV OJ � > CV Z3 U Nz x E �4- o J Q V U CD Ln i L D 0-) U CU N r'_ O m °�z Lu CO V) CO a C= Uoo � m w LL z co O � QN g O � Z O : Za w �o Lo co<N w C\l U) N 0-(DLx)ZN VJ OZXOv wLLJ 0�v m J_ wo OZ(o o Q D- IZ V W Z a. W O (j) o� p ry � U co V W �w ry U Q Z J Z O O < H U w OoOf O U� Z u1 Z ui ~ 0� O� 0- U Cn W O z z 2 O a op \ LU U LU 0 W Q OARED ON DRAWN BY: TS/ADY CHECKED BY: BCS DATE: 06/26/2023 PROJECT NO.:01420.020 REF. NO.: - SCALE: 1" = 30' PRELIMINARY FOR REVIEW ONLY SHEET BEFORE YOU DIG! CONTACT ONE -CALL CENTER 23 OF 27