HomeMy WebLinkAbout20150648 Ver 1_401 Application_20150715AI�LMG 1_fl�s LAND MANAGEMENT GROUP rrtc Environmental Consultants June 30th 2015 TO: Mr. Chad Coburn NCDENR Division of Water Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: 401 WQC Application; N. Kerr Industrial Park; Phase III Sec II Cooper Construction Wilmington, NC (New Hanover County) Dear Chad: 2®156646 �,Jllr Enclosed is a 401 WQC application for your review. This application is submitted on behalf of Cooper Construction for the development of the North Kerr Industrial Park, Phase III Section II. The applicant plans to construct a large distribution warehouse with associated parking, access, and stormwater facilities for FedEx. Impacts to 0.447 acre of non - riparian wetlands are necessary to construct the building and access ways. To mitigate for wetland impacts, the applicant proposes buying 0.5 acre of credits from the Northeast Cape Fear Mitigation Bank. The Pre - Construction Notification form, associated maps, and site plan are enclosed for your review. The application fee has been mailed to your Raleigh Office. Please contact me if you have any questions. Thank you for your assistance with this project. Sincerely, ` tAJ Kim Williams Environmental Scientist Encl. Cc: Mr. John McCary, Cooper Construction Mr. Tim Clinkscales, Paramounte Engineering Mr. Kyle Dahl, USACE Ms. Jennifer Burdette, NC DWR JUL 02 2015 DENR -LAND QUALITY STORMWATER PERIVIITTING www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 AI�LMG LAND MANAGEMENT GROUP rxc. � No Ava � Environmental Consultants June 30th, 2015 TO: Mr. Kyle Dahl U.S. Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 RE: NWP 39 Application; N. Kerr Industrial Park; Phase III Sec II Cooper Construction Wilmington, NC (New Hanover County) Dear Kyle: Enclosed is a NWP 39 application for your review. This application is submitted on behalf of Cooper Construction for the development of the North Kerr Industrial Park, Phase III Section II. The applicant plans to construct a large distribution warehouse with associated parking, access, and stormwater facilities for FedEx. Impacts to 0.447 acre of non - riparian wetlands are necessary to construct the building and access ways. To mitigate for wetland impacts, the applicant proposes buying 0.5 acre of credits from the Northeast Cape Fear Mitigation Bank. The Pre - Construction Notification form, associated maps, and site plan are enclosed for your review. Please contact me if you have any questions. Thank you for your assistance with this project. Sincerely Kim Williams Environmental Scientist Encl Cc: Mr. John McCary, Cooper Construction Mr. Tim Clinkscales, Paramounte Engineering Mr. Chad Coburn, NC DWR Ms. Jennifer Burdette, NC DWR www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 j, '. usuii(w Yo4�Wd:aalMa��Y O�O� w A T � o < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the ® Section 404 Permit El Section 10 Permit Corps: 1b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: 2c. Nearest municipality / town: Wilmington ° �. p� i 2d. Subdivision name: �,Vi= �� 2e. NCDOT only, T.I.P. or state N/A JUL 0 2 2015 project no: 3. Owner Information DENR -LAND QUAL11 Y 1 J 3a. Name(s) on Recorded Deed: Trasco Inc. 51 Ut�Jivvrli Ci'. PEcl2'i! � rtNG I 3b. Deed Book and Page No. 1� 3c. Responsible Party (for LLC if I applicable): j 3d. Street address: 11 3e. City, state, zip: Wilmington, NC 28403 I 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version because written approval is not required? Certification: ❑ Yes ® No ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation ® Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h ® Yes ❑ No below. 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: N. Kerr Industrial Park; Phase III Sec II 2b. County: New Hanover County 2c. Nearest municipality / town: Wilmington ° �. p� i 2d. Subdivision name: �,Vi= �� 2e. NCDOT only, T.I.P. or state N/A JUL 0 2 2015 project no: 3. Owner Information DENR -LAND QUAL11 Y 1 J 3a. Name(s) on Recorded Deed: Trasco Inc. 51 Ut�Jivvrli Ci'. PEcl2'i! � rtNG I 3b. Deed Book and Page No. 1� 3c. Responsible Party (for LLC if I applicable): j 3d. Street address: 11 3e. City, state, zip: Wilmington, NC 28403 I 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) Page 2 of 11 ❑ Agent ®Other, specify: Applicant is the design /build General Contractor for 4a. Applicant is: the proiect. 4b. Name: Mr. John McCary 4c. Business name (if applicable): Cooper Construction 1 1 4d. Street address: 50045 1h Avenue South 4e. City, state, zip: 1I Birmingham, AL 35212 1I 4f. Telephone no.: 4g. Fax no.: jI 4h. Email address: 11 5. Agent/Consultant Information 1I (if applicable) 5a. Name: 1i Kim Williams I 5b. Business name (if applicable): Land Management Group, Inc. 1 5c. Street address: 3805 Wrightsville Avenue, Suite 15 5d. City, state, zip: Wilmington, NC 28403 5e. Telephone no.: 1 (910) 452 -0001 5f. Fax no.: 1I (910) 452 -0060 I 5g. Email address: kwilliams @lmgroup.net Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): 1 c. Property size: 2. Surface Waters Portion of R03400- 001 - 058 -000 Latitude: 34.2985 Longitude: - 77.8991 (DD.DDDDDD) (- DD.DDDDDD) 25.36 ac 2a. Name of nearest body of water (stream, river, etc.) to Acorn Branch proposed project: 2b. Water Quality Classification of nearest receiving water: C; Sw 2c. River basin: Cape Fear 03030007 1 3. Project Description I 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently undeveloped and forested. 3b. List the total estimated acreage of all existing wetlands on the property: — 1 acre 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a large distribution warehouse with associated parking, access, and stormwater facilities for FedEx. 3e. Describe the overall project in detail, including the type of equipment to be used: This project includes the construction of 213,000 -sf distribution warehouse, parking for employees and large and mid - sized trucks, two -way access and turn - around areas for loading /unloading, and stormwater facilities. Site will be cleared and graded. Stormwater facilities will be installed and roads /utilities will be constructed. Then building construction will occur. Track hoe, loader, dump truck, bob cat, and other standard construction equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Paul Farley Land Management Group, Inc. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Emily Hughes and Kyle Dahl of the USACE approved the wetland line in the field on 1/21/2015. Wetland surveys are included in this application for signature. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 6. Future Project Plans 6a. Is this a phased project? 6b. If yes, explain. ❑ Yes ® No Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary (T) W1 ®P ❑ T Fill for building Non - Riparian pad /access area ® Yes ❑ No ® Corps ® DWQ 0.246 Fill for access W2 ®P ❑ T Non - Riparian ® Yes ® Corps DWQ 0.032 area El No ® Fill for access W3 ®P ❑ T Non - Riparian ® Yes ® Corps ® DWQ 0.004 area El No Fill for access W4 ®P ❑ T Non - Riparian ® Yes ® Corps 0.165 area ❑ No ® DWQ W5 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.447 2h. Comments: 3. Stream Impacts N/A If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 13a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Open Water Impacts N/A If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary (T) 01 ❑P ❑T 02 ❑P ❑T I 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction N/A If pond or ake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 11 5f. Total ( I 5g. Comments: 1 5h. Is a dam high hazard permit required? El Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) N/A If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar-Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary (T) impact required? ❑Yes B1 ❑P ❑T ❑ No ❑ Yes B2 ❑ P ❑ T ❑ No F1 Yes B3 ❑P ❑T ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Impacts were minimized as much as possible through careful site design. The project will be a distribution center for FedEx. The proposed layout has been adjusted as much as possible to avoid wetland impacts while maintaining the site layout needed by FedEx to ensure safe access for the multiple vehicle types and sizes that frequently access the site. The builder must adhere to FedEx's requirements for the number of parking spaces for delivery trucks and their required turn clearances. The wetland impact areas are either truck parking, dock door conditions, or for drainage. The building has loading docks along the plan right side and drive in doors along the plan left side. The parking shown near Impact 3 has been shifted as far right as possible to avoid the wetlands and is constrained where it is shown due to a 20' buffer requirement for the property to the north. The extent of Impact 1 and 2 is due to providing drainage and the minimum pavement width for safe access around the building. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Silt fencing will be used during construction to reduce sediment from eroding into adjacent wetland areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ® Yes ❑ No impacts to Waters of the U S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ® Corps ® Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Northeast Cape Fear Mitigation Bank 3b. Credits Purchased (attach receipt and letter) I Type: Non - riparian I Quantity: 0.5 ac 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program N/A 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan N/A am 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ N/A 6a. Will the project result in an impact within a protected riparian buffer that requires I El Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan N/A 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 54.42 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Project engineer will prepare a stormwater plan prior to site construction. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ® Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been El Yes No attached? 5. DWQ 401 Unit Stormwater Review N/A 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form —Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project will not provide access or utilities to adjacent properties. No future wetland impacts are anticipated. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater generated by this project would tie into New Hanover County's system. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Yes ® No ❑ Yes ® No ❑ Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program GIS layer was used to determine the presence of federally - listed species. No federal or state listed species are known to occur within the project area. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? I ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish Habitat. The project area is not considered EFH or HAPC for any species. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office HPOWEB GIS mapping resource was used to determine the presence of cultural or historic resources. No cultural or historical resources were noted within the site. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? I ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System website was used to determine the boundaries of the 100 -year floodplain. Kim Williams 6/30/2015 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 AGENT AUTHORIZATION FORM TO WHOM IT MAY CONCERN: I /we, the undersigned, hereby authorize Land Management Group, Inc. to act as our agent in the preparation and representation of information related to the Section 404/401 permit application for the site. All questions in regards to this project should be directed to Land Management Group, Inc. Sincerely, Owplicant Iti46 V - Cane Print Naive &/�//-5Date ( J / 4G 0, Da. s� m 41,s as SITE 6Y P Teres Dr r'dan r Maur r Ightshoro Gp p� 5 --j' �tl I °i n *Boundaries are approximate and are not meant to be absolute. Map Source: World Street Map Sources: tsri", China (Hong h User Commur i E, DeLorme, USGS, Intermap !Esri (Thailand), TomTom, Ma N. Kerr Industrial Park; Ph III Sec II www.LMGroup.net New Hanover County, NC %41&� LMG Phone: 910.452.0001 •1.866.LMG.1078 LAND A,A\AGIN11,N1 l;R(Wl' Fax: 910.452.0060 June 2015 3805 Wrightsville Avenue, Wilmington, NC 28403 LMG# 03-14-200P E•,, �, „,,,�,..,,,.,� I , „�.��It,���. 9 g 1 S 2 04 �f � N O ja orp,, -NRC/ N', Esri . enStreelMap contri 0 Ut ray svt l SCALE 1” = 2000' Figure 1 Vicinity Map Y pq • .. . r Sv t -I , r ip yti rt � yf y, K jt�t� , 1 � ' fy � : f Y' oil 1w, '! m Ava ir ZI NI C. ��: .Xy�y�wil- :a �� �,,.• �• y ./ 4�s�►' +jl •� ,err �i . ^ 1 s a /i� C '/. b , } •�i, �' e r/l `r V f •r i °a *Boundaries are approximate and are • '" not meant to be absolute. Map Source: Castle Hayne Quadrangle 7.5 minute (topographic) SCALE 1" = 2000' N. Kerr Industrial Park; Ph III Sec II www.LMGroup.net New Hanover County, NC LMG Phone: 910.452.0001 •1.866.LMG.1078 Figure 2 1_ AND MANAGEMENT GROUP- Fax: 910.452.0060 USGS Topographic Map June 2015 tnvirmunental ConsulKt°ts 3805 Wrightsville Avenue, Wilmington, NC 28403 LMG# 03- 14 -200P J 'i *Boundaries are approximate and are ' r not meant to be absolute. Map Source: NRCS Soil Survey. SCALE 1" = 400' N. Kerr Industrial Park; Ph III Sec II New Hanover County, NC June 2015 LMG# 03- 14 -200P LMG www.LMGroup.net Phone: 910.452.0001 •1.866.LMG.1078 Fax: 910.452.0060 3805 Wrightsville Avenue, Wilmington, INC 28403 Figure 3 Soils Map i is�w *Boundaries are approximate and are not meant to be absolute. Map Source: 2012 NAPP aerial photography N. Kerr Industrial Park; Ph III Sec II New Hanover County, NC LMG June 2015 LAND MANAULIMEn r 6ROU P , -,, LMG# 03- 14 -200P Envl...nn n i,. ra� < ��n:uIn-nr; N 0 /+ b r- rn o f n ° FRw. LMGrou p. net =done 91q352.0001 •1.866.LMG.1078 -' Fax: 910.452.0060 380�Wrightsville Avenue, Wilmington, NC 28403 SCALE 1" = 300' Figure 4 Aerial Photograph j I I r 11 § '4 '. s 0 ci o Cc v r I 1 f p IT �)r n �HNN . f }i _ i! ; ,I+ 05'17'09 "E X10.2 �- II W I� Ir 11 w jf I P I k\ 0 1. >mo I A A -v a p s!g0 �I z ^N! �N +_ m m 324 / h I N04'27' "E / 609.17' �I11 I �Io T� 0 ( � I r , H 1 1 ,ice \ -TA < f C ' / \ 4: I Ilk/B I 1 ri ii m _ 320 SI 1'13'41 "W o� r 1 706.05' ~! PRELIMINARY DESIGN NOT RELEASED CRSTRCTIUN PROJECT STATUS fUENT INFOnMAnoN' REVISIONS'. �u.W; WETLAN I C (FIGURE PARAMOUNTE u.EO.. r PHASIA,'iN — (�I ,.. COOPER CONSrRUC110N �VII,�fI*iQ1'uN, VC P!11'F:I'1'FNILLF, NC DRAWING INFORMATION N. KF.R LJS'1� ?Al . I{ 5911 Okamk•r Dricc, Sni!c 251 5004 5TH AVENUE SOUTH m I U`r NEW IA _ J ,,�, (J %xidmin tun, Nurth (:arohna 25403 N(�RTI 17-1 L1N A� 91(1) 79 (707 (0) (9111) 791- G7(!(1 (f) Hll��ll \G}IAM, r11.35212 TN[: lacense iJ: (: -254( iii