Loading...
HomeMy WebLinkAbout20230236 Ver 1_USACE Permit_20230601DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 June 1, 2023 Regulatory Division Action ID No. SAW-2023-00527 and State Permit No.62-23 Mr. Mark Lewis 405 Lewis Road Hampstead, NC 28443 marklewis kembargmail. com Dear Mr. Lewis: Reference your application to construct an eight -slip docking facility, replace a failing bulkhead, and conduct maintenance dredging in waters around the proposed docking facility, located at the end of Lewis Road, north of Hampstead, in Pender County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with applicable State authorization, attached Federal special conditions, and the approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2026. Questions or comments may be addressed to Ms. Liz Hair, Wilmington Field Office, Regulatory Branch, email: sarah.e.hair(&,usace.army.mil. -2- Sincerely, Liz Hair, Project Manager Wilmington Regulatory Field Office Enclosures: RGP 291 conditions CAMA permit No. 62-23 dated 05/30/2023 Plans dated 2/20/2023 (revised) 401 Certification dated 5/4/2023 Manatee Guidelines Electronic copies Furnished: Davey Resource Group, Inc.; Mr. Greg Finch/Mr. William Dortch NOAA/NMFS; Dr. Pace Wilber/ Ms. Twyla Cheatwood NCDEQ/DCM; Mr. Cameron Luck/ Ms. Amanda Cannon NCDEQ/DWR; Ms. Holley Snider USFWS; Mr. Pete Benjamin/ Mr. John Ellis USEPA; Mr. Todd Allen Bowers USCG; BOSN4 Mr. Paul Bertram USACE-Nav; Mr. Justin Amette DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403-1343 http://www.saw.usace.army.mil/Missions/Re ug latoryPermitPro rg am.aspx General Permit No. 198000291 Name of Permittee: General Public Effective Date: January 01, 2022 Expiration Date: December 31, 2026 DEPARTMENT OF THE ARMY REGIONAL GENERAL PERMIT (RGP) A RGP to do work in or affecting navigable waters of the U.S. and waters of the U.S., upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of March 3, 1899 (U.S.C. 403), and Section 404 of the Clean Water Act (33 U.S.C. 1344), is hereby issued by authority of the Secretary of the Army by District Engineer U.S. Army Engineer District, Wilmington Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403-1343 TO AUTHORIZE THOSE CONSTRUCTION ACTIVITIES IN THE 20 COASTAL COUNTIES RECEIVING PRIOR APPROVAL FROM THE STATE OF NORTH CAROLINA IN THE FORM OF A COASTAL AREA MANAGEMENT ACT (CAMA) PERMIT, AND/OR A STATE DREDGE AND FILL PERMIT, AND IF REQUIRED, A WATER QUALITY CERTIFICATION, THAT ARE OTHERWISE NOT ELIGIBLE FOR FEDERAL AUTHORIZATION IN THE FORM OF A NATIONWIDE PERMIT OR ANOTHER RGP. Operatinst Procedures a. Applications for joint state and federal authorization under this programmatic RGP will be accepted through the North Carolina Division of Coastal Management (NCDCM). Receipt of a complete application by the NCDCM will initiate the State's field review that will include a site visit and preparation of a Field Investigation Report and a state Bio-Report. The NCDCM will forward a copy of the complete application, its Field Investigation Report, and its Bio-Report, to the appropriate Corps of Engineers field office, thereby initiating federal review of the project. The Corps, upon receipt of an application, will immediately assign an action identification number, acknowledge receipt thereof, and examine the application to assure that it can be processed pursuant to this programmatic RGP. The applicant and the NCDCM will be furnished written notification of the Corps' determination. Notification to the applicant will include a brief description of the administrative process. b. For those proposals that may result in a discharge into waters of the U.S., including wetlands, the North Carolina Division of Water Resources (NCDWR) and the applicant will be informed regarding the applicant's need to obtain a Water Quality Certification in accordance with section 401 of the Clean Water Act. c. If, at any time, the Corps determines that a proposed activity is eligible for authorization under another regional RGP or a nationwide permit (NWP), this procedure may be terminated and the activity authorized pursuant to the terms and conditions of the appropriate RGP or NWP. d. The permit review process conducted by the NCDCM is a public process involving publication of public notices in local newspapers, public hearings, and various public appeal procedures. The Corps may issue a separate public notice for a specific proposal if it is deemed necessary for compliance with appropriate laws, regulation, and guidance. e. This RGP does not, in any way, alter established procedures or responsibilities, as required by federal laws, memoranda of agreements (MOA's) or administrative regulations, with respect to the Corps' coordination with appropriate review agencies. The applicant will continue to have the opportunity to rebut any objections to a proposal. f. The Corps will provide copies of the application and plans, the NCDCM's Field Investigation Report, and the state Bio-Report, to the U.S. Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS) the U.S. Environmental Protection Agency (EPA), and any other federal agency that the Corps determines to be a necessary review agency (collectively, the "Federal Agencies"). Receipt of this material will initiate the Federal Agencies' review. The Federal Agencies will be allowed sufficient time, normally thirty (30) days, to provide the Corps with their comments and recommendations, including any proposed permit special conditions and recommendations of denial. The Corps may grant extensions of time for Federal Agency review if justified by unusual circumstances. If an extension is granted that would substantially delay an NCDCM decision, the application may be removed from this RGP process. g. The Corps will receive and review all Federal Agency comments as well as any applicant rebuttal. Provided all Federal Agencies and the Corps are in agreement, the Corps will prepare a coordinated federal position incorporating all Federal Agency comments, including proposed permit special conditions and any recommendations for denial. The Corps will typically furnish this coordinated federal position to the NCDCM within 45 days of its receipt of the complete application, and copies of the Field Investigation Report and Bio-Report. h. If the Corps does not concur with a Federal Agency's comments or recommendations, the Corps will contact the Federal Agency and advise it of the Corps' position. Attempts to resolve the issue may include initiating the referral procedures outlined by current memoranda of agreement (MOA's) between the Department of the Army and the agency. No coordinated federal position will be furnished to the NCDCM until and unless the Corps receives written agreement from the Federal Agency that all issues have been resolved to the satisfaction of that agency. i. If any of the recommendations and/or conditions included in the coordinated federal position are unacceptable to the NCDCM, the NCDCM will contact the Corps within ten (10) days of receipt of the coordinated federal position and attempt to resolve the conflict. If resolution of the conflict involves changes to the conditions or recommendations provided by the Federal Agencies, the provisions of paragraphs g. and h. (above) will apply. If the conflict is resolved to the satisfaction of the Corps and any affected Federal Agency, the NCDCM permit will be issued and the authority of this RGP will apply. j. If a Federal Agency conflict is not resolved within the time necessary for a decision by the NCDCM, the NCDCM may proceed, independently, to conclude the state action without inclusion of the federal position. In such case, the applicant and the NCDCM will be notified immediately, in writing, that the state permit does not satisfy the federal permit requirements and that the proposal in question may not proceed without federal authorization. k. If the coordinated federal position is not in conflict with state agencies' positions, law, regulation, or policy, and is acceptable to the NCDCM, a state permit will be developed by the NCDCM fully incorporating the state and federal positions. The NCDCM will furnish copies of the final permit to the applicant and the Corps. The NCDWR will furnish a copy of the Section 401 Water Quality Certification, if required, to the applicant and the Corps. The Corps will not confirm the authorization of a proposed project under this RGP until the issuance of the NCDCM permit and, if required, the Section 401 Water Quality Certification. 1. If the NCDCM permit or Section 401 Water Quality Certification is denied, the applicant will be informed that federal authorization is denied without prejudice. in. No work may proceed under this RGP until the Wilmington District Engineer or his representative provides written verification that the procedures and conditions of the RGP have been satisfied. n. The NCDCM and the Corps will monitor all permitted work and periodically inspect projects for compliance with permit conditions and applicable state and federal regulations. If any violation of the NCDCM permit is discovered which would also constitute a violation of the federal position, both the NCDCM and the Corps, in accordance with their respective regulations and policies, may take enforcement action. o. This RGP will not be used to authorize an activity when the Wilmington District Engineer determines that the proposed activity would significantly affect the quality of the human environment and therefore require preparation of an Environmental Impact Statement (EIS). General Conditions a. Authorized structures located on or adjacent to Federally authorized waterways will be constructed in accordance with the latest setback criteria established by the Wilmington District Engineer. You may review the setback policy at http://www.saw.usace.arM.mil/Missions/Navigation/Setbacks.awx. This RGP does not authorize the construction of hardened or permanently fixed structures within the Federally Authorized Channel Setback, unless the activity is approved by the Corps. The Permittee must obtain approval from the Corps prior to the construction of any structures within the Federally Authorized Channel Setback. b. Except as authorized by this RGP or any Corps approved modification to this RGP, no excavation, fill or mechanized land -clearing activities shall take place, at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. c. Authorization under this RGP does not obviate the need to obtain other federal, state, or local authorizations. d. All work authorized by this RGP must comply with the terms and conditions of the applicable Clean Water Act Section 401 Water Quality Certification for this RGP issued by the North Carolina Division of Water Resources. e. The Permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). f. The activities authorized by this RGP must not interfere with the public's right to free navigation on all navigable waters of the U.S. No attempt will be made by the Permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for a reason other than safety. g. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his/her authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps , to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. h. The Permittee, upon receipt of a notice of revocation of the permit for the verified individual activity, may apply for an individual permit, or will, without expense to the United States and in such time and manner as the Secretary of the Army or his/her authorized representative may direct, restore the affected water of the US to its former conditions. i. This RGP does not authorize any activity that would conflict with a federal project's congressionally authorized purposes, established limitations or restrictions, or limit an agency's ability to conduct necessary operation and maintenance functions. Per Section 14 of the Rivers and Harbors Act of 1899, as amended (33 U.S.C. 408), no project that has the potential to take possession of or make use of for any purpose, or build upon, alter, deface, destroy, move, injure, or obstruct a federally constructed work or project, including, but not limited to, levees, dams, jetties, navigation channels, borrow areas, dredged material disposal sites, flood control projects, etc., shall be permitted unless the project has been reviewed and approved by the appropriate Corps approval authority. j. The Permittee shall obtain a Consent to Cross Government Easement from the Wilmington District's Land Use Coordinator prior to any crossing of the Corps easement and/or prior to commencing construction of any structures, authorized dredging, or other work within the right-of-way of, or in proximity to, a federally designated disposal area. The Land Use Coordinator may be contacted at: CESAW-OP-N, 69 Darlington Avenue, Wilmington, North Carolina 28403-1343, email: SAWWeb-NAVgusace.army.mil. k. The Permittee will allow the Wilmington District Engineer or his/her representative to inspect the authorized activity at any time deemed necessary to assure that the activity is being performed or maintained in strict accordance with the Special and General Conditions of this permit. 1. This RGP does not grant any property rights or exclusive privileges. in. This RGP does not authorize any injury to the property or rights of others. n. This RGP does not authorize the interference with any existing or proposed federal project. o. In issuing this RGP, the Federal Government does not assume any liability for the following: (1) Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. (2) Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. (3) Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this RGP. (4) Design or construction deficiencies associated with the permitted work. (5) Damage claims associated with any future modification, suspension, or revocation of this RGP. p. Authorization provided by this RGP may be modified, suspended, or revoked in whole or in part if the Wilmington District Engineer, acting for the Secretary of the Army, determines that such action would be in the best public interest. The term of this RGP shall be five (5) years unless subject to modification, suspension, or revocation. Any modification, suspension or revocation of this authorization will not be the basis for any claim for damages against the United States Government. q. No activity may occur in a component of the National Wild and Scenic Rivers System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic designation or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or "study river" (e.g., National Park Service, U.S. Forest Service, etc.) r. This RGP does not authorize any activity within, or directly affecting, a marine sanctuary established by the Secretary of Commerce under authority of Section 302 of the Marine Protection, Research and Sanctuaries Act of 1972, unless the applicant provides the Corps with a certification from the Secretary of Commerce that the proposed activity is consistent with the purposes of Title III of the Marine Protection, Research and Sanctuaries Act. Information on marine sanctuaries may be obtained at http://sanctuaries.noaa.gov/#MN. Permittees may not begin work until they provide the Corps with a written certification from the Department of Commerce. s. In cases where the Wilmington District Engineer determines that the activity may affect properties listed, or eligible for listing, in the National Register of Historic Places and its codified regulations, the National Historic Preservation Amendment Acts of 1980 and 1992, the Abandoned Shipwreck Act of 1987 and the Native American Graves Protection and Repatriation Act, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied. Permittees may not begin work until notified by the Corps that the requirements of the NHPA have been satisfied and that the activity is authorized. t. If you discover any previously unknown historic, cultural, or archeological remains and artifacts while accomplishing the activity authorized by this RGP, you must immediately notify the Wilmington District Engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The Wilmington District Engineer will initiate the Federal, tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. u. Endangered Species. (1) No activity is authorized under this RGP which is likely to jeopardize the continued existence of a threatened or endangered species directly or indirectly or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under this RGP which "may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed. (2) Federal agencies should follow their own procedures for complying with the requirements of the ESA. Federal prospective Permittees (and when FHWA is the lead federal agency) must provide the District Engineer with the appropriate documentation to demonstrate compliance with those requirements. The District Engineer will review the documentation and determine whether it is sufficient to address ESA compliance for the RGP activity, or whether additional ESA consultation is necessary. (3) As a result of formal or informal consultation with the U.S. Fish and Wildlife Service (USFWS) or NMFS, the District Engineer may add species -specific endangered species conditions to the RGP verification letter for a project. (4) Authorization of an activity by a RGP does not authorize the "take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from the USFWS or the NMFS, the ESA prohibits any person subject to the jurisdiction of the U.S. to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word "harm" in the definition of "take" means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering. (5) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the USFWS in Raleigh, North Carolina at the address provided below, or from the USFWS and NMFS via their world wide web pages at http://www.fws.gov/ or http://www.fws.g_ov/ipac and http://www.noaa.gov/fisheries.html respectively. The Raleigh USFWS Office covers all NC counties east of, and including, Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties. US Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Telephone: (919) 856-4520 (6) The Wilmington District, USFWS, NCDOT, and the FHWA have conducted programmatic Section 7(a)(2) consultation for a number of federally listed species and habitat, and programmatic consultation concerning other federally listed species and/or habitat may occur in the future. The result of completed programmatic consultation is a Programmatic Biological Opinion (PBO) issued by the USFWS. These PBOs contain mandatory terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take" of whichever species or critical habitat is covered by a specific PBO. Authorization under this RGP is conditional upon the Permittee's compliance with all the mandatory terms and conditions associated with incidental take of the applicable PBO (or PBOs), which are incorporated by reference in this RGP. Failure to comply with the terms and conditions associated with incidental take of an applicable PBO, where a take of the federally listed species occurs, would constitute an unauthorized take by the Permittee, and would also constitute Permittee non-compliance with the authorization under this RGP. If the terms and conditions of a specific PBO (or PBOs) apply to a project, the Corps will include this/these requirements in any RGP verification that may be issued for a project. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. (7) Northern long-eared bat (NLEB) (Myotis septentrionalis). Standard Local Operating Procedures for Endangered Species (SLOPES) for the NLEB have been approved by the Corps and the U.S. Fish and Wildlife Service. See http://www.saw.usace.ariny.mil/Missions/Re ug latory-Permit-Pro rg am/A ency- Coordination/ESA/. This SLOPES details how the Corps will make determinations of effect to the NLEB when the Corps is the lead federal agency for an NCDOT project that is located in the western 41 counties of North Carolina. This SLOPES do not address NCDOT projects (either federal or state funded) in the eastern 59 counties in North Carolina. Note that if another federal agency is the lead federal agency for a project in the western 41 counties, procedures for satisfying the requirements of Section 7(a)(2) of the ESA will be dictated by that agency and will not be applicable for consideration under the SLOPES; however, information that demonstrates the lead federal agency's (if other than the Corps) compliance with Section 7(a)(2) / 4(d) Rule for the NLEB, will be required in the PCN. Note that at the time of issuance of this RGP, the federal listing status of the NLEB as "Threatened" is being litigated at the National level. If, as a result of litigation, the NLEB is federally listed as "Endangered", this general condition ("s") will no longer be applicable because the 4(d) Rule, and this NLEB SLOPES, will no longer apply/be valid. (8) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/1\4anateeGuidelines20l7.pdf (9) If the Permittee discovers or observes any live, damaged, injured, or dead individual of an endangered or threatened species during construction, the Permittee shall immediately notify the Wilmington District Engineer so that required coordination can be initiated with the U.S. Fish and Wildlife Service and/or National Marine Fisheries Service. v. Permittees are advised that development activities in or near a floodway may be subject to the National Flood Insurance Program that prohibits any development, including fill, within a floodway that results in any increase in base flood elevations. This RGP does not authorize any activity prohibited by the National Flood Insurance Program. w. The Permittee must install and maintain, at his/her expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the Permittee should contact Coast Guard Sector North Carolina at (910) 772-2191 or email Coast Guard Fifth District at cgd5waterways&uscg.mil. x. If the display of lights and signals on the authorized structure is not otherwise provided for by law, such lights and signals as may be prescribed by the U.S. Coast Guard will be installed and maintained by and at the expense of the Permittee. y. It is possible that an authorized structure may be damaged by wave wash from passing vessels. The issuance of this RGP does not relieve the Permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The Permittee will not hold the United States liable for any such damage. z. Structures and their attendant utilities, authorized by this RGP, located on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW), will be removed at the expense of the Permittee, in the event that, in the judgment of the Corps acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. Permanent buildings will not be constructed within the easement. aa. The Permittee must maintain any structure or work authorized by this RGP in good condition and in conformance with the terms and conditions of this RGP. The Permittee is not relieved of this requirement if the Permittee abandons the structure or work. Transfer in fee simple of the work authorized by this RGP will automatically transfer this RGP to the property's new owner, with all of the rights and responsibilities enumerated herein. The Permittee must inform any subsequent owner of all activities undertaken under the authority of this RGP and provide the subsequent owner with a copy of the terms and conditions of this RGP. bb. At his/her sole discretion, any time during the processing cycle, the Wilmington District Engineer may determine that this RGP will not be applicable to a specific proposal. In such case, the procedures for processing an individual permit in accordance with 33 CFR 325 will be available. cc. Except as authorized by this RGP or any Corps approved modification to this RGP, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. dd Except as authorized by this RGP or any Corps approved modification to this RGP, all excavated material will be disposed of in approved upland disposal areas. ee. Activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon this RGP will remain authorized provided the activity is completed within twelve months of the date of the RGP's expiration, modification, or revocation. Activities completed under the authorization of this RGP that were in effect at the time the activity was completed continue to be authorized by the RGP. BY AUTHORITY OF THE SECRETARY OF THE ARMY: WamiA.ett Colonel, U.S. Army District Commander Permit Class NEW Permit Number 62-23 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission r r t nit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Mark Lewis, 405 Lewis Road, Hampstead, NC 28443 Authorizing development in Pender County adj. to AIWW at eastern Terminus of Lewis Road (PIN 4224- 02-7174-0000) in Hampstead, as requested in the permittee's application dated 2/20/23 (MP-1, MP-2, MP-3, MP-4), including attached workplan drawings (5) Sheets 1-5 of 5 dated 2/20/23. This permit, issued on May 30, 2023 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to civil or criminal penalties; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes the construction of the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes a maximum of 8 formalized boat slips at this docking facility. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on May 30, 2028 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Mark Lewis ADDITIONAL CONDITIONS Permit No. 62-23 Page 2 of 5 3) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 4) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7) All portions of the authorized structure shall have a minimum setback distance of 15 feet between any parts of the structure and the eastern adjacent property owner's area of riparian access. 8) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Upland Development 9) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the wooden walkway all as expressly and specifically set forth in the attached permit application and workplan drawings. Bulkhead Replacement 10) The bulkhead shall extend a maximum of two (2) foot waterward from the waterward edge of the existing bulkhead at any point along its alignment at the time of construction. 11) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 12) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. 13) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 14) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. Mark Lewis ADDITIONAL CONDITIONS 15) The bulkhead shall be constructed prior to any backfilling activities. Permit No. 62-23 Page 3 of 5 16) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 17) The fill material shall be clean and free of any pollutants except in trace quantities. 18) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 19) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will be used to backfill the area behind the permitted bulkhead. 20) All fill material to be placed below normal high-water level shall be confined behind the permitted bulkhead. Upland and Maintenance Excavation 21) Unless specifically altered herein, this permit authorizes the upland excavation associated with the development of the above referenced property and basin expansion, all as expressly and specifically set forth in the attached permit application and workplan drawings. 22) In order to protect juvenile shrimp and finfish populations, no excavation or filling shall be permitted between April 1 and September 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 23) No excavation shall take place outside of the area indicated on the workplan drawings. 24) Excavation shall not exceed -6 feet below the mean water level. In no case shall the depth of excavation exceed the depth of connecting waters. 25) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 26) No excavation shall take place within 10 feet of any Coastal Wetlands. 27) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the recent of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733-5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. Mark Lewis ADDITIONAL CONDITIONS Maintenance Clause Permit No. 62-23 Page 4 of 5 28) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the area to be used for dredge material disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the dredge material disposal site shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. Dredge Material Disposal 29) All excavated materials shall be confined above normal high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. The barriers shall be maintained and functional until the site is graded and stabilized. 30) The diked disposal area shall be constructed a sufficient distance from the normal high-water level or any marsh and sufficiently maintained to eliminate the possibility of dike erosion or dredge material deposition into surrounding wetlands or waters. 31) The dredge material disposal area shall be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. 32) The permittee and/or their contractor shall take all necessary precautions to ensure that the dredge material is properly contained during transport to the disposal site, and that all the proper coordination has taken place with the local or state governments to ensure that any damage to public streets caused by transport of the dredge material has been addressed. 33) Dredge material from the authorized dredge footprint shall be dewatered before use as backfill. All remaining backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. USACE Conditions 34) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. Sedimentation and Erosion Control 35) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 36) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. Mark Lewis ADDITIONAL CONDITIONS Permit No. 62-23 Page 5 of 5 37) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 38) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 39) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 40) The permittee and/or their contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2023-00527). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Individual Water Quality Certification 5873 and assigned the project DWR Project No. 20230238. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. Appx. Outer Edge of Marsh 30' CAMA Buffer 404 Wetland Line r- 10' Offset from Coastal Wetlands 5.;...r...r u rr ■ n r rr r r it i■ i rr ■ r r r 1- 'N.MmiMason siii4iiiiii iuir,aiiiiiaA�rpirari lrrr\rr�rrrrmoffiirrrrr■■rrrrrY�rrrgrrrrrrI qurrr.r.,,,`= �■rorrurrrrrrr.rrrurrm nrurrrerrruq._"`_- rr+F����w:rrrar�•urrurrr ii iiiir�i,-�„ rrrHo pl Ara. rrr ■�r���.:.:rrrrr.rrrarrr.■oi._enxYrWu�rr��-a:oT. uunwu�:arrur;.. ... _', •rrrri nr��i..: nron�rr� rri, t /Mean Proposed Bulkhead -14High Water ■■roposed Upland Cut Area j Proposed Maintenance Dredge Area ' (--7,200 sq ft to -6' MLW 1,400 cu yd) ' SAV Boundary (GIS 1981-2015) Existing Pierhead Line -` Riparian Line per CAMA Permit 172-07 and 15' Setback a Waterbody Width 9 LO Existing Maintenance Dredge Area (CAMA Permit 172-07 123-91) (-1,200 sq ft = -630 cu yd)-----______ ��� 75' AEC all ■■ ■■ .. ■ ," `-- _ _ - Proposed -- Bulkhead -184' , ■ ; R ; � "" ' � - �~ -- Pro osed Wooden FEB 2 8 2023 1)(;M WILMIN(;TON, NC; Subject Parcel Boundary Taxparcels USACE Right of Way USAGE Setback USAGE Navigation Channel 30' CAMA Buffer Proposed Dock and Pier SAV Boundary Walkway (4' x 158')- r � i ------- Existing Concrete Boat Lift (to remain)�� SAV Boundary (GIS 1981-2015) Adjacent Permitted Dredge Boundary (CAMA Major #27-18) 6 4 -- -- - Proposed Bulkhead/ MHW - NOTES'. Existing Bulkhead 1 2019 PARCELS FROM NC ONEMAP Riparian Corridor - -- 2 PROPERTY BOUNDARY BELOW MEAN HIGH WATER NOT SHOWN. 15' Setback - - - - -- 3. BASE CAD FILE FROM PARAMOUNTE ENGINEERING. .Y.e Existing Plerhead Line — — — 4, WIDTH OF WATERBODY IS APPROXIMATELY 1 000'. 5 HYDROGRAPHIC SURVEY FROM TI COASTAL COLLECTED MAY 27, 2021 AND REPRESENT CONDITIONS K Proposed Dredge Area THAT TIME REFERENCED TO MLW NAVD88. 6. NOT A SURVEYED OR ENGINEERED DRAWING. FOR ENVIRONMENTAL PFRMITTING ONLY. Concrete Piers 0 20 40 80 IV iiiii DAV"T-_ Resource Group 3805 Wrightsville Ave Suite 15 Wilmington, North Carolina 28403 910-452-0001 Project. Date Revision ❑ale: Lewis Road - 1/10/2023 2/20/2023 Mark Lewis Scale Job Number. Title 1"=40' DRGNCW22.504 Water Depths and Orawn By Sheet Number. Dredge Plan View WAD 4 of 5