HomeMy WebLinkAboutWQ0033097_Monitoring - 06-2023_20230725 (2)Monitoring Report Submittal
.....................................................
Permit Number#* WQ0033097
Name of Facility:* EATONS Crossing Subdivision
Month: * June Year: * 2023
Report Information
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR EATONS JUNE WWTP 2023.pdf 318.63KB
PDF Only
NDMR, NDAR-1, NDAR-2, NDMLR EATONS SPRAY JUNE 2023.pdf 745.88KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address: * dmwilson68@gmail.com
Name of Submitter: * Dennis Wilson
Signature:
AOiW1W eW.. W11-/Iwist.
Date of submittal: 7/25/2023
This will be filled in automatically
Initial Review
Reviewer: Wanda.Gerald
Is the project number correct?* WQ0033097
Is the monitoring report accepted?* Yes No
Regional Office* Raleigh
Reviewer:
Review Date:
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _2 of _6
Permit No.: WQ0033097
Facility Name: Eaton's• • WWTP1
irrigation
• occur
at this facility?
1 �
1 •
1
1
■ YES ® NO
1
1
1
1
1
1
1
1
WIII1711�
FORM: NDAR-1 10-13
NON -DISCHARGE APPLICATION REPORT (NDAR-1)
Page _6_ of _6_
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
❑ compliant
❑ Non -compliant
❑ compliant
❑ Non -compliant
❑ compliant
❑ Non -compliant
❑ compliant
❑ Non -compliant
❑ compliant ❑ Non -compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Dennis Wilson Sr.
Permittee:
Eaton's Crossing NC LP
Certification No.: 12972 WW SI 10000093
Signing Official: Dennis Wilson Sr.
Grade: IV Phone Number: 919-691-2505
Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? yes 0 No
Phone Number: 919-691-2505 Permit Exp.: 5/31/25
7/25/23
7/25/23
Signa ure Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Formulas
Volume Applied (gallons)
Daily Loading (inches) = gallons
Area (acres) 27,152 acre • inch
If Time Irrigated is < 60 minutes:
aximumHourly Loading (inches) = Dail} Loading (inches)
If Time Irrigated is >_ 60 minutes:
:'+lraximurrtHourly Loading (inches) = ail} Loading (inches) minutes
60
Time Irrigated (minutes) hour
Monthly Loading (inches) =.Sum of Daily Loading (inches)
12 Moni:h.F'loating Total (inches) = Sum of this monthrsMonth.ly Loading (inches) and previ,
Weather Codes
Clear
C
Cloudy
CL
Partly Cloudy
PC
Rain
R
Sleet
SL
Snow
SN