Loading...
HomeMy WebLinkAboutWQ0033097_Monitoring - 06-2023_20230725 (2)Monitoring Report Submittal ..................................................... Permit Number#* WQ0033097 Name of Facility:* EATONS Crossing Subdivision Month: * June Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR EATONS JUNE WWTP 2023.pdf 318.63KB PDF Only NDMR, NDAR-1, NDAR-2, NDMLR EATONS SPRAY JUNE 2023.pdf 745.88KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * dmwilson68@gmail.com Name of Submitter: * Dennis Wilson Signature: AOiW1W eW.. W11-/Iwist. Date of submittal: 7/25/2023 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* WQ0033097 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Reviewer: Review Date: FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _2 of _6 Permit No.: WQ0033097 Facility Name: Eaton's• • WWTP1 irrigation • occur at this facility? 1 � 1 • 1 1 ■ YES ® NO 1 1 1 1 1 1 1 1 WIII1711� FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _6_ of _6_ Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑ compliant ❑ Non -compliant ❑ compliant ❑ Non -compliant ❑ compliant ❑ Non -compliant ❑ compliant ❑ Non -compliant ❑ compliant ❑ Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Dennis Wilson Sr. Permittee: Eaton's Crossing NC LP Certification No.: 12972 WW SI 10000093 Signing Official: Dennis Wilson Sr. Grade: IV Phone Number: 919-691-2505 Signing Official's Title: ORC Has the ORC changed since the previous NDAR-1? yes 0 No Phone Number: 919-691-2505 Permit Exp.: 5/31/25 7/25/23 7/25/23 Signa ure Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Formulas Volume Applied (gallons) Daily Loading (inches) = gallons Area (acres) 27,152 acre • inch If Time Irrigated is < 60 minutes: aximumHourly Loading (inches) = Dail} Loading (inches) If Time Irrigated is >_ 60 minutes: :'+lraximurrtHourly Loading (inches) = ail} Loading (inches) minutes 60 Time Irrigated (minutes) hour Monthly Loading (inches) =.Sum of Daily Loading (inches) 12 Moni:h.F'loating Total (inches) = Sum of this monthrsMonth.ly Loading (inches) and previ, Weather Codes Clear C Cloudy CL Partly Cloudy PC Rain R Sleet SL Snow SN