Loading...
HomeMy WebLinkAboutI-5507-sediment loss report.pdfMr. Dave Wanucha, NCDOT had sediment losses at three sites for the 1-5507 (1-485) project south of Charlotte. USACE: SAW-2013-02330 NCDWR: 20191337 Work crews have cleaned up the sites. Bucket counts and photos for each site are provided below. Weddington Road, YSRPD WLB, culvert outlet of the 'Grassed Detention Basin' flows into a small wetland. Up to 7 inches of sediment deposited in small wetland. 295 buckets of sediment removed from small wetland. After Cleanup Before cleanup. Permit Site #31 5 buckets of sediment removed from stream channel and stream bank. Before cleanup. Ow L LAN yp . A " --.- "-- "'� After cleanup. �71 4E A, OL I Culvert outlet from Permit Site #31 7 buckets of sediment removed from stream channel and stream bank. Before cleanup. After cleanup.