Loading...
HomeMy WebLinkAboutSW8960912_Compliance Evaluation Inspection_20050809�F WATFq Michael F. Easley, Governor Al `G William G. Ross, Jr., Secretary co 7 North Carolina Department of Environment and Natural Resources —1 Alan W. Klimek, P.E. Director Division of Water Quality August 9, 2005 Mr. Ralph H. Griffin, Jr. Post Office Box 205 Wrightsville Beach, NC 28480 NOTICE OF INSPECTION: American Auto & Finance Stormwater Project No. SW8 960912 New Hanover County Dear Mr. Griffin: Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report": The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on August 8, 2005 to determine compliance with Stormwater Permit Number SW8 960912 issued on November 25, 1996. A summary of the findings and comments are noted under Section 4 of the report. Please inform this Office in writing before September 9, 2005 of the specific actions that will be undertaken and the time frame required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action. If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 395- 3900. Sincerely, Gary Beecher Environmental Technician EB/ghb: S:IWQSISTORMWATIINSPECT1960912.Aug05 cc: Mark Hargrove, P.E (WK Dickson) Wilmington Regional Office Gary Beecher (DWQ) North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Servicel-877-623-6748 Wilmington Regional Office Wilmington, NC 28405,3845 FAX (919) 733-2496 Internet: h2o.enr.state.nc.us ne 1W�orthCarolina An Equal OpportuniVAfrirmative Action Employer— 50% Recycled110% Post Consumer Paper AaA aafltk STORMWATER COMPLIANCE INSPECTION REPORT 1. Project Name: American Autry & Finance Project Number: 960912 Control Measure: Wet Fund Water Body: !CVVW Classification: Directions to site: Carolina Beach Road 2. Inspection Date: August 8, 2005 Weather Conditions: Warm and Damp (80's) 3. Compliance Issues: (a Both suc if,; s the pond are over grown. A storrnwater pond cannot have more than 50% of its. surface. covered by vegetation. (h, This is to remind you that the per!.nit for this site expires on November 25, 2006. T h.+. site muse be in comnpfianice before the permit" can be renewed. 4. Required Actions: (Explain each deficiency and what needs to be done to bring the system back into compliance) (a) RerT-io -v and thin -out anne of the, shrub.'Cimy and coat-iai:s throughout both s sec ions of tho, pond. Thank You Inspector: Gay Beecher Water Quality/Wilmington Regional Office: (910) 796-7215 RSS/ghb: S:IWQSISTORMWATIINSPECT1960912.Aug05 2 .SI�-aS COMPLLkNCE STUDY" REQUIREMENTS DETENTION PON,-D Project Name: GPS Position: '� Permit No. �N 1• Does the plan show the proposed contours, spot elevations, and finished floo elevations (if applicable) , r Y N 2. Is the Mean High Water Line Y N 4• LocaI Jurisdictishown on the plans, if applicable? on Y N 5• Name, mailing address & phone number of permit tee, developer or current owner Y N 6. Do we have a copy of the recorded Deed restrictions with all required statements? I, N (Applies to subdivisions, out parcels, future development, etc.) 7. If the development is a subdivision, has the lot BUA been complied with? Y N 8. Is the amount of the BUA in accord with the approved plans? Check dimension buildings, parking, sidewalks, roads, etc. s of Y N 9. Is the location of the BUA in accord with the approved plan? Y N 1 �• Is the grading of the BUA in accord with the approved plan? Y N 11. Is there any additional BUA not shown on the approved plan? Y N 12. Is the Drainage Area to each system per the approved plans? Y N 13. Is there any off -site drainage that has not been accounted for? Observe the erimeter the project for offsite flow or piping. P of Y N 14. Is the permanent pool surface area per the approved plans (appros)? Y. N 15. Is the shape of the pond per the plans? (i.e., area, 3:1 L:W ratio) Y N 16. Has a Vegetated filter been provided at the outlet if the 85% TSS chart was used Y N is it constructed per the plan and stabilized with grass? ,and 17. Is a Fore bay provided? (Ponds permitted prior to September, 1995 will not have fore bays.) Y N 1.8• Does all the runoff from the parking P &roofs ultimately. drain into the fore bay? Check Y N the backs of buildings to verb roof drainage. i 9. Are the Inlets located per the approved plans, such that no short-circuiting occurs? Y N 20. Does the pond have a 6:1 sloped Vegetated shelf located below permanent pool? I, N (Ponds permitted prior to September 1995 will not have a she 21. Is the shelf profusely planted with wetlands plants? 12 3 4 5 Y N 22. Do the slopes have sufficient permanent grass cover? 12 3 4 5 Y N 23. Does the pond have a 3:1 slope above the permanent pool? Y N 24. Is the Outlet structure with trash rack and orifice provided and located per th approved plans? p e Y N 25. Are the Orifice and overflow invert elevations per the approved plans? lvfeasure th relative distance benveen them. e Y N 26. Has the Designer's Certification been submitted? Y N 27. Has a water sample been taken at the outlet? 28. What is the soil type (from County Soils Maps) 29• The consulting company that prepared the plans? Y N 30• Are there any violations? Y N 31 • Previously inspected? Comments: /0' 1'�� ci GG64 vB r-o