HomeMy WebLinkAboutColeman Dr Proposed Impacts Exhibit - Mod #1.pdf�� cF\ \
x a 333d_ _3»d_ \ AM I C #1 / RADING LIMITS �ccF
5N1EL 225.E 05 AC F I ACT
E �
3
PCCE — PC A ��Ca9w—�
d
REAM RAIDING LIMITS
TREAM IMPACT #2 - DUE TO RIPRAP /5
i
STREAM 4
s PCCE Et 44.66 LF
CCEs� sew
/
P - �88.�'50 SF (0 hC M F PKCT oE—
€€-- /
\ \PCC — SWEL I �� SDE—E
— PCCE — — PCCE / MCP. SDE— -DE
cc
/ STREAM 5
WETLAND IMPACT # \
WETLAN 5 N E ISTING POND
27.94 SF (0.019 AC) OF IM CT
1 XISTI RM
PE O R MAIN
m
F_ /
OS
XISTING STORM PIPE
SEGMENTS TO BE REMOVED \ ao
1 u"
EXISTING POND TEMPORARY STREAM IMPACT #1 - DUE TO R D1A/A UNDE D,
cF� STREAM 5
�pcc 62.51 LF (41.88 SF) OF TEMPORARY IMPAC
GRADING LIMITS Pc,,<< 0 50 10�150
AMERICAN
Engineering
8008 Corporate Center Drive, Suite 110 1 Charlotte, NC 28226 1 704.375.2438
Charlotte, NC
November 2, 2022
Page 2 of 4
Note: Conceptual Plans Only, lot yield and layout subject to change based on final design and approvals.