Loading...
HomeMy WebLinkAboutColeman Dr Proposed Impacts Exhibit - Mod #1.pdf�� cF\ \ x a 333d_ _3»d_ \ AM I C #1 / RADING LIMITS �ccF 5N1EL 225.E 05 AC F I ACT E � 3 PCCE — PC A ��Ca9w—� d REAM RAIDING LIMITS TREAM IMPACT #2 - DUE TO RIPRAP /5 i STREAM 4 s PCCE Et 44.66 LF CCEs� sew / P - �88.�'50 SF (0 hC M F PKCT oE— €€-- / \ \PCC — SWEL I �� SDE—E — PCCE — — PCCE / MCP. SDE— -DE cc / STREAM 5 WETLAND IMPACT # \ WETLAN 5 N E ISTING POND 27.94 SF (0.019 AC) OF IM CT 1 XISTI RM PE O R MAIN m F_ / OS XISTING STORM PIPE SEGMENTS TO BE REMOVED \ ao 1 u" EXISTING POND TEMPORARY STREAM IMPACT #1 - DUE TO R D1A/A UNDE D, cF� STREAM 5 �pcc 62.51 LF (41.88 SF) OF TEMPORARY IMPAC GRADING LIMITS Pc,,<< 0 50 10�150 AMERICAN Engineering 8008 Corporate Center Drive, Suite 110 1 Charlotte, NC 28226 1 704.375.2438 Charlotte, NC November 2, 2022 Page 2 of 4 Note: Conceptual Plans Only, lot yield and layout subject to change based on final design and approvals.