Loading...
HomeMy WebLinkAboutWQ0002428_WQ0002428 Inspection Letter WWT and Irrigation 0713.2023_20230713 July 13, 2023 Tayna Rogers-Vickers Mountaire Farms Inc PO Box 733 Siler City, NC 27344 Subject: Compliance Evaluation Inspection Mount Vernon WWTF and Irrigation System Nondischarge Permit WQ0002428 Chatham County Dear Ms. Rogers-Vickers: On June 7, 2023, Dorothy Robson and Michael Hall from the Raleigh Regional Office visited your facility to evaluate compliance with the Nondischarge Permit WQ0002428. Division records indicate the facility operates a wastewater collection, treatment, and irrigation facility. During the inspection, the following was observed: Schedule (Section I of permit): 1. The facility is currently under construction for the lagoon liners and wet wells. As a reminder, the permittee shall: a. upon completion of construction and prior to operation, please submit a final engineering certification that the permitted facility has been constructed in accordance with G.S. 143-201.1, Administrative Code Title 15A Subchapter 02T, this permit, and the Division-approved plans and specifications. b. Notify the Raleigh Regional Office at least two business days in advance of initial operation of the new construction so that the Division can conduct a start-up inspection. Performance (Section II): 2. The facility maintains and operates the wastewater and irrigation facilities as described in the permit. 3. Effluent quality has not exceeded parameter limits as specified in Attachment A. Operation and Maintenance (O&M) (Section III): 4. The permittee is responsible for the O&M of the WWTF and irrigation system with no discharge to surface waters. An O&M Plan, Spill control prevention plan (SPCP), and safety measures are readily available and observed. 5. The wastewater lagoon and chlorine tablet chambers were observed to be well maintained. DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Page | 2 6. The lagoons were under construction, but the areas around the lagoons were well maintained. 7. Vegetative cover on the irrigation areas were well maintained and no ponding or runoff was observed. 8. Public access is restricted at the wastewater treatment and irrigation facilities. 9. Calibration records were available and compliant with the permit. Monitoring and Reporting (Section IV): 10. Effluent flow and irrigation rates are in compliance in accordance with the permit. 11. Record tracking documents were well maintained and readily available for review. 12. Freeboard is recorded as described in the permit. At the time of the site visit, the lagoons were under construction and the lagoon had minimal wastewater in the lagoons. 13. A review of the NDMR and NDARs indicated compliance with the permit. 14. Groundwawter monitoring Reports (GW-59) were up to date and in compliance. Inspections (Section V): 15. The facility performs maintenance and inspects the facility daily and maintains written and digital logs. General Conditions (Section VI): 16. The permittee is in compliance with the permit’s general conditions. This report is a notification of the results of the compliance inspection. This report is a notification of the results of the compliance inspection. No issues were observed at the time of the inspection. If you have questions or comments about this inspection, then please contact us via email at dorothy.robson@ncdenr.gov or 919-791-4200. Sincerely, Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Attachment(s): NCDEQ Compliance Inspection Form Cc: Non-Discharge Laserfiche DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Compliance Inspection Report Permit:WQ0002428 Effective:05/25/22 Expiration:12/31/26 Owner :Mountaire Farms Inc SOC: Contact Person: Region: County: Directions to Facility: Chatham Raleigh Douglas Goodwin Effective:Expiration:Facility:Mount Vernon Hatchery WWTF 175 Foust Rd Siler City NC 27344 Title:Phone:919-663-2050 Secondary ORC(s): Phone:Certification:Primary ORC: SI,System Classifications: On-Site Representative(s): Related Permits: Secondary Inspector(s): Primary Inspector: Inspection Date:Exit Time:Entry Time: Phone: 06/07/2023 09:30AM 11:30AM Dorothy M Robson 919-791-4241 Facility Status: Permit Inspection Type: Reason for Inspection:Inspection Type: Not CompliantCompliant Routine Wastewater Irrigation Compliance Evaluation Question Areas: Miscellaneous Questions Record Keeping Treatment Lagoons End Use-Irrigation Treatment Disinfection Wells (See attachment summary) Page 1 of 7 Michael Hall Douglas Goodwin, Adam Fuquay, and Dylan Gaines DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0002428 06/07/2023 Compliance Evaluation Mountaire Farms Inc Routine Inspection Summary: On June 7, 2023, Dorothy Robson from the Raleigh Regional Office visited your facility to evaluate compliance with the Nondischarge Permit WQ0002428. Division records indicate the facility operates a wastewater collection, treatment, and irrigation facility. During the inspection, the following was observed: Schedule (Section I of permit): 1. The facility is currently under construction for the lagoon liners and wet wells. As a reminder, the permittee shall: a. upon completion of construction and prior to operation, please submit a final engineering certification that the permitted facility has been constructed in accordance with G.S. 143-201.1, Administrative Code Title 15A Subchapter 02T, this permit, and the Division-approved plans and specifications. b. Notify the Raleigh Regional Office at least two business days in advance of initial operation of the new construction so that the Division can conduct a start-up inspection. Performance (Section II): 2. The facility maintains and operates the wastewater and irrigation facilities as described in the permit. 3. Effluent quality has not exceeded parameter limits as specified in Attachment A. Operation and Maintenance (O&M) (Section III): 4. The permittee is responsible for the O&M of the WWTF and irrigation system with no discharge to surface waters. An O&M Plan, Spill control prevention plan (SPCP), and safety measures are readily available and observed. 5. The wastewater lagoon and chlorine tablet chambers were observed to be well maintained. 6. The lagoons were under construction, but the areas around the lagoons were well maintained. 7. Vegetative cover on the irrigation areas were well maintained and no ponding or runoff was observed. 8. Public access is restricted at the wastewater treatment and irrigation facilities. 9. Calibration records were available and compliant with the permit. Monitoring and Reporting (Section IV): 10. Effluent flow and irrigation rates are in compliance in accordance with the permit. 11. Record tracking documents were well maintained and readily available for review. 12. Freeboard is recorded as described in the permit. At the time of the site visit, the lagoons were under construction and the lagoon had minimal wastewater in the lagoons. 13. A review of the NDMR and NDARs indicated compliance with the permit. 14. Groundwawter monitoring Reports (GW-59) were up to date and in compliance. Inspections (Section V): 15. The facility performs maintenance and inspects the facility daily and maintains written and digital logs. General (Conditions Section VI): 16. The permittee is in compliance with the permit’s general conditions. This report is a notification of the results of the compliance inspection. This report is a notification of the results of the compliance inspection. No issues were observed at the time of the inspection. Page 2 of 7 DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0002428 06/07/2023 Compliance Evaluation Mountaire Farms Inc Routine Type Yes No NA NE Single Family Spray, LR Activated Sludge Spray, LR Reuse (Quality) Activated Sludge Spray, HR Activated Sludge Drip, LR Infiltration System Recycle/Reuse Single Family Drip Lagoon Spray, LR Treatment Disinfection Yes No NA NE Is the system working? Do the fecal coliform results indicate proper disinfection? Is there adequate detention time (>=30 minutes)? Is the system properly maintained? If gas, does the cylinder storage appear safe? Is the fan in the chlorine feed room and storage area operable? Is the chlorinator accessible? If tablets, are tablets present? Are the tablets the proper size and type? Is contact chamber free of sludge, solids, and growth? If UV, are extra UV bulbs available? If UV, is the UV intensity adequate? # Is it a dual feed system? Does the Stationary Source have more than 2500 lbs of Chlorine (CAS No. 7782-50-5)? If yes, then is there a Risk Management Plan on site? If yes, then what is the EPA twelve digit ID Number? (1000-____-____) If yes, then when was the RMP last updated? NoneComment: Record Keeping Yes No NA NE Is a copy of current permit available? Are monitoring reports present: NDMR? NDAR? Are flow rates less than of permitted flow? Are flow rates less than of permitted flow? Page 3 of 7 DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0002428 06/07/2023 Compliance Evaluation Mountaire Farms Inc Routine Are application rates adhered to? Is GW monitoring being conducted, if required (GW-59s submitted)? Are all samples analyzed for all required parameters? Are there any 2L GW quality violations? Is GW-59A certification form completed for facility? Is effluent sampled for same parameters as GW? Do effluent concentrations exceed GW standards? Are annual soil reports available? # Are PAN records required? # Did last soil report indicate a need for lime? If so, has it been applied? Are operational logs present? Are lab sheets available for review? Do lab sheets support data reported on NDMR? Do lab sheets support data reported on GW-59s? Are Operational and Maintenance records present? Were Operational and Maintenance records complete? Has permittee been free of public complaints in last 12 months? Is a copy of the SOC readily available? No treatment units bypassed since last inspection? A pH/chlorine log book should be maintained to verify that calibration is completed as sampling occurs. Comment: End Use-Irrigation Yes No NA NE Are buffers adequate? Is the cover crop type specified in permit? Is the crop cover acceptable? Is the site condition adequate? Is the site free of runoff / ponding? Is the acreage specified in the permit being utilized? Is the application equipment present? Is the application equipment operational? Is the disposal field free of limiting slopes? Is access restricted and/or signs posted during active site use? Are any supply wells within the CB? Are any supply wells within 250' of the CB? How close is the closest water supply well? Page 4 of 7 DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0002428 06/07/2023 Compliance Evaluation Mountaire Farms Inc Routine Is municipal water available in the area? # Info only: Does the permit call for monitoring wells? Are GW monitoring wells located properly w/ respect to RB and CB? Are GW monitoring wells properly constructed, including screened interval? Are monitoring wells damaged? Good conditionComment: STORAGE LAGOON - Treatment Lagoons Yes No NA NE Lagoon Type Aerated Primary/Secondary Secondary Influent structure Banks/berms (seepage and erosion) Vegetation (excessive vegetation on banks/berms) Liner Liner Type Full, synthetic Baffles/curtains Freeboard Marker Required freeboard 2 Feet Actual freeboard 10 Feet Are increments clearly marked on gauge at adequate intervals? Has the water level gauge been surveyed w/ respect to lowest point on dike? wall? No Evidence of overflow Acceptable color Floating mats Excessive solids buildup Aerators/mixers Effluent structure Lagoon cover AERATION LAGOON # 2 - Treatment Lagoons Yes No NA NE Page 5 of 7 DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0002428 06/07/2023 Compliance Evaluation Mountaire Farms Inc Routine Lagoon Type Aerated Primary/Secondary Primary Influent structure Banks/berms (seepage and erosion) Vegetation (excessive vegetation on banks/berms) Liner Liner Type Full, synthetic Baffles/curtains Freeboard Marker Required freeboard Actual freeboard Are increments clearly marked on gauge at adequate intervals? Has the water level gauge been surveyed w/ respect to lowest point on dike? wall? No Evidence of overflow Acceptable color Floating mats Excessive solids buildup Aerators/mixers Effluent structure Lagoon cover AERATION LAGOON #1 - Treatment Lagoons Yes No NA NE Lagoon Type Aerated Primary/Secondary Primary Influent structure Banks/berms (seepage and erosion) Vegetation (excessive vegetation on banks/berms) Liner Liner Type Full, synthetic Baffles/curtains Page 6 of 7 DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0002428 06/07/2023 Compliance Evaluation Mountaire Farms Inc Routine Freeboard Marker Required freeboard Actual freeboard Are increments clearly marked on gauge at adequate intervals? Has the water level gauge been surveyed w/ respect to lowest point on dike? wall? No Evidence of overflow Acceptable color Floating mats Excessive solids buildup Aerators/mixers Effluent structure Lagoon cover Page 7 of 7 DocuSign Envelope ID: 70103A69-73EC-4A67-A621-6EDE403E7072