HomeMy WebLinkAboutNCC202552_NOT Closeout Documents_20230731 }4 � Greenville
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
July 17, 2023
Letter of Final Inspection
Mark Barton
SRH Construction
2900 Groveland Drive
Greenville,NC 27858
Re: Project Name: Williamsbrook East 1513 A/B, 1571 A/B Pine Brook Court
Project Number: ESCP-2020-0038
County: Pitt
Disturbed Acreage: 0.28
Responsible Party: SRH Construction.
Dear Mr. Barton,
At your request, this office has completed its final site inspection of the referenced project. We
find the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCG01 permit.
Please do not hesitate to call if you have any questions.
R specttully,
A.X51---C- 0y7
Victor Long
Engineer Assistant Ill
Engineering Department
City of Greenville
vlong@greenvillenc.gov
www.greenvillenc.gov
252-329-4888
52-329-4467 1500 Beatty Street, Greenville, NC 27835-7207 greenvillenc.go