Loading...
HomeMy WebLinkAboutNCC202552_NOT Closeout Documents_20230731 }4 � Greenville ENGINEERING Engineering Department-Sedimentation/Erosion Control Program July 17, 2023 Letter of Final Inspection Mark Barton SRH Construction 2900 Groveland Drive Greenville,NC 27858 Re: Project Name: Williamsbrook East 1513 A/B, 1571 A/B Pine Brook Court Project Number: ESCP-2020-0038 County: Pitt Disturbed Acreage: 0.28 Responsible Party: SRH Construction. Dear Mr. Barton, At your request, this office has completed its final site inspection of the referenced project. We find the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this project and you will need to terminate your NCG01 permit. Please do not hesitate to call if you have any questions. R specttully, A.X51---C- 0y7 Victor Long Engineer Assistant Ill Engineering Department City of Greenville vlong@greenvillenc.gov www.greenvillenc.gov 252-329-4888 52-329-4467 1500 Beatty Street, Greenville, NC 27835-7207 greenvillenc.go