Loading...
HomeMy WebLinkAboutNCS000476_Approved SWMP_20230218 Draft Stormwater Management Plan Town of Canton NCS000476 February 20, 2023 0 Table of Contents PART 1: INTRODUCTION........................................................................................................................I PART2: CERTIFICATION........................................................................................................................2 PART 3: MS4 INFORMATION..................................................................................................................3 3.1 Permitted MS4 Area.....................................................................................................................3 3.2 Existing MS4 Mapping.................................................................................................................3 3.3 Receiving Waters..........................................................................................................................4 3.4 MS4 Interconnection.....................................................................................................................5 3.5 Total Maximum Daily Loads(TMDLs) .......................................................................................5 3.6 Endangered and Threatened Species and Critical Habitat............................................................5 3.7 Industrial Facility Discharges.......................................................................................................6 3.8 Non-Stormwater Discharges.........................................................................................................6 3.9 Target Pollutants and Sources.......................................................................................................7 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION.....................................9 4.1 Organizational Structure...............................................................................................................9 4.2 Program Funding and Budget.....................................................................................................11 4.3 Shared Responsibility.................................................................................................................11 4.4 Co-Permittees..............................................................................................................................12 4.5 Measurable Goals for Program Administration..........................................................................12 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM.........................................................14 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM...........................................20 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM..............................23 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM...................................................28 PART 9: POST-CONSTRUCTION SITE RUNOFF CONTROL PROGRAM........................................31 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS......................37 List of Tables Table 1: Summary of MS4 Mapping Table 2: Summary of MS4 Receiving Waters Table 3: Summary of Approved TMDLs Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality Table 5: NPDES Stormwater Permitted Industrial Facilities Table 6: Non-Stormwater Discharges Table 7: Summary of Target Pollutants and Sources Table 8: Summary of Responsible Parties Table 9: Shared Responsibilities Table 10: Co-Permittee Contact Information Table 11: Program Administration BMPs Table 12: Summary of Target Pollutants&Audiences Table 13: Public Education and Outreach BMPs Table 14: Public Involvement and Participation BMPs Table 15: Illicit Discharge Detection and Elimination BMPs Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Table 17: Construction Site Runoff Control BMPs Table 18: Qualifying Alternative Program(s) for Post-Construction Site Runoff Control Program Table 19: Summary of Existing Post-Construction Program Elements Table 20: Post Construction Site Runoff Control BMPs Table 21: Pollution Prevention and Good Housekeeping BMPs PART 1: INTRODUCTION The purpose of this Stormwater Management Plan(SWMP)is to establish and define the means by which the Town of Canton will comply with its National Pollutant Discharge Elimination System(NPDES) Municipal Separate Storm Sewer System(MS4)Permit and the applicable provisions of the Clean Water Act to meet the federal standard of reducing pollutants in stormwater runoff to the maximum extent practicable. This SWMP identifies the specific elements and minimum measures that the Town of Canton will develop, implement, enforce, evaluate and report to the North Carolina Department of Environmental Quality(NCDEQ)Division of Energy,Minerals and Land Resources(DEMLR)in order to comply with the MS4 Permit number NCS000476, as issued by NCDEQ. This permit covers activities associated with the discharge of stormwater from the MS4 as owned and operated by the Town of Canton and located within the corporate limits of the Town of Canton. In preparing this SWMP,the Town of Canton has evaluated its MS4 and the permit requirements to develop a comprehensive 5-year SWMP that will meet the community's needs, address local water quality issues and provide the minimum measures necessary to comply with the permit. The SWMP will be evaluated and updated annually to ensure that the elements and minimum measures it contains continue to adequately provide for permit compliance and the community's needs. Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along with any approved modifications of the SWMP, are incorporated by reference into the permit and become enforceable parts of the permit. Any major changes to the approved SWMP will require resubmittal, review and approval by NCDEQ, and may require a new public comment period depending on the nature of the changes. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 1 PART 2: CERTIFICATION By my signature below I hereby certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. I am also aware that the contents of this document shall become an enforceable part of the NPDES MS4 Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit compliance and enforcement authority. ® 1 am a ranking elected official. ❑ I am a principal executive officer for the permitted MS4. ❑ I am a duly authorized representative for the permitted MS4 and have attached the authorization made in writing by a principal executive officer or ranking elected official which specifies me as(check one): ❑ A specific individual having overall responsibility for stormwater matters. ❑ A specific position having overall responsibility for stormwater matters. Friar ! snwfhers Name; Tirle. ,Mfgvor Signed this 17th day of Nouornber,24. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 2 PART 3: MS4 INFORMATION 3.1 Permitted MS4 Area This SWMP applies throughout the corporate limits of the Town of Canton,including all regulated activities associated with the discharge of stormwater from the MS4. The map below shows the corporate limits of Town of Canton as of the date of this document. town a Ga�IGn cu.aumMe.um%o i \,. 1�r y7� J +. 1 \ .,. rV ht'rx r� �iI o�N.cee✓.n h.�.mm,rc,zozz 3.2 Existing MS4 Mapping The current MS4 mapping includes current mapping and inventory developed by town staff and consultants who have physically located most of the Town's system components. This mapping includes the location of all publicly owned stormwater piping. The map of the existing system will continue to be verified and finalized. The mapping will be updated as new facilities are installed using required submittals to the Planning Board and through regular inspections and maintenance. Table 1: Summary of Current MS4 Mapping Percent of MS4 Area Mapped 95 % No. of Major Outfalls* Mapped Unknown** total DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 3 *An outfall is a point where the MS4 discharges from a pipe or other conveyance(e.g. a ditch) directly into surface waters. Major outfalls are required to be mapped to meet permit requirements. A major outfall is a 36-inch diameter pipe or discharge from a drainage area> 50-acres; and for industrial zoned areas a 12-inch diameter pipe or a drainage area> 2-acres. **Outfalls have been mapped but the classification of specific outfalls as major outfalls has not occurred, therefore,the number of major outfalls is unknown at this time(See BMP No. 14). 3.3 Receiving Waters The Town of Canton MS4 is located within the French Broad River Basin and discharges directly into receiving waters as listed in Table 2 below. The abbreviation"UT" in the following table stands for Unnamed Tributary. Applicable water quality standards listed below are compiled from the following NCDEQ sources: o Waterbody Classification Map o Impaired Waters and TMDL Map o Most recent NCDEQ Final 303 d List Table 2: Summary of MS4 Receiving Waters Receiving Water Name Stream Index/ Water Quality 303(d)Listed Parameter(s) AU Number Classification of Interest Pigeon River 5-7 C Murray Branch 5-9 C UT of Pigeon River No DWQ index# C UT of Pigeon River No DWQ index# C Mingus Branch No DWQ index# C UT of Mingus Branch No DWQ index# C UT of Pigeon River No DWQ index# C UT of Pigeon River No DWQ index# C Hominy Creek 6-76 C UT of Hominy Creek No DWQ index# C UT of Hominy Creek No DWQ index# C Dutch Cove 6-76-1 C UT of Hominy Creek No DWQ index# C UT of Hominy Creek No DWQ index# C UT of Hominy Creek No DWQ index# C UT of Hominy Creek No DWQ index# C UT of Pigeon River No DWQ index# C UT of Beaverdam Creek No DWQ index# C Beaverdamn Creek 5-8 C UT of Beaverdam Creek No DWQ index# C UT of Pigeon River No DWQ index# C DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 4 3.4 MS4 Interconnection The Town of Canton MS4 is not interconnected with another regulated MS4 and directly discharges to the receiving waters as listed in Table 2 above. 3.5 Total Maximum Daily Loads (TMDLs) The TMDL(s)listed in Table 3 below have been approved within the MS4 area, as determined by the map and list provided on the NCDEQ Modeling&Assessment Unit web page. The table also indicates whether the approved TMDL has a specific stormwater Waste Load Allocation(WLA) for any watershed directly receiving discharges from the permitted MS4, and whether a Water Quality Recovery Program has been implemented to address the WLA. Table 3: Summary of Approved TMDLs TMDL Pollutant(s) Stormwater Waste Load Water Quality Water Body Allocation Recovery Program Name of Concern (YIN) (YIN) Statewide Mercury N N The Statewide TMDL for Mercury does not require any actions by the NPDES stormwater permittees because most mercury in stormwater comes from atmospheric deposition. 3.6 Endangered and Threatened Species and Critical Habitat Significant populations of threatened or endangered species and/or critical habitat are identified within the regulated MS4 urbanized area. Based upon a review of the Endangered and Threatened Species and Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in North Carolina map as provided by the U.S. Fish and Wildlife Service,the species listed in Table 4 have the potential to occur within the regulated MS4 urbanized area. Of those species listed, Table 4 summarizes the species that may be significantly impacted by the quality of surface waters within their habitat. Table 4: Potential Federally Listed Species/Habitat Impacted by Surface Water Quality Scientific Name Common name Species Group Federal Listing Status Microhexura montivaga Spruce-fir moss spider M. montivaga E (arachnid) Alasmidonta raveneliana Appalachian elktoe(river mussel) A. raveneliana E DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 5 3.7 Industrial Facility Discharges The Town of Canton MS4 jurisdictional area includes the following industrial facilities which hold NPDES Industrial Stormwater Permits, as determined from the NCDEQ Maps&Permit Data web page. Table 5: NPDES Stormwater Permitted Industrial Facilities Permit Number Facility Name NCS000105 Blue Ridge Paper Products INC (Evergreen Canton Mill Facility) NCGO80958 Blue Ride Southern Railroad 3.8 Non-Stormwater Discharges The water quality impacts of non-stormwater discharges have been evaluated by the Town of Canton as summarized in Table 6 below. The unpermitted non-stormwater flows listed as incidental do not significantly impact water quality. The Town of Canton has evaluated residential and charity car washing and street washing for possible significant water quality impacts. Street washing discharges are addressed under the Pavement Management Program in Part 10 of this SWMP. Street cleaning is performed with a dry street sweeping process so street washing discharges are not relevant to the MS4. The Division has not required that other non-stormwater flows be specifically controlled by the Town of Canton. Wash water associated with car washing that does not contain detergents or does not discharge directly into the MS4 is considered incidental. However,these types of non-stormwater discharges that do contain detergents have been evaluated by the Town of Canton to determine whether they may significantly impact water quality. They were determined to be a possible cause of water quality impacts and will be addressed through public education efforts(See BMP No. 5 &7.) Table 6: Non-Stormwater Discharges Non-Stormwater Discharge Water Quality Impacts Water line and fire hydrant flushing Incidental Landscape irrigation Incidental Diverted stream flows Incidental Rising groundwater Incidental Uncontaminated groundwater infiltration Incidental Uncontaminated pumped groundwater Incidental Uncontaminated potable water sources Incidental Foundation drains Incidental Air conditioning condensate Incidental Irrigation waters Incidental Springs Incidental Water from crawls ace pumps Incidental DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 6 Footing drains Incidental Lawn watering Incidental Residential and charity car washing Possible Flows from riparian habitats and wetlands Incidental Dechlorinated swimming pool discharges Incidental Street wash water N/A Flows from firefighting activities Incidental 3.9 Target Pollutants and Sources In addition to those target pollutants identified above,the Town of Canton is not aware of other significant water quality issues within the permitted MS4 area. Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP,the likely activities/sources/targeted audiences attributed to each pollutant and identifies the associated SWMP program(s)that address each. In addition,the Town of Canton has evaluated schools, homeowners and businesses as target audiences that are likely to have significant stormwater impacts. Schools represent an important target audience as teaching students can provide opportunities for education and community involvement in the process. By beginning this education process early,positive change can occur. Homeowners and business are obvious target audiences because they represent likely sources for non-point pollution. This typically occurs because of a lack of education and recommended management practices. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 7 Table 7: Summary of Target Pollutants and Sources Target Likely Source(s)/Target SWMP Program Addressing Target Pollutant(s) Audiences Pollutant s /Audience s Litter Residents,Businesses, Schools Public Education& Outreach Yard Waste Residential, commercial Public Education& Outreach, (leaves and grass Pollution Prevention&Good Housekeeping clippings) Sediment Construction Construction Site Runoff Control Nutrients Sewer overflows,failing septic Public Education& Outreach, Illicit systems,urbanization, schools Discharge Detection&Elimination, Construction Site Runoff Control,Post-Construction Site Runoff Control, Pollution Prevention& Good Housekeeping Fecal coliform Sewer overflows,failing septic Public Education&Outreach, Illicit Discharge systems, Detection& wildlife,illicit discharges Elimination Mercury/stat Atmospheric deposition Public Education& Outreach(fish ewide consumption advisory) TMDL Illicit discharges Residential,commercial, Public Education& Outreach, Illicit industrial, municipal staff Discharge Detection& Elimination, Illegal dumping Residential,commercial, Public Education& Outreach, industrial,municipal staff Pollution Prevention&Good Housekeeping Improper disposal Residential,commercial, Public Education& Outreach, Public of waste industrial,municipal staff Involvement&Participation, Pollution Prevention& Good Housekeeping General non- Residential,commercial, Public Education& Outreach point source schools, municipal staff pollution DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 8 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION 4.1 Organizational Structure The Town of Canton stormwater program is implemented in partnership by primarily the Administration/Planning and Public Works departments. The Administration/Planning department is responsible for the public outreach and involvement components, as well as engineering plan reviews; while the Public Works department is responsible for good housekeeping and municipal pollution prevention activities, storm sewer system maintenance,and IDDE. The Town Manager is designated as the Stormwater Program Administrator. Canton Town Board of Aide—n Mayor Patrick U.S.athers Town Manager Stomtwater Program Administrator Nick Erne— Fleet Department Assistant Town Managerf-own Clerk Pu hlic Works Fire Department Police Department Special Events Coordinator Varant,Water and Sewer Keith Pressley Kevin Wheeler,Chief Scott Studer,Chief Department Head Superintendent Lisa Stinnett Josh Piurowski,Street Department Superintendent Michael Gantt,Water&Sewer Fire Fighters Police Officers Assistant to Manager Superintendent 11 Fu II-Time 18 Full-Time Brandy proctor Flu hl K Works Crew 15 Full-lime Table 8: Summary of Responsible Parties SWMP Component Responsible Position Staff Name Department Stormwater Program Town Manager Nick Scheuer Administration Administration SWMP Management Town Manager Nick Scheuer Administration Public Education& Special Events Lisa Stinnett Administration Outreach Coordinator/Assistant Town Manager Public Involvement& Special Events Lisa Stinnett Administration Participation Coordinator/Assistant Town Manager DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 9 Illicit Discharge Water& Sewer Dept Michael Gant Water& Sewer Dept Detection& Town Manager Nick Scheuer Administration Elimination Assistant Town Lisa Stinnett Administration Manager Construction Site Water& Sewer Dept Michael Gant Water& Sewer Dept Runoff Control Town Manager Nick Scheuer Administration Assistant Town Lisa Stinnett Administration Manager Post-Construction Water& Sewer Dept Michael Gant Water& Sewer Dept. Stormwater Streets Dept Head Administration Management Town Manager Josh Piurowski Administration Assistant Town Nick Scheuer Manager Lisa Stinnett Pollution Public Works Nick Scheuer Administration Prevention/Good Housekeeping for Municipal Operations Municipal Facilities Public Works Nick Scheuer Administration Operation& Maintenance Program Spill Response Program Fire Chief Kevin Wheeler Fire Public Works Nick Scheuer Administration MS4 Operation& Town Manager Nick Scheuer Administration Maintenance Program Asst Town Manager Lisa Stinnett Administration Municipal SCM Town Manager Nick Scheuer Administration Operation& Asst Town Manager Lisa Stinnett Administration Maintenance Program Pesticide,Herbicide& Street Superintendent Josh Piurowski Streets Fertilizer Management Program Vehicle&Equipment Fleet Superintendent Keith Pressley Fleet Cleaning Program Pavement Management Street Superintendent Josh Piurowski Street Program Total Maximum Daily Public Works Nick Schuerer Administration Load(TMDL) Josh Piurowski Streets Requirements DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 10 4.2 Program Funding and Budget In accordance with the issued permit,the Town of Canton shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and comply with the requirements of the NPDES MS4 Permit. The budget includes the permit administering and compliance fee,which is billed by the Division annually. The stormwater program currently receives funding of approximately$160,000 per year;this is funded primarily through general funds. This includes a separation of duties between both the Street& Sanitation Department as well as,Water& Sewer however,the Water and Sewer Superintendent position is funded through the Water and Sewer Enterprise fund. This$160,000 includes time spend and hours spent specifically to Stormwater needs and Street Sweeping based on BMP. The program is currently under- funded to conduct all the proactive elements of the permit as it relates to stormwater specific duties and needs. Further fiscal analysis and investigation of funding options(such as additional general fund allocation or a stormwater fee)will be conducted to fully fund the program by Permit year three. 4.3 Shared Responsibility The Town of Canton will share the responsibility to implement the following minimum control measures, which are at least as stringent as the corresponding NPDES MS4 Permit requirement. The Town of Canton remains responsible for compliance if the other entity fails to perform the permit obligation and may be subject to enforcement action if neither the Town of Canton nor the other entity fully performs the permit obligation. Table 9 below summarizes who will be implementing the component,what the component program is called,the specific SWMP BMP or permit requirement that is being met by the shared responsibility, and whether or not a legal agreement to share responsibility is in place. SWMP BMPor Legal Agreement Permit Requirement Implementing Entity&Program (Y/N) Name 3.2 Outreach to Targeted Southwestern Commission/Land of Sky N Audiences Regional Council 3.3.2 Volunteer Opportunities N 3.5 Construction Site Runoff Haywood County Delegated SPCA Program Y Control Program Table 9: Shared Responsibilities SWMP BMP or Legal Permit Requirement Implementing Entity&Program Name Agreement Y/N N/A DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 11 4.4 Co-Permittees The are no other entities applying for co-permittee status under the NPDES MS4 permit number NCS000476 for the Town of Canton. Table 10 summarizes contact information for each co-permittee. Table 10: Co-Permittee Contact Information Co-Permittee MS4 Contact Person Phone&E-Mail Interlocal Name Agreement Y/N N/A 4.5 Measurable Goals for Program Administration The Town of Canton will manage and report the following Best Management Practices(BMPs) for the administration of the Stormwater Management Program. Table 11: Program Administration BMPs Permit 2.1.2 Program Implementation Ref. Measures to evaluate the performance and effectiveness of the SWMP program components at least annually. Results shall be used by the permittee to modify the program components as necessary to accomplish the intent of the Stormwater Program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #1. Annual Self-Assessment Evaluate the performance and 1.Prepare,conduct and 1.Annually 1.Yes/No effectiveness of the program document an annual Permit Years 1—5 components at least annually.Results evaluation of the program shall be used to modify the program components. components as necessary to accomplish the intent of the Stormwater Program. Permit 1.6: Permit Renewal Application Ref. Measures to submit a permit renewal application no later than 180 days prior to the expiration date of the NPDES MS4 permit. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 12 Table 11: Program Administration BMPs BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #2. Permit Renewal Application Submit a permit renewal 1.Draft SWMP 1.Permit Year 5 1.Yes/No application and Draft SWMP no applicable to the later than 180 prior to permit proceeding 5 years expiration. following permit re- issuance. 2. Certify the stormwater 2.Permit Year 5 2.Date of permit renewal permit renewal application submittal application(Permit renewal application form and Draft SWMP for the next 5-year permit cycle) and submit to NCDEQ at least 180 days prior to permit expiration. Permit 2.1.1: Adequate Funding and Staffing Ref. The permitee shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and meet all requirements of this permit. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #2A Perform a fiscal analysis and explore 1.Complete a fiscal gap 1.Permit year 1 1.Adequate/Inadequate options to obtain adequate program analysis to confirm the funding to fully fund the stormwater program is adequately program and meet all requirements of funded. the permit. Select and implement a funding strategy for the Phase H Stormwater Program Permit 2.2.2: Written Procedures Ref. The Permittee shall maintain, and make available to the Division upon request,written procedures for implementing the six minimum control measures.Written procedures shall identify specific action steps, schedules,resources,and responsibilities for implementing the MCMs. Written procedures can be free standing or,where appropriate,integrated into the Stormwater Manage ent Plan. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #213 Develop written procedures for 1. Create all required 1.Permit year 1 1.Yes/No implementing the six minimum written procedures. control measures. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 13 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM The Town of Canton will implement a Public Education and Outreach Program to distribute educational materials to the community or conduct equivalent outreach activities about the impacts of storm water discharges on water bodies and steps the public can take to reduce pollutants in storm water runoff. The target audiences and identified pollutants listed in Part 3.9 of this SWMP,which will be addressed by the Public Education and Outreach Program, are summarized in Table 12 below. In addition,the Town of Canton is required to inform businesses and the general public of the hazards associated with illicit discharges,illegal dumping and improper disposal of waste. Table 12: Summary of Target Pollutants&Audiences Target Pollutants/Sources Target Audience(s) Litter Residential,commercial, schools Yard Waste Residential,commercial,municipal staff Sediment Construction Nutrients Residential,commercial, schools Fecal coliform Residential,commercial, schools Mercury/statewide TMDL Residential, commercial Illicit discharges Residential,commercial,industrial,municipal staff Illegal dumping Residential,commercial,industrial,municipal staff Improper disposal of waste Residential,commercial,industrial,municipal staff Illicit Discharges General Public,Businesses,Municipal Employees Illegal Dumping General Public,Businesses,Municipal Employees Improper Disposal of Waste General Public,Businesses,Municipal Employees General non-point source Residential,commercial, schools,municipal staff pollution DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 14 The Town of Canton will manage,implement and report the following public education and outreach BMPs. The Canton Labor Day Festival is a major 2-day festival, and this will serve as a medium for stormwater outreach and education. The town will also develop a stormwater web page and use social media to reach younger generations.Additionally,the Town of Canton plans to partner with the Southwestern Planning Commission to implement education and outreach activities more efficiently. Town of Canton will manage,implement, and report the following public education and outreach BMPs. Table 13: Public Education and Outreach BMPs Permit 3.2.2 and 3.2.4: Outreach to Targeted Audiences Ref. Measures to identify the specific elements and implementation of a Public Education and Outreach Program to share educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The permittee shall provide educational information to identified target audiences on pollutants/sources identified in table 12 above, and shall document the extent of exposure of each media, event or activity,including those elements implemented locally or throu h a cooperative agree ent. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #4. Partnership with Southwestern Commission The Town will engage with the 1.Review 1.Permit Year 1 1.Yes/No/Partial Southwestern Commission to develop partnership/agreement Education and Outreach Initiatives with Southwestern that will be administered by Commission and modify Southwestern Commission. as needed. Initiatives will focus on residential, 2.Review partnership 2.Permit Year 1 2.Yes/No/Partial commercial,and school audiences plan detailing specific with the MS4 area. commitment of the Southwestern Commission partnership to ensure it meets requirements. 3. Monitor Southwestern 3.Annually,following 3.Yes/No/Partial Commission activities to establishment of ensure partnership partnership commitments are met. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 15 Table 13: Public Education and Outreach BMPs #5. Town Sponsored Event of Festivals The Town will distribute information 1.Participate in one 1.Annually 1.Yes/No,report on stormwater during at least one event per year. participants and contact town sponsored event or festival a hours provided. year such as the Labor Day Festival 2. Train municipal staff 2.Permit year 1 and as 2.Yes/No or one of the other yearly events. needed for future years. Develop or identify one informational handout for distribution at the event that covers litter,nutrients,and nonpoint source pollution(Including car washing)Train municipal staff to man a stormwater booth during the event and distribute the abovementioned flyers as well as information about leaky septic systems,illicit discharges/improper disposal of waste #6. Social Media Campaign The Town's existing Facebook and 1. Create at a minimum 1 1.Annually 1.Yes/No,report number Instagram account will be used to Social Media Post per of post. reach the residential target audience year. and share information related to stormwater issues,with a minimum of one post per year. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 16 Table 13: Public Education and Outreach BMPs Permit 2.1.7,3.2.3 and 3.6.5(c): Web Site Ref. Measures to provide a web site designed to convey the program's message(s) and provide online materials including ordinances,or other regulatory mechanisms,or a list identifying the ordinances or other regulatory mechanisms,providing the legal authority necessary to implement and enforce the requirements of the permit and SWMP. The web page shall also provide developers with all relevant post-construction requirements, design standards,checklists and/or other materials. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #7. Stormwater Page on Town of Canton Website The web page will provide 1.Establish stormwater 1.Permit Year 1. 1.Yes/No information on the Town's page stormwater program,including the 2.Maintain the webpage, 2.Annually 2.Yes/No permit, SWMP,applicable update any broken links, ordinances,and annual reports. The upload new educational web page will also include a material,upload most stormwater issue recent SWMP reporting mechanism,educational 3.Set a counter to record 3.Annually 3.Report the number of materials developed by the Town, visits to webpage in visits to webpage and links to additional stormwater order to monitor annually. educational resources. The web page engagement. will also serve to advertise the stormwater hotline and opportunities for involvement. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 17 Table 13: Public Education and Outreach BMPs Permit 3.2.5: Stormwater Hotline Ref. Measures for a stormwater hotline/helpline for the purpose of public education and outreach. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #8. Stormwater Hotline A hotline will be maintained for 1.Establish and maintain 1.Permit Year 1 1.Yes/No citizens to ask stormwater questions hotline phone number and report Stormwater issues. and responsible party. 2. Establish and train a 2.Permit Year 1,as 2.Report number of staff responsible party to needed after Year 1. trained annually. answer stormwater inquiries and use of reporting mechanisms Train responsible parties in general stormwater knowledge,appropriate contacts for stormwater questions,and citizen opportunities within the Stormwater program. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 18 Table 13: Public Education and Outreach BMPs 3. Publicize and maintain 3.Annually 3.Yes/No hotline in materials developed for the stormwater program and posting on stormwater web page. 4.Establish a tracking 4.Permit Year 1 4.Yes/No mechanism to document the number and type of calls received. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 19 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM This SWMP identifies the minimum elements and implementation of a Public Involvement and Participation Program that complies with applicable State, Tribal and local public notice requirements. The Town Board and Alderman/Alderwomen will continue to function as the Town's stormwater advisory board. A stormwater hotline and stormwater issue webpage will be used to collect public input. The Town of Canton will manage, implement and report the following public involvement and participation BMPs Table 14: Public Involvement and Participation BMPs Permit 3.3.1: Public Input Ref. Mechanisms for public involvement that provide for input on stormwater issues and the stormwater program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #9. Board of Aldermen/Alderwomen Town staff will bring stormwater 1.Include bi-annual 1.Bi-annually,beginning 1.Yes/No and/or date of issues before the planning agenda item for staff to in permit year 1 meetings commission to receive citizen input report on stormwater and factor stormwater into town concerns and receive decisions. input from the commission. #10. Stormwater Hotline A hotline will be maintained for 1.Establish and maintain 1.Permit year 1-5 1.Yes/No citizens to ask stormwater questions hotline phone number and report stormwater issues and responsible party 2. Establish and train a 2. Permit year 1 as 2.Yes/No responsible party to needed after permit year answer stormwater 1. inquiries and use of reporting mechanisms 3. Train responsible 3. Annually 3.Number of Staff parties in general Trained. stormwater knowledge, appropriate contacts for stormwater questions, and citizen opportunities within the stormwater program 4. Publicize and maintain 4.Annually 4.Yes/No hotline in materials developed for the stormwater program and posting on stormwater web page DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 20 Table 14: Public Involvement and Participation BMPs 5.Establish a tracking 5. Permit year 1 5.Yes/No mechanism to document the number and type of calls received #11. Stormwater Page on Town Website The web page will provide links to 1.Establish stormwater 1.Permit Year 1. 1.Yes/No information on the Town's page stormwater program,including the 2.Maintain the webpage, 2.Annually 2.Yes/No permit, SWMP,applicable update any broken links, ordinances,and annual reports. The upload new educational web page will also include a material,upload most stormwater issue reporting recent SWMP mechanism,educational materials 3.Set a counter to record 3.Annually 3.Report the number of developed by the Town,and links to visits to webpage in visits to webpage additional stormwater educational order to monitor annually. resources.The web page will also engagement. serve to advertise the stormwater hotline and opportunities for involvement Permit 3.3.2: Volunteer Opportunities Ref. Measures to provide volunteer opportunities designed to promote ongoing citizen participation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #12. Annual County Wide Clean Up Event As part of the annual County-wide 1. Identify public areas 1. Permit year 1 1. Yes/No clean-up event,organize volunteers that could be cleaned to pick up trash or clean litter from by volunteers. public areas with potential to pollute 2. Coordinate clean-up 2. Annually 2. Report the number stormwater. of public areas. of participants and number of trash bags filled. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 21 Table 14: Public Involvement and Participation BMPs #13. Partnership with Southwestern Commission The Town will engage with the 1.Review 1. Permit Year 1 1. Yes/No/Partial Southwestern Commission to develop partnership/agreement Volunteer Opportunities that will be with Southwestern administered by Southwestern Commission and modify Commission. Opportunities will as needed. focus on residential,commercial,and 2. Review partnership 2. Permit Year 1 2. Yes/No/Partial school audiences within the MS4 plan detailing specific area. commitment of the Southwestern Commission partnership to ensure it meets requirements. 3. Monitor 3. Annually, following 3.Yes/No/Partial Southwestern establishment of Commission activities partnership to ensure partnership commitments are met DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 22 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM The Town of Canton will develop,manage, implement, document,report and enforce an Illicit Discharge Detection and Elimination Program which shall, at a minimum, include the following illicit discharge detection and elimination BMPs. Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.1: MS4 Map Ref. Measures to develop,update and maintain a municipal storm sewer system map including stormwater conveyances, flow direction,major outfalls and waters of the United States receiving stormwater discharges. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #14. Addition of Major Outfalls to MS4 Map The MS4 map will be completed 1.Add a layer 1.Permit Year 3 1.Report number of through GIS analysis of existing data. identifying major outfalls major outfalls identified Major outfalls will be identified and to the map and number numbered,and flow directions and 2. Add flow directions to 2.Permit Year 3 2.Yes/No receiving waters will be added. the ma 3. Add receiving waters 3.Permit Year 3 3.Yes/No to the ma #15. Continual Updates to MS4 Map The MS4 map will be continuously 1.When new 1.Annually,once map is 1.Yes/No updated for completeness. conveyances and outfalls complete are located or constructed add them to the ma Permit 3.4.2: Regulatory Mechanism Ref. Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to prohibit, detect, and eliminate illicit connections and discharges,illegal dumping and spills into the MS4, in luding enforcement procedures and actions. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #16. Maintain Legal Authority DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 23 Table 15: Illicit Discharge Detection and Elimination BMPs Review existing ordinance(in order 1.Review ordinance and 1.Permit year 1 1.Report if a revision is to maintain the legal update if revision is required and if a revision authority to prohibit,detect,and required to maintain is made eliminate illicit connections and legal authority discharges,illegal dumping and spills into the MS4,including enforcement procedures and actions.Update ordinance if required Permit 3.4.3: IDDE Plan Ref. Measures to maintain and implement a written IDDE Plan to detect and address illicit discharges,illegal dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4. The plan shall provide standard procedures and documentation to: a) Locate priority areas likely to have illicit discharges, b) Conduct routine dry weather outfall inspections, c) Identify illicit discharges and trace sources, d) Eliminate the source(s) of an illicit discharge, and e) Evaluate and assess the IDDE Program. BMP A B C D I No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting I Implementation Metric #17. Outfall Inspection I Perform regular dry weather(no rain 1. Train inspections staff 1.Annually 1.Number of staff in previous 72 hours)outfall to perform dry weather trained or Yes/No inspections to proactively identify outfall inspections and illicit discharges and illicit illicit discharge connections investigations 2.Inspect a Quarter of 2. Permit year 3, 2. Yes/No major outfalls per year. I Annually going forward DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 24 Table 15: Illicit Discharge Detection and Elimination BMPs 3.Inspect one group of 3.Annually,beginning in 3.Number of outfalls outfalls annually in dry permit year 4 inspected weather conditions and document any potential violations using the forms and procedure.. #18. Illicit Discharge Identification Procedure Yearly evaluation of IDDE program 1.Evaluation meeting 1.Annually,in 1.Yes/No to promote continuance of effective with IDDE program conjunction with Annual components and improvement in stakeholders;to include Assessment areas that are lacking,as well as, at least Stormwater identification of potential"hot-spot" Administrator and areas. Utilities Director 2.Review of IDDE 2. Annually,in 2. Yes/No reports and identification conjunction with Annual of chronic violators, Assessment issues,and/or"hot-spot" areas Permit 3.4.4: IDDE Tracking Ref. Measures for tracking and documenting the date(s) an illicit discharge,illicit connection or illegal dumping was observed,the results of the investigation,any follow-up of the investigation,the date the investigation was closed,the issuance of enforcement actions,and the ability to identify chronic violators. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #19. Database Tracking System A tracking system for observed IDDE 1.Identify or develop 1.Permit Year 1 1.Yes/No/Status violations and follow-on actions will staff training program for be developed and implemented in public works employees order to identify"hot-spot"areas, 2. Develop a tracking 2.Permit Year 1 2.Yes/No/Status chronic violators,and recurring spreadsheet to collect issues. data from"Potential Illicit Discharge Report" as well as the results of the investigation,any follow-up,date of closure,and enforcement actions taken 3. 3. 3. 4. 4. 4. 5. 5. 5. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 25 Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.5: Staff IDDE Training Ref. Measures to provide training for municipal staff and contractors who, as part of their normal job responsibilities,may observe an illicit discharge,illicit connection,illegal dumping or spills. Training shall include how to identify and report illicit discharges,illicit connections,illegal dumping and spills. Each staff training event shall be documented,including the a enda/materials, date, and number of staff participating. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #20. Staff Training Develop a program to educate town 1.Identify or develop 1.Permit year 2 1.Yes/no/status staff of indicators of potential illicit staff training program for discharges/connections and illegal public works employees dumping and the appropriate avenues 2. Train staff with Illicit 2. Permit year 2 2. Report dates and through which to report suspected Discharge&Detection number of attendees illicit discharge. responsibilities or the potential to discover an illicit discharge during routine work activities 3. Train new staff that 3. Annually,beginning 3. Report dates and will be part of the IDDE in permit year 3 number of attendees program #21. Fact Sheets Hang fact sheet posters in employee 1.Identify or develop 1.Permit year 2 1.Yes/no/status common areas to serve as a reminder illicit discharge fact sheet of the basics on identifying and posters to display reporting illicit discharges, 2. Display posters in 2. Annually,beginning 2.Number of posters connections,and dumping. employee common areas in permit year 2 hung Permit 3.4.6: IDDE Reporting Ref. Measures for the public and staff to report illicit discharges,illegal dumping and spills. The mechanism shall be publicized to facilitate reporting and shall be managed to provide rapid response by appropriately trained ersonnel. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #22. Stormwater Hotline A hotline will be maintained for 1.Establish and maintain 1.Permit year 1-5 1.Yes/No citizens to ask stormwater questions hotline phone number and report stormwater issues. and responsible party 2. Establish and train a 2. Permit year 1 as 2.Yes/No responsible party to needed after permit year answer stormwater 1. inquiries and use of reporting mechanisms DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 26 Table 15: Illicit Discharge Detection and Elimination BMPs 3. Train responsible 3. Annually 3.Number of Staff parties in general Trained. stormwater knowledge, appropriate contacts for stormwater questions, and citizen opportunities within the stormwater program 4. Publicize and maintain 4.Annually 4.Yes/No hotline in materials developed for the stormwater program and posting on —stormwater web page 5.Establish a tracking 5.Permit year 1 5.Yes/No mechanism to document the number and type of calls received #23. Stormwater Page on Town Website The web page will provide links to 1.Establish stormwater 1.Permit Year 1. 1.Yes/No information on the Town's page stormwater program,including the 2.Maintain the webpage, 2.Annually 2.Yes/No permit, SWMP,applicable update any broken links, ordinances,and annual reports. The upload new educational web page will also include a material,upload most stormwater issue reporting recent SWMP mechanism,educational materials 3.Set a counter to record 3.Annually 3.Report the number of developed by the town,and links to visits to webpage in visits to webpage additional stormwater educational order to monitor annually. resources.The web page will also engagement. serve to advertise the stormwater hotline and opportunities for involvement. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 27 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM In accordance with 15A NCAC 02H .0153,the Town of Canton relies upon the North Carolina Sedimentation Pollution Control Act(SPCA)of 1973 as a qualifying alternative program to meet a portion of the NPDES MS4 Permit requirements for construction site runoff control measures. The SPCA requirements include reducing pollutants in stormwater runoff from construction activities that result in land disturbance of greater than or equal to one acre, and includes any construction activity that is part of a larger common plan of development that would disturb one acre or more. The state SPCA Program is either delegated to a city/town, delegated to a county,or implemented by NCDEQ in non- delegated areas. Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Permit State or Local Program Name Legal Authority Implementing Reference Entity 3.5.1 - Haywood County 15A NCAC Chapter 04, Haywood County 3.5.4 Delegated SPCA Program* NCDEQ Approved Delegation, Interlocal Agreement/Joint Resolution,Local Ordinance * The local delegated SPCA Program ordinance(s)/regulatory mechanism(s)can be found at: https://www.havwoodcountvnc.gov/DocumentCenterNiew/124/HMywood-County-Erosion-and- Sediment-Control-Ordinance-PDF. The Town of Canton also implements the following BMPs to meet NPDES MS4 Permit requirements. Table 17: Construction Site Runoff Control BMPs Permit 3.5.6: Public Input Ref. Measures to provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #24. Municipal Staff Training Train municipal staff who receive 1. Train municipal staff 1.Annually 1.Number of staff calls from the public on the protocols on proper handling of trained, for referral and tracking of construction site runoff control construction site runoff complaint control complaints. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 28 Table 17: Construction Site Runoff Control BMPs #25. Stormwater Hotline A hotline will be maintained for 1.Establish and maintain 1.Permit year 1-5 1.Yes/No citizens to ask stormwater questions hotline phone number and report stormwater issues and responsible party 2. Establish and train a 2. Permit year 1 as 2.Yes/No responsible party to needed after permit year answer stormwater 1. inquiries and use of reporting mechanisms 3. Train responsible 3. Annually 3.Number of Staff parties in general Trained. stormwater knowledge, appropriate contacts for stormwater questions, and citizen opportunities within the stormwater program 4. Publicize and maintain 4.Annually 4.Yes/No hotline in materials developed for the stormwater program and posting on —stormwater web page 5.Establish a tracking 5. Permit year 1 5.Yes/No mechanism to document the number and type of calls received Permit 3.5.5: Waste Management Ref. Measures to require construction site operators to control waste such as discarded building materials,concrete truck washout,chemicals,litter,and sanitary waste at the construction site that may cause adverse impact to water quality. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #26. Establish and Maintain Legal Authority 1.Adopt code 1.Permit year 2 1.Yes/no/status requirements DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 29 Table 17: Construction Site Runoff Control BMPs Develop and implement an 2.Maintain legal 2.Continuously,after 2.Yes/No/status ordinance to require construction authority permit year 2 site operators to control waste. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 30 PART 9: POST-CONSTRUCTION SITE RUNOFF CONTROL PROGRAM This SWMP identifies the minimum elements to develop, implement and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre,including projects less than one acre that are part of a larger common plan of development or sale,that are located within the Town of Canton and discharge into the MS4. These elements are designed to minimize water quality impacts utilizing a combination of structural Stormwater Control Measures (SCMs)and/or non-structural BMPs appropriate for the community and ensure adequate long- term operation and maintenance of SCMs. In accordance with 15A NCAC 02H .0153 and.1017,the Town of Canton implements the following State post-construction program requirements,which satisfy the NPDES Phase II MS4 post-construction site runoff control requirements as Qualifying Alternative Programs(QAPs) in the MS4 area(s)where they are implemented. Table 18: Qualifying Alternative Program(s) for Post-Construction Site Runoff Control Program State QAP Name State Requirements Local Ordinance/Regulatory Mechanism Reference None N/A N/A The Town of Canton has existing requirements other than Qualifying Alternative Program(s) for implementation of the NPDES Phase 11 MS4 post-construction program requirements. These existing requirements are codified in local ordinance(s), and implementation is further defined in guidance, manuals and/or standard operating procedure(s)as summarized in Table 19 below. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 31 DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 32 Table 19: Summary of Existing Post-Construction Program Elements Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Plan Review and Approval and/or Document Title(s) 3.6.2(a)Authority Town of Canton Stormwater Ordinance 9/25/2007 Article 1:100 3.6.3(a)& 15A NCAC 02H.0153(c) Town of Canton Stormwater Ordinance 9/25/2007 Federal, State&Local Projects Article 1:103 3.6.3(b)Plan Review Town of Canton Stormwater Ordinance 9/25/2007 Article 4:402 3.6.3(c)O&M Agreement Town of Canton Stormwater Ordinance 9/25/2007 Article 5:500 3.6.3(d)O&M Plan Town of Canton Stormwater Ordinance 9/25/2007 Article 5:500 3.6.3(e)Deed Restrictions/Covenants Town of Canton Stormwater Ordinance 9/25/2007 Article 5:500 3.6.3(f)Access Easements Town of Canton Stormwater Ordinance 9/25/2007 Article 5:500 Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Inspections and Enforcement and/or Document Title(s) 3.6.2(b)Documentation Town of Canton Stormwater Ordinance 9/25/2007 Article 1:100-103 3.6.2(c)Right of Entry Town of Canton Stormwater Ordinance 9/25/2007 Article 5:501 3.6.4(a)Pre-CO Inspections Town of Canton Stormwater Ordinance 9/25/2007 Article 5:501 3.6.4(b)Compliance with Plans Town of Canton Stormwater Ordinance 9/25/2007 Article 4:402 3.6.4(c)Annual SCM Inspections Town of Canton Stormwater Ordinance 9/25/2007 Article 5:501 3.6.4(d)Low Density Inspections 3.6.4(e)Qualified Professional Town of Canton Stormwater Ordinance Article 9/25/2007 5.501 Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Fecal Coliform Reduction and/or Document Title(s) 3.6.6(a)Pet Waste Town of Canton Stormwater Ordinance 9/25/2007 Article 7:700 3.6.6(b)On-Site Domestic Town of Canton Stormwater Ordinance 9/25/2007 Wastewater Treatment Article 7:700 DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 33 The annual reporting metrics for the post construction program are provided in Table 20: Post Construction Site Runoff Control BMPs below. Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.5(a),3.6.5(b),and 4.1.3: Minimum Post-Construction Reporting Requirements Ref. Measures to document activities over the course of the fiscal year(July 1 —June 30)including appropriate information to accurately describe rogress, status, and results. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #27. Standard Reporting Implement standardized tracking, 1. Track number of low 1. Continuously 1.Number of plan documentation,inspections and density and high-density Permit Years 1-5 reviews performed for reporting mechanisms to compile plan reviews performed. low density and high appropriate data for the annual self- density. assessment process. Data shall be 2. Track number of low 2. Continuously 2.Number of plan provided for each Post-Construction/ density and high-density Permit Years 1-5 approvals issued for low Qualifying Alternative Program plans approved. density and high density. being implemented as listed in Tables 3.Maintain a current 3. Continuously 3. Summary of number 18 and 19. inventory of low-density Permit Years 1-5 and type of SCMs added projects and constructed to the inventory;and SCMs including SCM number and acreage of type or low-density low-density projects acreage,location and last constructed. —inspection date. 4. Track number of SCM 4. Continuously 4.Number of SCM —inspections performed. Permit Years 1-5 inspections. 5. Track number of low- 5. Continuously 5.Number of low- density inspections Permit Years 1-5 density projects erformed. inspected. 6. Track number and 6. Continuously 6.Number of type of enforcement Permit Years 1-5 enforcement actions actions taken. issued. Permit 3.6.2: Legal Authority Ref. Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to: (a)review designs and proposals for new development and redevelopment to determine whether adequate stormwater control measures will be installed, implemented, and maintained, (b)request information such as stormwater plans, inspection reports,monitoring results, and other information deemed necessary to evaluate compliance with the Post-Construction Stormwater Management Program, and(c)enter private property for the purpose of inspecting at reasonable times any facilities, equipment,practices, or operations related to stormwater discharges to determine whether there is compliance with the Post-Construction Stormwater Management Program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 34 Table 20: Post Construction Site Runoff Control BMPs #4. This permit requirement is fully met by the existing post-construction program,see references provided in Table 19 Permit 3.6.3: Plan Review and Approval Ref. Measures to maintain plan review and approval authority, standards and procedures to: (a)Require Federal, State, and local government projects to comply with Post-Construction Program requirements throughout the entire MS4 permitted area,unless the entity is subject to its own NPDES MS4 permit or a qualifying alternative program, (b)Conduct site plan reviews of all new development and redeveloped sites that disturb greater than or equal to one acre, and sites that disturb less than one acre that are part of a larger common plan of development or sale for compliance with 15A NCAC 02H .1017 and the qualifying alternative programs that apply within your jurisdiction, (c)Ensure that each project has an Operation and Maintenance Agreement that complies with 15A NCAC 02H .1050(12),(d)Ensure that each project has an Operation and Maintenance Plan that complies with 15A NCAC 02H .1050(13),(e)Ensure that each project has recorded deed restrictions and protective covenants,that require the project to be maintained consistent with approved plans, and(f)Ensure that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15A NCAC 02H 1050 9 and(10). BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #28. Revisions to Code of Ordinances Revise existing ordinance to 1.Revise code to 1.Permit year 2 1.Report code reference specifically require compliance by Require Federal, State, and date adopted Federal, State,and Local government and local government projects and revise reference to projects to comply with stormwater design manual to specify post construction NCDEQ Stormwater Design manual. requirements unless subject to its own NPDES MS4 permit or qualifying alternative program 2. Revise link to 2. Permit year 2 2.Report updated link NCDEQ Stormwater and date revised. Design Manual as the reference stormwater design manual in Article 401. #29. Operations&Maintenance Plan Add an ordinance to the town code 1.Establish legal 1.Permit Year 2 1.Report code reference requiring each stormwater control authority through code and date adopted. measure to have an Operation and revisions. Maintenance Plan that complies with 2.Enforcement of new 2.Continuously after 2.Yes/No 15A NCAC 02H.1050(13) code by requiring Permit Year 2. approval of O&M Plan by Stormwater Administrator prior to plan approval 3. DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 35 Table 20: Post Construction Site Runoff Control BMPs 4. 4. 4. 5. 5. 5. Permit 3.6.4: Inspections and Enforcement Ref. Measures to maintain inspection and enforcement authority, standards and procedures to: (a) Conduct post- construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy. Alternatively,the project owner may provide a surety bond to guarantee compliance with the approved plan(s), (b)Ensure that the project has been constructed in accordance with the approved plan(s), (c)Ensure annual inspection of each permitted SCM to ensure compliance with the approved Operation and Maintenance Agreement, (d)Ensure inspection of low density projects at least once during the permit term, and(e)Require that inspections be conducted by a qualified professional. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #30. Inspection of low-density projects Establish the legal authority for 1.Establish legal 1.Permit Year 2 1.Report Code inspection of low-density projects at authority through code Reference and Date least once during the permit term; revisions and carry out the inspections Adopted. 2. Conduct inspection of 2. Continuously 2.Number of low- 20%of low-density Permit Years 1-5 density projects projects each year inspected. Permit 3.6.6: Fecal Coliform Reduction Ref. Measures to control,to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H .1017(7). At a minimum,the program shall include: (a)A pet waste management component,which may be achieved by revising an existing litter ordinance, and(b)An on-site domestic wastewater treatment system component, if applicable,which may be coordinated with local county health department,to ensure proper operation and maintenance of such systems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #31. This permit requirement is fully met by the existing post-construction program,see references provided in Table 19 DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 36 PART 10:POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS This SWMP provides a comprehensive pollution prevention and good housekeeping strategy for the Town of Canton municipal facilities and operations. Pollution prevention and good housekeeping is accomplished through the implementation of seven required programs,which collectively address the ultimate goal of preventing or reducing pollutant runoff from municipal operations such as parks and open space maintenance, fleet and building maintenance,new construction and land disturbances, and municipal storm sewer system maintenance. Pollution prevention and good housekeeping for municipal operations includes the following programs: 1. Municipal Facilities Operation and Maintenance Program 2. Spill Response Program 3. MS4 Operation and Maintenance Program 4. Municipal SCM Operation and Maintenance Program 5. Pesticide,Herbicide and Fertilizer Management Program 6. Vehicle and Equipment Maintenance Program 7. Pavement Management Program The Town of Canton will manage, implement and report the pollution prevention and good housekeeping BMPs as specified in Table 21 below for each required program. Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.1: Municipal Facilities Operation and Maintenance Program Ref. Measures to manage facilities that are owned and operated by the permittee and have the potential for generating polluted stormwater runoff. The permittee shall maintain a current inventory of municipal facilities;perform facility inspections and routine maintenance;establish specific frequencies,schedules,and standard documentation;provide staff training on general stormwater awareness and imp ementing pollution prevention and good housekeeping ractices. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric I #32. Inventory of Municipal Facilities I DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 37 Table 21: Pollution Prevention and Good Housekeeping BMPs Develop and maintain an up-to-date 1. Compile list of 1.Permit year 1 1.Number of facilities inventory of municipal facilities with existing Town- inventoried;date list is potential to generate polluted runoff owned facilities completed 2.Perform initial 2.Permit year 2 2.Number of inspection of facilities inspections performed, for potential to generate and number of facilities polluted runoff or classified as high requiring spill response potential and low procedures. Classify potential facilities as having high or low potential for stormwater pollution 3.Determine which 3.Permit year 2 3.Number of SPCC facilities require a Plans required SPCC 4.Determine which 4. Permit Year 1 4.Report name of facilities require a facilities that require NPDES Industrial NPDES Industrial Permit permit and Permit Number. 5.Update inventory as 5.Continuously as 5.Number of facilities needed when facilities needed. added/revisions made to are added or removed list. from inventory. #33. Facility Inspections Inspection of Town facilities to 1.Establish a SOP for 1.Permit year 2 1.Yes/no/status confirm good housekeeping practices Town facility are being followed,including vehicle inspections,including an and equipment cleaning inspection schedule, inspection report documentation,and tracking system 2. Implement annual 2.Permit Year 3, 2.Number of inspections facility inspections for annually thereafter of high potential and low high stormwater potential facilities pollution potential performed facilities and once per permit term inspections for low potential facilities,following SOP established in BMP No. 33.1 I #34. Staff training I DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 38 Table 21: Pollution Prevention and Good Housekeeping BMPs Develop or identify a staff training 1.Develop or identify 1.Permit year 2 1.Yes/no/status program for general stormwater appropriate training pollution prevention and provide to program public works department employees 2.Provide initial training 2.Annually,beginning in 2.Number of staff for all employees permit year 3 members trained and topics from training 3.Provide training for 3.Annually,beginning 3.Number of new hires new hires in permit year 3,as trained and topics from necessitated by staffing training changes Permit 3.7.2: Spill Response Program Ref. Measures for facilities and operations that store and/or use materials that have the potential to contaminate stormwater runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill response procedures. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #35. Inventory of facilities with Spill potential Maintain a list of town facilities and 1.Update list of town 1.When necessitated by 1.Number of additions operations storing materials that facilities and operations changes in facilities or or revisions. would be a pollutant if spilled and with spill potential when operations introduced to the stormwater system facilities or operations and classify by hazard and quantity are changed See BMP 36.2 #36. Spill Response Procedures Maintain spill response procedures 1.Review general spill 1.Permit year 1 1.Yes/No/Status and continue training of appropriate response procedures staff 2.Review specific spill 2.Permit year 1 2.Yes/No/Status response procedures for town facilities and operations with potential to produce high hazard spills 3.Update as facilities 3.As required 3.Number of additions and operations are or revisions recorded. revised 4. Train new fire 4.As required 4.Number of new staff department staff in spill trained response procedures 5. Train staff at facilities 5.Annually 5.Number of staff with potential for high trained hazard spills in first response actions and reporting rocedures DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 39 Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.3: MS4 Operation and Maintenance Program Ref. Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and maintenance staff training on stormwater awareness and pollution prevention,perform MS4 inspections,maintain the collection system including catch basins and conveyances;and establish specific frequencies,schedules,and standard documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #37. Number of staff trained Develop or identify a staff training 1.Develop or identify 1.Permit year 2 1.Yes/no/status program for general stormwater appropriate training pollution prevention and provide to program public works department employees 2. Provide initial training 2.Annually,beginning in 2.Number of staff for all employees permit year 3 members trained and topics from training 3. Provide training for 3. Annually,beginning 3.Number of new hires new hires in permit year 3,as trained and topics from necessitated by staffing training changes DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 40 Table 21: Pollution Prevention and Good Housekeeping BMPs #38. MS4 System Inspections and Maintenance A proactive plan for MS4 system 1.Develop a SOP that 1.Permit year 2 1.Yes/no/status maintenance,requiring regular includes proactive inspections and maintenance. inspection schedules, standard documentation,staff responsibilities,and proper maintenance training 2. Perform regular 2.Year 3 and annually 2.Number of inspections inspections in afterward,following documented accordance with the SOP schedule established in SOP 3.Verify,document, 3.Continuously,as 3.Number of and prioritize potential maintenance maintenance activities maintenance activities activities are identified performed identified by inspections or citizen reports 4.Develop an 4.Permit year 2 4.Yes/no/status inspection and maintenance tracking system to be used in accordance with the SOP and to identify "hot spot"locations for system maintenance DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 41 Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.4: Municipal SCM Operation and Maintenance Program Ref. Measures to manage municipally owned,operated,and/or maintained structural stormwater control measures(SCMs)that are installed for compliance with the permittee's post-construction program. The permittee shall maintain a current inventory of SCMs,perform SCM inspections and maintenance,and shall establish specific frequencies,schedules,and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #39. Inventory of Municipal structural SCMs Development and maintenance of a 1.Create an inventory of 1.Permit year 1 1.Number of municipal current inventory of municipally existing town owned structural SCMs owned structural SCMs. SCMs with information including type,year built, date of last inspection,and maintenance actions 2. Compile,and 2.Permit year 2 2.Yes/no/status develop as needed, Operation and Maintenance Plans for all town-owned SCMs 3.Update as 3.As required 3.Number of updates to necessitated list by new town development DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 42 Table 21: Pollution Prevention and Good Housekeeping BMPs #40. SCM Inspections and Maintenance Performance and documentation of 1.Locate town-owned 1.Permit year 1 1.Report the number regular inspection and maintenance SCMs and add them to and type of SCMs of municipally owned structural the MS4 Map with type added to the map SCMs.Addition of municipally of SCM indicated owned SCMs to MS4 map. 2.Update the map 2.Annually, once 2.Note annually when new town owned BMPs No.41.1 and whether new town SCMs are constructed 42.1 are completed owned SCMs were added.If any are added, note number and type added as well as number and type of SCMs manned to date 3.Maintain NC SCM 3.Continuously, 3.Number of staff Inspections and beginning in permit year members with active Maintenance 2 certification Certification for appropriate personnel 4.Develop SCM 4.Permit year 2 4. Yes/no/status —inspection form 5.Inspect each device 5.Annually,beginning 5.Number of SCMs using SCM inspection in permit year 3 inspected,number form passing inspection, number requiring maintenance 6.Perform maintenance 6.As required 6.Number of SCMs tasks identified in maintained inspections 7.Develop a tracking 7.Permit year 2 7. Yes/no/status document DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 43 Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.5: Pesticide,Herbicide and Fertilizer Management Program Ref. Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide routine pollution prevention and chemical use,storage and handling training,and shall ensure compliance with permits and a licator certifications. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #41. Pesticide,Herbicide,Fertilizer Applicator Training Training of town staff who apply 1.Maintain Right-of-way 1. Continuously 1.Yes/no/status landscape chemicals to minimize Pest Control,Public water quality impacts from Health Control,and pesticides,herbicides,and fertilizers. Ornamental&Turf Pest Control applicator certifications for —appropriate ersonnel 2. Develop or identify 2.Permit year 2 2.Yes/no/status pollution prevention and chemical use, storage and handling training 3.Provide staff training 3.Annually,beginning in 3.Number of staff in pollution prevention permit year 3 trained,and topics and chemical use, covered storage and handling training DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 44 Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.6: Vehicle and Equipment Maintenance Program Ref. Measures to prevent and minimize contamination of stormwater runoff from areas used for municipal vehicle and equipment maintenance and/or cleaning. The permittee shall ensure that municipal industrial facilities subject to NPDES industrial permitting comply with those permit requirements,provide routine pollution prevention training to staff, erform routine inspections,and establish specific frequencies,schedules,and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #41. NPDES Industrial Permit Compliance Ensure that NPDES industrial permit 1.Review municipal 1.Permit year 1 1.Report Name of compliance occurs at all applicable facilities inventory to facilities determined to municipally owned sites. determine which require a NPDES facilities require a Industrial Permit and NPDES permit permit number. 2. Permitting of 2. Permit year 1, 2. Report number of new municipally owned following review of permits received or facilities;apply for new facilities,and renewed as well as permits and confirm that continuously thereafter number of active all existing permits are permits. valid.Renew permits as required 3.Develop a municipal 3. Permit year 1 3. Yes/no/status industrial facility —inspection form 4. Perform facility 4. Annually,after 4.Number of inspections inspections for NPDES permits acquired performed —compliance with permit 5. Establish NPDES 5. Permit year 1 5. Yes/no/status Industrial Permit tracking mechanism to document list of municipally owned facilities with permit, permit expiration dates, and inspections #42. Vehicle and Equipment Cleaning and Maintenance Facility Inspection Routine inspections as part of general 1.Develop an inspection 1.Permit year 2 1.Yes/no/status facility inspections to ensure that checklist vehicle and equipment facilities are 2. Perform inspections 2. Bi-annually,beginning 2.Number of inspections following proper procedures to using inspection in permit year 3 minimize water quality impacts from checklist and notify vehicle and equipment cleaning and facility manager of any maintenance corrective actions required DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 45 Table 21: Pollution Prevention and Good Housekeeping BMPs 3.Perform re-inspections 3. As required by 3.Number of facilities of any facility that corrective actions issued requiring corrective required corrective action,number of action resolutions #43. Staff Training Provide general stormwater 1.Develop or identify 1.Permit year 2 1.Yes/no/status awareness training and pollution appropriate training prevention training to employees program working in vehicle maintenance and 2.Provide initial training 2.Annually,beginning in 2.Number of staff cleaning areas for all employees permit year 3 members trained and topics from training 3.Provide training for 3.Annually,beginning 3.Number of new hires new hires in permit year 3,as trained and topics from necessitated by staffing training changes Permit 3.7.7: Pavement Management Program Ref. Measures to reduce pollutants in stormwater runoff from municipally owned streets,roads,and parking lots within the permittee's corporate limits. The permittee shall implement measures to control litter,leaves,debris,particulate and fluid ollutants associated with vehicles,and establish specific fre uencies,schedules,and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric #44. Street Sweeping Street sweeping following a regular 1.Develop a SOP, 1.Permit year 1 1.Yes/no/status schedule to reduce pollutants including a schedule and from town owned and maintained plan to document streets 2. Implement SOP and 2. Annually,beginning 2. Total number of street documentation in permit year 2 miles swept #45. Leaf Collection Periodic collection of leaves from 1.Develop a SOP, 1.Permit year 1 1.Yes/no/status residential and public areas to reduce including a schedule and pollutants and clogging of storm -plan to document system inlets. 2. Implement SOP and 2. Regularly,beginning 2. Volume of leaves documentation in permit year 2 collected tons #46 Vehicle Spill Cleanup An organized vehicle spill cleanup 1 Maintain spill response 1. Permit Year 1 1. Yes/No response to prevent pollutants from procedures by periodic vehicular accidents from entering the reviews. storm drain system 2.Provide public 2. Permit Year 2 2. Yes/No education about stopping vehicle leaks DRAFT NCS000476 SWMP Town of Canton February 20,2023 Page 46