Loading...
HomeMy WebLinkAboutNCC232303_ESC Approval Submitted_20230801 s' STA e ik":..,,, -„,N ROY COOPER C ' %• 1.- f� 1,1 ,,..,++ Governor '"' y �n.nnn ;^a. MICHAEL S.REGAN , �,,,,, „,i Secretary BRIAN WRENN NORTH CAROLINA Environmental Quality Director July 17,2020 LETTER OF APPROVAL International Tie Disposal,LLC Basil Polivka,President&CEO/Member 13700 Providence Road, Suite 200 Weddington,NC 28104 RE: Project Name: International Tie Disposal,Hamlet Yard Acres Approved: 52.5 Project ID: RICHM-2024-001 County: Richmond,City: Hamlet Address: Marks Creek Church Road River Basin: Lumber Stream Classification: Other Submitted by: Brett Garvey Date Received by LQS: July 12,2020 Plan Type: Residential Dear Mr. Polivka: This office has reviewed the subject erosion and sedimentation control plan.We find the plan to be acceptable and hereby issue this Letter of Approval.The enclosed Certificate of Approval must be posted at the job site.This plan shall expire three(3)years following the date of approval, if no land disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(NOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially,DEMLR will not charge a fee for coverage under the NCG01 permit. However,on or after June 1,2019,a$100 fee will be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality ! Division of Energy,Mineral and Land Resources Fayetteville Regional Office C 225 Green Street.Suite 714E Fayetteville.North Carolina 2830i <_.,r: r., 910.433.3300 Title 15A NCAC 4B .O118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations,and rules. In addition, local city or county ordinances . or rules may also apply to this land-disturbing activity. This approval does not supersede any other peiniit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would req uire a rev ised wised plan and additional application fee. Anyaddition n in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project.Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR-Fayetteville Regional Office Enclosures: Certificate of Approval cc: Brett Garvey,P. E., TranSystems—electronic copy Gary Williams, Richmond County Inspections Office—electronic copy Fayetteville Regional Office gi ,5 rr, q-0.1 eD.... ot CD CD eDOW• �• 0"ID; C O n o 0 o ® �q " O Oa 0 w N 0 O E. 741 1-4 g eD l 1 USG ® ® C O ' CD C C n C cam. wr. K CD CD r) n N �• v c ° o ' cD un O re)cD �' (Pp V , 4 _, 0,.., :. 0 0 u'ft. /4,,,,',t---A-<-..: ...L','5.1 '.5. C ,..r r ii;. r•Iffry • ;ii;, i ›. v ,...:), ,....t. ,„ eit >1",...., % ~ tt C ¢' : w 00 CM .41 `-7 (-, n til 1=1 o >;mi - .&- IO CM SD Cr Z .p TZ r-, :ri cd 0 z Cr • 1x x i' S k g 1 S I i • it P 5 I I I S p S iii 1 p 3 I 1. 1 I I , i Fact Sheet n the New NCGOI Permit April 2019 .2,,, ,., .,. " was renewed on April 1,2019.The updated permit The NC Construction General Permit(also known as"NCG01") there is a new does not significantly change the measures that are required a implemented described below Most notably,eS However, there are some organizational and technical updates to thepermit un an NCGO1 permit though an tronic p process in which construction sites will obtain official coverage ma e all of these upd test If you have questions, process. DEMLR worked with a broad team of stakeholders contact Annette Lucas at Annette lucas ncd _g.Lov or(919)707-3639. to Know organizational Updates Acronymsg roof of coverage under an NCG01 permit permit; COC: Certificate of Coverage,p Mineral, and Land Resources The new p DEMLR: NC Division of Energy, ® Repeats state requirements for E&SC Plans and organizes them with federal E&SC: Erosion&Sedimentation Control construction rly o g activity requirements; e-NO1: Notice of Intent,application form for the NCG01 permit clearlyorganized by topic; and e-NOT: Notice of Termination,form for closing out the NCG01 permit • Is g SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 • Has less text and more tables. � ��� - Technical Updates The new permit: ` C"' z • Requires that the E&SC Plan meet --� SWPPP requirements(p. 2); k,� r�klK • Provides a list of items that must be included in the SWPPP,such as the construction sequence, plans, z calculations, etc. (p. 2-4);' rho asses and x, �' • Has updated language on bypasses .4 �E'Y ` upsets that is tailored to construction ` ,.p activities(p. 10); • Puts all timeframes for inspections, The NCG01 Process record-keeping and reporting in"calendar days"for clarity and The new NCG01 applies to permits approved on or after April 1,2019. consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCGO1 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least permit. Federal rules require that DEMLR receive an NOIct onitsownach COC. once per 7 calendar days and after construction project and issue each construction prof every storm> 1.0 inch(previously 0.5 inch);3 and Under the new NCG01 process,construction sites will continue to Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated • just like before. After receiving E&SC Plan approval, holidays from normal business hours local E&SC program unless construction activities take permittees will officially obtain coverage under the NCG01 by 23 . completing an a-NOI (available to fill out and submit on-line. b he e-NOI will place (p ) only take about 20 minut 1 This list is based on website guidance will beno charge associatedwith there applying for an NCG01 by the DEMLR Sediment Program. permit but on or around June 1, 2019, DEMLR will begin charging a$100 x The number of calendar days was annual general permit fee as required per§143-215.3D. selected to be as equivalent as m that will allow an possible with the previous permit. DEMLR is working on creating a single mfoleran E&SC application permit forrt and an NCG01 3 The intent is to provide predictability applicant to simultaneously apply to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at DEMLR. Q&A About the New NCGO1 Permit Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific COC to every construction delegated local E&SC Programs?O1 affect the 1 site that disturbs one acre or more. DEMLR is working to create a form Local programs will continue to review that combines the E&SCplan approval / and e-NOI processes, but that will and approveF take more time. For now, DEMLR has created an efficient e-NOI process. they will no longer send copies of the E&SC plans, However, 3 If an E&SC Plan is approvedp s before April 1,which permit applies? NCGO1 with E&SC Plan approvals. Projects with alreadyapprovedDEMLR will provide sample language to E&SC Plans will automatically follow the new NCG01 permit, but will not need to fill out an e-NOI or pay an annual usein local E&SC permit fee.However,the permittees should print the new permit and the advise aermittettees that they must Plan approvals to two standard detail sheets and have them on site. submit an e-NOI to DEMLR. 1 Will DEMLR offer tools to help 1 permittees comply with the new NCG01? Yes,DEMLR will provide two sample plan sheets at deg,nc.gov/NC01 that L� 4 can be placed into the E&SC plan set. The first covers the site stabilization f, �' g „z and materials handling portions of the permit, The second sheet covers the inspection, record keeping and reporting 1 P g portions of the permit. �,,, l ,' , 'r How will the new e-NOI submittal and COC process work? a � "a �. 1 Permittees will apply for E&SC Plan approvalss I from either DEMLR or the delegated loco!E&SC program Pike before, The E&SC a instruct the permittee to visit de .nc. ov NCG01 to submitr anoval le-NOI foetter rm programs are not required to DEMLR.The permittee may begin the construction activit after Local q ed to submittal of the e-NO1.The permittee is required to print a copyof the check if permittees have submitted e permit and retain it on site. Initially,the COC will be issued for free but on NOIs to DEMLR' However, if they wish or around June 1, 2019,a $100 annual general permit fee will be charged, to do this blevoluntarily,OEthere will be a tool available on DEMLR's web site for Who is allowed to submit an e-NOI form? them to view a list of construction Submittal must be by a responsible corporate officer that owns or projects that have submitted e-NOIs. operates the activity,such as a president,secretary, treasurer,or vice When local programs close out an E&SC president or a manager that is authorized in accordance with IV.B.6 of the Plan,the close-out letter will advise NCGO1 permit. Additional signatory options are set forth in IV.B.6 of the permittees that they must submit an e- permit. It is possible for consultant to prepare the e-NOI,save it as a draft, and email it to the responsible entity for signature &submittal. lannguageMLR will provide sample r What happens1 to the COC when the construction activity is complete? Local programs may approve E&SC When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan.After DEMLR or the local plans that meet state sediment laws E&SC program inform the permittee of the project close out via inspection and rules even if those plans are not report,the permittee will visit deg n. , ,.g v/NCG01 to submit an e-NOT, compliant with all of the NCG01 requirements. However, their Will there be a grace period for adherence to the new process? permittees will be required eto providedtwo by DEMLR does not have the authority to grant a grace period from a plan sheets federally mandated permit. Permittees will be informed of the new DEMLR}y fuhy C mply Plans he ground that the process via web site, E&SC Plan approval letters and list servs. if a stabilization, materials handling, and construction activity disturbs one acre or more(or is part of common plan inspection, record-keeping and of development that disturbs one acre or more)fails to submit an e-NOI after approvalreporting portion of the NCGO1 permit. of its E&SC Plan,this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. 1 1 i