LETTER OF APPROVAL WITH MODIFICATIONS
Contender Development, Inc.
ATTN: Joshua Howard
5 Century Drive Suite 210
Greenville, SC 29607
RE: Project Name: Ashby Village-Phase 1
Acres Approved: 53 Acres
Project ID: LEE-2023-010
County: Lee
City: Sanford
Address: NC 87 Hwy/Ashby Road
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Mike Zaccardo, P.E., Timmons Group
Date Received by LQS: September 23, 2022
Plan Type: Residential
Dear Mr. Howard,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee
is processed,you will receive the COC via email. As the Financially Responsible Party shown on
the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
Q�� Dpvm Quality Ene
D E RaleighNorth Regional Carolina Office
artment I1628of MEn ail Service ironental Center 13800Division Barrett Drive
nergy,I Raleigh,Mi eral NorthandLand CarolinaRsources 27609
919.791.4200
Letter of Approval
Contender Development, Inc.
Reissued: July 21, 2023
Page 2 of 4
direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If,following the commencement
of this project, it is determined that the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form,which you provided. This permit allows for a land-disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding the acreage will
be a violation of this permit and would require a revised plan and additional application fee. You
are requested to file an amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Your cooperation is appreciated.
Letter of Approval
Contender Development, Inc.
Reissued: July 21, 2023
Page 3 of 4
Sincerely,
ilall-
fatit ----
Dylan einhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
cc: Regional Office file
Mike Zaccardo, P.E., Timmons Group
Letter of Approval
Contender Development, Inc.
Reissued: July 21, 2023
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Ashby Village-Phase 1
Project ID: LEE-2023-010
County: Lee
1. Provide copies of access/encroachment agreements from NCDOT and other public or
private party entities. (GS 113A-54.1(a))
2. Provide a copy of the USACE 404 permit and DWR 401 certification for the office file.
Provide a copy of the DWR Buffer Determination and Buffer Authorization. Submit
documentation with maps showing location and extent of impacts to streams and
wetlands with any special conditions pertaining to erosion and sediment control and
restoration of affected areas. Identify the streams, wetlands, and buffers (Zone 1 and
Zone 2) on the plan sheets. Identify the permitted impacts and impact areas on the
erosion and sedimentation control plan sheets to correspond with the USACE and
DWR documents. Include any additional measures, construction specifications,
maintenance requirements and construction sequencing as required by the
404/401/Buffer Determination and Buffer Authorization on the plan sheets. (GS 113A-
54.1(c), 15A NCAC 04B .0106(1))
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities