Loading...
HomeMy WebLinkAboutNCC232296_ESC Approval Submitted_20230801 7 O • 4\;, R�. ROY COOPER ;u __`_ `ak Governor 211 c; Y yrt .4 ELIZABETH S.BISER _ * Secretary *`sFp ,mt�'= BRIAN WRENN NORTH`CAROLINA Director Environmental Quality November 28, 2022 Reissued: July 21, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Contender Development, Inc. ATTN: Joshua Howard 5 Century Drive Suite 210 Greenville, SC 29607 RE: Project Name: Ashby Village-Phase 1 Acres Approved: 53 Acres Project ID: LEE-2023-010 County: Lee City: Sanford Address: NC 87 Hwy/Ashby Road River Basin: Cape Fear Stream Classification: Other Submitted By: Mike Zaccardo, P.E., Timmons Group Date Received by LQS: September 23, 2022 Plan Type: Residential Dear Mr. Howard, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please Q�� Dpvm Quality Ene D E RaleighNorth Regional Carolina Office artment I1628of MEn ail Service ironental Center 13800Division Barrett Drive nergy,I Raleigh,Mi eral NorthandLand CarolinaRsources 27609 919.791.4200 Letter of Approval Contender Development, Inc. Reissued: July 21, 2023 Page 2 of 4 direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Letter of Approval Contender Development, Inc. Reissued: July 21, 2023 Page 3 of 4 Sincerely, ilall- fatit ---- Dylan einhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: Regional Office file Mike Zaccardo, P.E., Timmons Group Letter of Approval Contender Development, Inc. Reissued: July 21, 2023 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Ashby Village-Phase 1 Project ID: LEE-2023-010 County: Lee 1. Provide copies of access/encroachment agreements from NCDOT and other public or private party entities. (GS 113A-54.1(a)) 2. Provide a copy of the USACE 404 permit and DWR 401 certification for the office file. Provide a copy of the DWR Buffer Determination and Buffer Authorization. Submit documentation with maps showing location and extent of impacts to streams and wetlands with any special conditions pertaining to erosion and sediment control and restoration of affected areas. Identify the streams, wetlands, and buffers (Zone 1 and Zone 2) on the plan sheets. Identify the permitted impacts and impact areas on the erosion and sedimentation control plan sheets to correspond with the USACE and DWR documents. Include any additional measures, construction specifications, maintenance requirements and construction sequencing as required by the 404/401/Buffer Determination and Buffer Authorization on the plan sheets. (GS 113A- 54.1(c), 15A NCAC 04B .0106(1)) Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities