Loading...
HomeMy WebLinkAboutNC0026441_Quarterly SOC Progress Report (Q2 2023)_20230728Tobin of *fYer cftp Public Works and Utilities 07/24/2023 Scott Vinson, Raleigh Regional Office Supervisor Division of Water Resources/Water Quality Operations Section 3800 Barrett Drive Raleigh NC 27609 Water Quality Permitting Section/NPDES 1617 Mail Service Center Raleigh NC 27699-1617 Dear Mr. Vinson: NC Dept of Environmental Quality Jul 8 %VI, Xaleigh Regional Office Subject: Special Order by Consent (SOC) EMCSOC WQS22-Q33=vo3 � Quarterly SOC Progress Report -J/p170.-3 2nd Quarter 2023 NPDES Permit NCO026441 Chatham County Please accept this submittal as a quarterly progress report for the work and activities for the Town of Siler City under the Special Order by Consent. Scheduled Activities paragraph 2(a) Quarterly Reports Quarterly Nutrient Optimization Report and Quarterly SOC Report were submitted on April 30, 2023 Collection System Permit WQCS00056 Permit for Main Interceptor Replacement Project was Submitted on February 28, 2023, Sewer Extension Permit was issued on April 19, 2023. ARPA Sewer Rehabilitation Project Engineering Report was submitted on May 1, 2023, (not a formal activity) All other Activities are scheduled for future quarters and are currently expected to be on schedule. NPDES Permit NCO026441 [UP Permits were issued to Mountaire Farms, Brookwood Farms, and the Siler City Water Treatment Plant on May 19, 2023. Mountaire Farms requested an adjudicatory hearing for their permit which was held on July 21 and outcome is currently pending. Chris McCorquodale Director of Public Utilities PO Box 769. 311 N. Second Avenue Slier City, NC 27344.0769 cmccorquodale@silercity.org Phone: 919.742-4732•Fax: 919-663-3874 www.silercity.org To advance a framework for our success through balanced governance, dymmnic partnerships, and an engaged community. Supplemental Aeration Equipment has been installed in the oxidation ditch basins. The installation was complete on May 26, 2023 with initial email notification on May 30 and a formal letter on June 29, 2023 notifying NCDEQ of completion. All other Activities are scheduled for future quarters and are currently expected to be on schedule. Water Treatment Plant IUP Permit was issued to the Siler City Water Treatment Plant on May 19, 2023. Construction of the WTP Pretreatment Improvements is still underway. The Contractor's latest schedule indicates completion by the end of September due to delays primarily associated with material delivery. An extension request for this activity has been approved. McGill Associates has been retained to provide Engineering services for the WTP Solids Handling Improvements and is currently preparing an Engineering Report evaluating alternative configurations. Action Items under Paragraph 4(a) Phase 1 All Action Items associated with Phase 1 have been completed. Phase 2 Town is working to obtain all permits required to begin construction for the WWTP. Additional funding for the project to meet the current estimated budget is expected to be available in August and the project will be advertised for bids when funds are confirmed to be available. As noted above, supplemental aeration equipment installation was completed on May 26, 2023. As noted above, the Town is issued updated IUPs on May 19, 2023 Phase 3 No overflows from the Town's WTP have occurred from date of execution of the SOC. As noted above, the WTP pretreatment system improvements schedule has been delayed and is expected to be complete by the end of September 2023. Phase 4 Activities are scheduled for future quarters. Additional Wastewater Flow Pursuant to Paragraph 4 Issuance of the IUPs included issuance of an additional 25,000 GPD of flow to Brookwood Farms No other additional flow has been approved during the god quarter of 2023. Sincerely, Chris McCorquoda Town of Siler City Chris McCorquodale Director of Public Utilities PO Box 769.311 N. Second Avenue Siler City, NC 27344-0769 cmccorquodale@silercity.org Phone: 919-742-4732 • Fax: 919-663-3874 www.silercity.org To advance a framework for our success through balanced governance, dynamic partnerships, and an engaged conununiry.