Loading...
HomeMy WebLinkAboutSWA000209_email_20230706 (2) Peck, Kaitlin From:Farkas, Jim J Sent:Thursday, July 6, 2023 2:43 PM To:Scott Roach; David Odom Cc:john@jtburnslaw.com; dcordrey@delawareelevator.com; charlesmeeks@delawareelevator.com Subject:RE: \[External\] RE: SWA000209; 609 Union West Blvd (Union County) Nothing further is needed at this ?me. Once you do make the revisions to the design, you can (but are not required to) provide them to our office to add to the permit file “for our records” only and would not result in any formal review/acknowledgement/approval from our office (since the permit will have been issued at that point and would no longer be “in review”). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Scott Roach <scott@odomengineering.com> Sent: Thursday, July 6, 2023 2:35 PM To: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; David Odom <davidodom@odomengineering.com> Cc: john@jtburnslaw.com; dcordrey@delawareelevator.com; charlesmeeks@delawareelevator.com Subject: \[External\] RE: SWA000209; 609 Union West Blvd (Union County) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jim David Odom & I just reviewed the comments thouroughly and will make the noted correc?ons. At this ?me, please go ahead and issue the ATC and we will have these correc?ons made in 5 to 10 business days and well before final approval. We will be using a SCM permiable surface at the entrance to the site since the change in eleva?ons will not allow us to capture all the BUA surface at the entrance. 1 Let David Odom or I know if you need anything else. Thanks B. SCOTT ROACH, EIT PROJECT MANAGER | ODOM ENGINEERING, PLLC phone: 8282474495, ext 13 mobile: 8282896047 site: www.odomengineering.com email: scott@odomengineering.com address: 169 Oak St, Forest City, NC 28043 From: Farkas, Jim J <Jim.Farkas@deq.nc.gov> Sent: Thursday, July 6, 2023 10:46 AM To: David Odom <davidodom@odomengineering.com> Cc: john@jtburnslaw.com; dcordrey@delawareelevator.com; charlesmeeks@delawareelevator.com; Scott Roach <scott@odomengineering.com> Subject: RE: SWA000209; 609 Union West Blvd (Union County) Following up on this as I have not yet heard back from you with regard to this project. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Farkas, Jim J Sent: Thursday, June 29, 2023 4:23 PM To: David Odom <davidodom@odomengineering.com> Cc: john@jtburnslaw.com; dcordrey@delawareelevator.com; charlesmeeks@delawareelevator.com; Scott Roach <scott@odomengineering.com> Subject: RE: SWA000209; 609 Union West Blvd (Union County) David, 2 We reviewed the items submi?ed on 6/9/23 and there are no issues that would prevent us from issuing the Fast-Track ATC permit for this site, however, there are some issues with the design as proposed. The Fast-Track ATC review is not an in-depth technical review of the stormwater controls for the site, it is more of an administra?ve review of the project/a review to see if the project has the poten?al to meet the design requirements/rules. The SCM design and drainage area delinea?on are not required submission items at this point in the Fast-Track submi?al process so issues with the SCM design or drainage area delinea?on do not prevent a project from ge?ng Fast-Track ATC approval, but if the SCM design and drainage area delinea?on are provided at this point in the review, we look at them to see if the design appears to meet the rules and MDC. Based on a precursory look at the design the following issues may arise with the design:  There are a number of inconsistencies in the submi?al items (for example, the permanent pool eleva?on is listed as both 682.5’ & 683.0’ on the plans, 683.0’ on the Supplement-EZ Form, and the drawdown orifice is shown to have an invert of 680.1’. Another example would be the BUA not adding up properly; 28,126 sf of parking BUA + 1,379 sf of sidewalk BUA + 12,000 sf of roof BUA = 41,505 sf ≠ 45,302 sf as shown. Etc…).  The project does not appear to meet the requirement of Runoff Treatment (15A NCAC 02H .1002(43)). In order for a project to meet Runoff Treatment, the net increase in BUA must be captured and treated in one or more primary SCMs. If it is not prac?cable to capture and treat all of the required BUA, the bypassed areas can be permi?ed as a low-density area (provided that the bypass area meets the low-density requirements). Occasionally, there are situa?ons where it is not prac?cable to capture all of the required BUA in an SCM and it is not possible to permit the bypass areas as a low-density area, however these situa?ons require a variance/waiver which is not allowed for projects permi?ed through the Fast-Track program (per 15A NCAC 02H .1043(1)(a)).  Wet Pond MDCs 1 & 2 – The main pool is separate from and does not include the forebay. Please ensure that the forebay is not included the determina?on of these MDC. NOTE: Per the provided stage storage table, the cumula?ve storage volume at the permanent pool surface eleva?on is 8,593.5 cf whereas it is shown in the Supplement-EZ Form as 10,681 cf. NOTE: The sediment storage zone does not contribute to the volume of either the main pool or the forebay. NOTE: It is recommended to include a stage storage table for the permanent main pool, the permanent forebay, and the temporary storage so that the MDC may be evaluated.  Wet Pond MDC 5a – Per the Supplement-EZ Form, the forebay volume is shown as 1,602 cf and the main pool volume is shown as 10,681 cf (1,602 cf / 10,681 cf = 14.99% < 15%, please also refer to the note above with regard to excluding the forebay from the main pool).  Wet Pond MDC 6 – The loca?on and slope of the vegetated shelf are unclear. The cross-sec?onal view of the pond indicates 10’ wide and 10:1 slopes whereas the grading plan shows 6’ wide and a flat slope (contours for the top and bo?om are both shown to be 683).  Wet Pond MDC 7 & General MDC 1 – As men?oned earlier, the drawdown orifice appears to have an invert below that of the permanent pool surface eleva?on. There is also a bypass weir with an invert eleva?on of 681.81’ which is below the permanent pool. NOTE: The invert of the bypass device (in this case, weir) sets the eleva?on of the temporary pool and the temporary pool must store at least the minimum required treatment volume.  Wet Pond MDC 11 – You will need to provide a plan?ng plan for the SCM.  General MDCs 8 & 9 – Please note that you will need to include a maintenance access & easement for the SCM. Please let me know by close of business 7/7/23 if you would like to modify the design (and have me look it over again for apparent issues with the design) prior to us issuing the Fast-Track ATC or if you would just like us to issue the ATC (and fix the design some?me between now and Final Approval). NOTE: The project will need to comply with the rules/regula?ons before the Final Approval (part 2 of the Fast-Track permi?ng process) is issued for the site and before the E&SC permit is closed out. Jim Farkas State Stormwater Engineer 3 North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Tuesday, June 13, 2023 8:58 AM To: charlesmeeks@delawareelevator.com; dcordrey@delawareelevator.com; john@jtburnslaw.com; David Odom <davidodom@odomengineering.com>; Scott Roach <scott@odomengineering.com> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: SWA000209; 609 Union West Blvd (Union County) Good Morning, We received your post-construc?on stormwater Authoriza?on to Construc?on (ATC) permit applica?on for the subject project on 6/9/2023. Reviews under the Fast Track permi?ng process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000209 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at jim.farkas@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist 4 North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 5