Loading...
HomeMy WebLinkAbout[External] Initial Credit Release / NCDMS Crane Mitigation Site/ SAW-2020-01401/ Lee CountyBaker, Caroline D From: Isenhour, Kimberly T CIV USARMY CESAW (USA) < Kim berly.T.Isenhour@usace.army.mil> Sent: Monday, July 31, 2023 2:05 PM To: Dow, Jeremiah J Cc: Grant Lewis (glewis@axiomenvironmental.org); Alex Baldwin; Tugwell, Todd J CIV USARMY CESAW (USA); Haywood, Casey M CIV USARMY CESAW (USA); Davis, Erin B CIV USARMY CESAW (USA); travis.wilson@ncwildlife.org; Bowers, Todd; Matthews, Kathryn (kathryn_matthews@fws.gov); Polizzi, Maria; Merritt, Katie; Haupt, Mac; Dunnigan, Emily; Harmon, Beth; Stanfill, Jim Subject: [External] Initial Credit Release / NCDMS Crane Mitigation Site/ SAW-2020-01401/ Lee County Attachments: Crane_100165_CF 04_STR_RW_Initial Release KI.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Jeremiah, The 15-Day As-Built/MYO review for the Crane Mitigation Site (SAW-2020-01401) ended July 8, 2023. This review was done in accordance with Section 332.8(o)(9) of the 2008 Mitigation Rule. All comments received from the NCIRT are incorporated in the email below. Please address IRT concerns in the MY1 Report. There were no objections to issuing the initial (30% ) credit release of 1,059.900 warm SMUs and 4.377 riparian WMUs. Please find attached the current signed ledger. The IRT is not requesting a site visit at this time. Kim Isenhour. USACE: 1. Next year, please add random vegetation plots to the wetland rehabilitation wetland near groundwater gauge 11, and to the wetland enhancement area that lies between UT2 and UT4. 2. Just to confirm, there were no deviations from the original engineering plans during as -built? (Besides the noted vane arm that was not constructed on UT1 (Sheet C5.02).) 3. Plan Sheet C5.09: Is groundwater gauge 7 next to UT3 in a wetland credited area? The design sheet is unclear. 4. Photo 1 on the crossing of UT1: I assume the vegetation in the streambed is temporary cover? 5. Photo 2 of the crossing: There appears to be excessive armoring of the channel, more than is necessary to retain the appropriate channel dimensions. 6. 1 know it's likely too late on this one, but the bridge crossing should have been internal to the easement. Spanning structures will require more maintenance over time. Wooden decking material will need to be replaced and the flat edge of the bridge "girder" can be susceptible to trapping debris or causing hydraulic issues during high flows. 7. Let's keep an eye on veg plot 9 for species dominance. 8. In addition to photo points of the ditch above UT3, please label this on the CCPV. Please reach out with questions. Regards, Kim Kim Isenhour Mitigation Project Manager US Army Corps of Engineers I Wilmington District I Regulatory Division 3331 Heritage Trade Dr., Suite 105 1 Wake Forest, NC 27587 1 919.946.5107 From: Haywood, Casey M CIV USARMY CESAW (USA)<Casey.M.Haywood@usace.army.mil> Sent: Friday, June 23, 2023 2:40 PM To: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.lsenhour@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Matthews, Kathryn (kathryn_matthews@fws.gov) <kathryn_matthews@fws.gov>; fritz.rohde@noaa.gov; Twyla Cheatwood <twyla.cheatwood@noaa.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Cc: Dow, Jeremiah J <jeremiah.dow@deq.nc.gov>; Holz, Raymond <Raymond.Holz@davey.com>; Harrell, Matthew <Matthew. Harrell @davey.com> Subject: Notice of As -Built Review/ NCDMS Crane Mitigation Site/ SAW-2019-00833/ Lee County Good afternoon IRT, The below referenced FINAL As-Built/Record Drawing review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. Please note, if a site visit is requested by the IRT, comments will be due 15-days following the visit. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: June 28, 2023 15-Day Comment Deadline: July 08, 2023 45-Day Credit Release Approval Deadline: August 07, 2023 2023 is Monitoring Year 1 for this project. Protect Information Name: USACE ID: DWR ID: DMS Project #: RFP: Institution: River Basin: Crane SAW-2020-01401 20201292 100165 16-20190302—Issued 12/20/2019 07/30/2020—Full Delivery Cape Fear 03030004 County: Lee Mitigation Plan Assets: 3,533.000 Warm SMUs and 14.593 WMUs Provider: Restoration Systems, LLC, Ray Holz, 919-604-9314 DMS PM: Jeremiah Dow, 919-218-0226 USACE POCs: USACE Bank Manager: Kim Isenhour Kimberly.T.Isenhour@usace.usace.gov (919) 946-5107 USACE Mitigation Specialist: Erin Davis Erin.B.Davis@usace.army.mil (919) 930-1887 Please note: Construction was completed in July 2022 and planting was completed in February 2023. The as -built stream length is 40 feet less than the centerline design length. No change in project credits is requested. FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the RIBITS website & DMS SharePoint site here: RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:16209962984152:::RP,278:P278 BANK ID:5779 IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG