DRAINAGE AREAS
.............................................................................................................................................................................................................................................................................
1
Is this a hi h densi roject?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this have low density areas
No
4
„pro)ect
If so number of low density drainage areas
0
Is all/part of this project subject to previous rule
5
versions?
No
FaEn5LgAP.Fp.
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
269,201
202,525
6
Onsite drainage area (sq ft
269,201
202,525
7
Offsite draina a areas ft
0
0
8
Total BUA in roject (sq ft
170952 sf
170952 sf
New BUA on subdivided lots (subject to
9
permitting) (sq ft)
n/a
n/a,,,..
New BUA not on subdivided lots (subject to
10
permitting) (sf)
170952 sf
170952 sf
11
Offsite BUA (sq ft)
12
Breakdown of new BUA not on subdivided lots:
Parking„ (sq ft)
65074 sf
65074 sf
Sidewalk (sq ft)
925 sf
925 sf
Roof (sq ft)
104953 sf
104953 sf
Roadway (sq ft)
Future..(sq ft)
Other, please specify in the comment box
below (sq ft
New infiltrating permeable pavement on
13
subdivided lots (sq ft)
New infiltrating permeable pavement not on
14
subdivided lots (sq ft
Existing BUA that will remain (not subject to
15
permitting) (sq ft)
16
Existing BUA that is already„permitted (sq ft)
17
Existing BUA that will be removed (sq ft)
13016 sf„
13016 sf
18
Percent BUA
19
Design storm (inches)
1.0 in
20
Design volume of SCM (cu ft)
21695 cf
21
Calculation method for design volume
Simple Method
ADDITIONAL INFORMATION
�Please use this space to provide any additional information about the
22
drainage a rea(s)
Drainage
area for pre -post development analysis is the drainage area to the
proposed wet pond. The existing drainage patterns do not change with
respect to the site drainage outfall (lowest point on property). All new
impervious will drain to wetpond; remaining area on property that does not
d"resin
to Mdet nend mM&I Mm ain nendO W 1............................................................................................................................................................................................................................................................
WET POND
1
Drainage area number
1
2
Minimum required treatment volume �cu ft�
13651 cf
GENERAL MDC FROM 0211.1050
O50
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
..........................................................................................................................................................................................................................................................................................................................
4
Is the SCM located away from contaminated soils?
Yes
..........................................................................................................................................................................................................................................................................................................................
5
What are the side slopes of the SCM (H:V)?
3:1
..........................................................................................................................................................................................................................................................................................................................
6
Does the SCM have retaining walls, gabion walls or other
No
engineered side slopes?
7
Are the inlets, outlets, and receiving stream protected from erosion
Yes
10- ear storm)?
8
Is there an overflow or bypass for inflow volume in excess of the
Yes
design volume?
9
..........................................................................................................................................................................................................................................................................................................................
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
..........................................................................................................................................................................................................................................................................................................................
12
Does the drainage easement comply with General MDC (9)?
Yes
..........................................................................................................................................................................................................................................................................................................................
13
If the SCM is on a single family lot, does (will?) the plat comply with
N/A
General MDC 10 ?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12) .
Yes
16
Does the SCM follow the device specific MDC.
Yes
17
Was the SCM desi ned b an NC licensed rofessional .
9 R
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
183.00
removal) (fmsl)
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
185.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
191.00
23
Elevation of the permanent pool (fmsl)
192.00
24
Elevation of the top of the vegetated shelf (fmsl)
193.00
25
Elevation of the temporary pool (fmsl)
193.70
26
Surface area of the main permanent pool (square feet)
7810
27
Volume of the main permanent pool (cubic feet)
21695 cf
28
Average depth of the main pool (feet)
4.00 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
560.1 ft
31
If using equation 3, width of submerged veg. shelf (feet)
6.0 ft
32
Volume of the forebay (cubic feet)
3987 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
54 in
35
Design volume of SCM (cu ft)
21695 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2.0 in
38
....If weir, weir height(inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3.18
41
Are the inlet(s) and outlet located in a manner that avoids short-
Yes
circuiting?
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
12 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
12 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
Yes
permanent pool?
49
Does the pond minimize impacts to the receiving channel from the 1-
Yes
yr, 24-hr storm?
50
Are fountains proposed? (If Y, please provide documentation that
No
MDC(?) is met)
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermudagrass
54
Has a Rlantm flan been provided for the vegetated shelf
Yes
ADDITIONAL INFORMATION
Please use this s ace to rovde an additional information about
p p Y
55 the wet pond(s):
Berm is used to direct inflow to shallow end of forebay, away from outlet.