HomeMy WebLinkAboutNCC232270_ESC Approval Submitted_20230731 d# 4 I11 �: ;It ROY COOPER V yCwesnor iELIZABETH S.BISER v IL � - sec story �°"""/' DOUGLASR.ANSEL NORTH July 17, 2023 LETTER OF APPROVAL C4 Development, LLC Attention: Bary James, Partner 801 Eastland Boulevard Charlotte,North Carolina 28203 RE: Project Name: Eastland Off-Site Improvement(Ownership Change only) Project ID: MECKL-2022-026 Acres Approved: 5.07 County: Mecklenburg City: Charlotte Location: Central Avenue River Basin: Catawba Stream Classification: Other Submitted By: Land Design Date Received by LQS: July 12, 2023 Plan Type: Revised Dear Mr. James: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.go\/NCG0l. Please direct questions about the eNOI form to the Storimk ater Program staff the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: _E North Carolina Department of Environmental Quality Division of Energy.Mineral and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville.North Carolina 28115 � � /b/ 704.663.169g Letter of Approval C4 Development, LLC July 17, 2023 Page 2 of 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Zaii,4,6. Zahid S. Khan, CPM, CPESC, CPWSQ Regional Engineer Land Quality Section Enclosure: Certificate of Approval NCGOI Fact Sheet c: Inspection Department ec: Land Design Attention: Danny Bishop, PE dbishop a landdesiyn.com