HomeMy WebLinkAbout20210955 Ver 2_Modifications_20230728Staff Review
Does this application have all the attachments needed to accept it into the review process?*
Yes No
ID#* Version* 2
20210955
Is this project a public transportation project?* Yes
No
Is this a DOT Yes No
project? *
Reviewer List: * Garcy Ward:garcy.ward
Select Reviewing Office: * Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?
Yes
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Pre -Filing Meeting Date Request was submitted on:
12/22/2021
Project Contact Information
Name: Chris Rivenbark
Who is submitting the information?
Email Address: crivenbark@rkk.com
Project Information
Existing ID #:
20210955
20170001(no dashes)
Existing Version:
1
1
Project Name: Bridge No. 38 over the Tar River on US 13
Is this a public transportation project?
Yes
No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
Is this project connected with ARPA funding?
Yes No
TIP#: WBS#:
B-4786 38222.1. FR2
(Applies to DOT projects only)
County (ies)
Pitt
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
B-4786 General Modification Pitt July 28 2023.pdf 4.03MB
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
SAW-2018-01119
A permit modification is being requested to allow for a different arrangement of temporary work bridge fingers.
The contractor will construct a temporary work bridge finger in a span that previously did not have one as well
as a single work bridge finger instead of a combined structure in the adjacent span. The change is needed due
to the limited reach capability for drilling as well as pipe piles in close proximity to each other and existing bent
columns. This revision will not result in any additional impacts to jurisdictional resources.
Sign and Submit
By checking the box and signing box below, I certify that
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
&laid RuWXA
Submittal Date: 7/28/2023
Is filled in automatically.