HomeMy WebLinkAboutNC0045292_Graham_Mebane_WTP_CEI_Letter_20230718ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
City of Graham
Attn: Frankie Maness
P.O. Drawer 357
Graham, NC 27253-0357
NORTH CAROLINA
Environmental Quality
July 18, 2023
SUBJECT: Compliance Evaluation Inspection
Graham/Mebane Water Treatment Plant
NPDES Permit #: NCO045292
Alamance County
Dear Mr. Maness:
On June 5th, 2023, Division of Water Resources staff Ron Boone conducted a routine compliance
evaluation inspection at Graham/Mebane Water Treatment Plant, wastewater discharge permit
NCG0045292. ORC Shelby Smith was present during the inspection. A review of records, data,
treatment components, structures, and the outfall was completed. This inspection reflected
compliance with the subject permit.
A review of all records such as laboratory data and reports, the permit, operator's logs, etc. were
reviewed. The plant site was also inspected, including the lagoons themselves and the outfall to
Back Creek. No violations, issues, or items of concern were noted during the inspection.
Please be aware that pursuant to North Carolina general statute (NCGS) 143-215.6A, the Division
may assess civil penalties not to exceed $25,000 per day against any person who fails to fully
comply with the requirements of a permit issued pursuant to NC General Statute (NCGS) 143-
215.1., as is NC0088552.
If you have any questions or concerns, please feel free to contact Mr. Boone at any time by phone
at 336-776-9690, or by email at ron.boone@deq.nc.gov. Thank you for your time and attention
to this matter.
DffNorth Carolina Department of Environmental Quality I Division of Water Resources
oan caaouNn
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
M336.776.9800
oep.m.m or em�nmen� Qualm
Sincerely,
DocuSigned by:
OD2D3CE3F1 B7456...
Jennifer F. Graznak, Assistant Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Attachments:
Water Compliance Inspection Report
REQ� North Carolina Department ofEnvironmental Quality I Division ofWater Resources
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Winston-Salem, North Carolina 27105
NORTH CAROLINA 336.776.9800
naparMeM of EmironmanW 9uallly
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO045292 111 121 23/06/05 I17 18 LC] I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 71 I 74 79 I I I I I I I80
701 I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
01:OOPM 23/06/05
17/07/01
Graham / Mebane WTP
1824 US Hwy 70
Exit Time/Date
Permit Expiration Date
Mebane NC 27302
02:OOPM 23/06/05
22/06/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Tonya Ane' Mann/ORC/336-578-3264/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Victor Ray Quick,PO Drawer 357 Graham NC 272530357H336-570-6700/3365135502
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone Docusigned by: DWR/WSRO WQ/336-776-9690/
o"".& Boone, 7/17/2023
B20F8DD5F2A3460...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DWR/WSRo 336-776-9695 7/19/2023
F 6 Docusigned by:
ev1��9� � Previous editions are obsolete. EPA Form 356-��W
Page#
NPDES yr/mo/day Inspection Type
NCO045292 I11 12I 23/06/05 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On June 5th, 2023, Division of Water Resources staff Ron Boone conducted a routine compliance
inspection at Graham/Mebane Water Treatment Plant, wastewater discharge permit NCG0045292.
ORC Shelby Smith was present during the inspection. A review of records, data, treatment
components, structures, and the outfall was completed. This inspection reflected compliance with the
subject permit.
A review of all records such as laboratory data and reports, the permit, operator's logs, etc, were
reviewed.
The plant site was inspected, including the lagoons themselves and the outfall to Back Creek.
No violations, issues, or items of concern were noted during the inspection.
Please feel free to contact Mr. Boone with any questions or concerns you may have.
Page#
Permit: NCO045292 Owner -Facility: Graham / Mebane WTP
Inspection Date: 06/05/2023 Inspection Type: Compliance Evaluation
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
■
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
❑
❑
operator on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility
❑
❑
❑
classification?
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment: None
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
■
❑
❑
❑
application?
Is the facility as described in the permit?
■
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: None
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑
Page# 3
Permit: NCO045292 Owner -Facility: Graham / Mebane WTP
Inspection Date: 06/05/2023 Inspection Type: Compliance Evaluation
Laboratory Yes No NA NE
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
■
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
0
❑
❑
❑
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
0
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
0
❑
Comment: None
Lagoons
Yes
No
NA
NE
Type of lagoons?
Facultative
# Number of lagoons in operation at time of visit?
2
Are lagoons operated in?
Series
# Is a re -circulation line present?
❑
0
❑
❑
Is lagoon free of excessive floating materials?
0
❑
❑
❑
# Are baffles between ponds or effluent baffles adjustable?
❑
❑
■
❑
Are dike slopes clear of woody vegetation?
■
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
0
❑
❑
❑
Are dikes free of seepage?
0
❑
❑
❑
Are dikes free of erosion?
0
❑
❑
❑
Are dikes free of burrowing animals?
0
❑
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
0
❑
❑
❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
0
❑
Is the lagoon surface free of weeds?
0
❑
❑
❑
Is the lagoon free of short circuiting?
■
❑
❑
❑
Comment: None
Flow Measurement - Effluent
Yes
No
NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
Comment: None
Page# 4
Permit: NCO045292
Inspection Date: 06/05/2023
Owner -Facility: Graham / Mebane WTP
Inspection Type: Compliance Evaluation
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: None
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None
De -chlorination
Type of system ?
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de -chlorination substance stored away from chlorine containers?
Are the tablets the proper size and type?
Comment: None
Are tablet de -chlorinators operational?
Number of tubes in use?
Comment: None
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Comment: None
Yes No NA NE
Liquid
❑ ❑
❑
■
❑
❑
❑
❑
❑
❑
❑ ❑
■
❑
❑ ❑ ■ ❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑
EIN ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
Page# 5