HomeMy WebLinkAbout20230814 Ver 1_More Info Received_20230724CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
"18U L Lune, 9,-XXQ fK-W �)
Project Name/address;
Owners (,A IYACI-Vi
Print
natal
County:
Contractor/agent:
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
1
application is a violation of the Buffer Rule. Site specific work should be provided in the application,
02H .4506 and 15A NCAC 02B .0243(8)]
[15A NCAC
Trees are rot allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation}, unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimc--%I Shaping and sloping along the immediate shoreline is allowed, [15A NCAC 02B 0243(6)]
Benching, grading i n the buffer is not allowed. Excessive disturbance of ground ever. [15A NCAC 0 2 8 .0243 (6) ]
Beaches, i m pervious patios, im pe rviou s
wal kways, etc.
are nab allowed
in the buffer
unless spec+ficaIly approved
by the Division. There are limitation on
size for decks.
[15A NCAC 02B
,4243(4) and
(5)1
Work to be conducted from Rand must indicate an access and indicate any trees that are to be removec. The
work corridor should be described, The approved access corridor shall be restored, Staging, spoill, canstructio-i
material must be outside the buffer. [15A NCAC DOH ,0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the fake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notificotion
00
hereby state that I have been informed of the Catawba
W -V %
R'Iparian Buff4 Rule. Any work conducted in the buffer, not specifically sated in the application and approved
by the Division of `Hater Resources (DWR), is a violation and subject to enforcernent. Due diligence will be
poker; such that the construction will be, built within subs#antisl compliance and intent of ;he4.01 Water
QuaRy certification and Buffer Rules, the approved plan(s) and specifieation(s), and other supporting
materials.
Signature (owner):
Date.
Z,2.-.,o
a