HomeMy WebLinkAbout820229_Routine Inspection_20230725 (2)Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 94outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: % 5 3 3 Arrival Time: < /=` k7 l Departure Time: UU ounty � ` Region: C%2
Farm Name: P R -Cr r7o c r" Owner Email:
Owner Name: Jt% pCzleg'�; Phone:
Mailing Address:
Physical Address: //��
Facility Contact: ( �//!! (,e� i&e,,� Title:
Onsite Representative: f t
Certified Operator: /V,
Back-up Operator:
Location of Farm:
Latitude:
Phone:
Integrator:✓��J��P��T�
Certification Number: L 7 6 �
Certification Number:
Longitude:
§§$§4#§rv##x§-0tli ffid arvd$tbZ+idb:#Caiaz#&44�$#Ra8#AA#A!Aa kMU43Ndh Aba�Gat •na M4a &q%93e44iW # A�v# W$##t£V.da#�#tt�i'#XS Fk}#NF�:.'dij4y4dt
##bik9t bk#b##A .;R SabAsx+Rbha yj��f#£y��#�yy *,5��({µ##£sd#.-0#x#sxs xCrs Ttav rtS }�g�RyRRBi(� yjfiq� 4k.�A#k§9ti$a9W n#o-ti#d+4sx##Pp
9Y4b'4�$N'b'P#
q:�B�p}mod E#t
d§ {33ii#SAS&ffiA'#t}g9k#hRY* A4&$-5�4�YYdk 46 k59 Y#4ti 49a'h si#$##£§i$�R'i3AfV^AP&"m E'aC}`§k :$tR bia'$80*u5*a#�s%§R6Yx
$ffitA#A$b %saa Ai$k4 a#a#$kg#§#ti�*,� 9# 4dy�t3Yv'##x�-,Mm #as-4$h WAY kk61' n§�,«aa-a abhs
34+4� A46Y #b #M'
paci o*
ie#a addgb�ngix'b.a ssbIaa*(aWaCti'*-0$0�1i i$..*R.#iayy et+p<plltLr'b#k alybtaelya+a Ai:#-ta as maa al-aYCI*Casa
W+,k§A�tak'ki s * a¢§e#�, a$sx�s#a tipt aaa4 Wa#V R§#fAE :&ka$i}4F#s9#=siz?#d�*.3 ada#,�
ma.O.a..A.b
Yk#%wttR q$9* a t±��a
K
Wean to Finish y Layer Dairy Cow
$f
Wean to Feeder
Non -Layer Dairy Calf.
airy Heifer
# sb#:�sxaadea#fiib
i
r� Feeder to Finish
97U0
Farrow to Wean
R# *ka#b0i mffi� t D Cow
Ma4
i##*
# ab
to Feeder
N-Farrow
qtt, Dai
•g_ Farrow to Finish
•
Layers
a Beef Stocker.
Gilts
INon-Layers
I
9t. Beef Feeder
ii Boars
Pullets
#; Beef Brood Cow
$9##JYY#$b4F§#d.YW&.NYffi#77Yk+£Ptnm kY.Yfi MN6A k4A$%
4b'�$tbyka(yyHyyiyyR},kggT§+4a 646fi t$#3k?'34YkkbY§5$846d94#
axa w•sa4n-0bR #t ue asp ARF#hbSkk Nda44
=9#xb'k#f-f
Turke $
3e 4kdY.#G tY 3a $@
hb•"t#b##5#,## %b+'aa"a:d3#h A'#bb**###4##k#li4 kk'#i$
#$±4 bK : i$####Cil+t#tt#+t xrw v�q afl �5kaq 3fr. Sii9a$W m D9q
3$ ffiC MY'kk#Yd th W*We#i€ek #Ba x Bx R¥,e:i Y«*a
Y'l�4
Turke Poults
i.idAw4d'k*ik44'a YB.ar'14#nAMk II"x'#R&tY#$4d}$fi �6Mi
•)a-saswaig#s#.aa�*#ari*s#sas�e#�e>a§sqq¢gA��«#
#4i$d3baii$##Y#Yia a%µ£iulb'b#65$#d#q#�$$
d54 S8n+kP igaa #,§w R trw $kkk$§d&Win 11,16f%t
tk�
ti
b*
Rai
&48
Other
b#8# m a-0 %x'+.. ..89m*q3a w
„45
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes ,EE�No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes ❑ No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes ❑ No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes ❑ No
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes _4�1"No
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes `rNo
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes -No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes, ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: _� 2
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
l-�l 19
2/ a.S__
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes No ❑ NA ❑ NE
❑ Yes M No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes .T No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes _E� No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes 2NIo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Q-No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): _aZE ,( Cam; Pit) L�fi- 5W
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ Yes No
❑ NA
❑ NE
❑ Yesj2rNo
❑ NA
❑ NE
❑ Yes--ffNo
❑ NA
❑ NE
❑ Yes0-1Io
❑ Yes _eNo
❑ Yes _] No
[:]Yes J:]-�o
❑NA ❑NE
❑NA ❑NE
❑NA ❑NE
❑ NA ❑ NE
❑ WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 'J[2'IVVo ❑ NA ❑ NE
Page 2 of 511212020 Continued
Facility Number: Date of Inspection: j
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0'No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes L3 No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EfrNo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Z/ No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes ❑'No
❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes ,Ef�No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes E jNo
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ZNo
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes -fn'No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes ..E]—No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes EfrNo
❑ NA
❑ NE
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
9,2- ��/ rv-r,� ad
Phone: fj91d Wig/_'97 _
Date:
Page 3 of 3 511212020
�Y as -
FACILITY#: ��— " ' FARM NAME: J LAGOON LEVEL
PERMITW9)
- DUE EVERY 5 YEARS
- EXPERIATION DATE _
- CURRENT NUMBER OF
- OIC CARD YES OR NO
NUMBER OF ANIMALS
/I WASTE UTILIZATION PLAN (WUP) (#20)
SOILTYPES
CROP TYPES Fe-/ w19-51�
- ODOR CONTROL CHECKLIST YES OR NO
- Irrigation Plan Maps YES OR NO
WASTE REPORT (s2+)
-GOOD FOR 60 DAYS BEFORE OR AFTER
DATE 3la'� 6-3 NITROGEN LEVEL
DATE '//(o 1a-3 NITROGEN LEVEL l�GJ
e
DATE `6,o �-)- NITROGEN LEVEL 7
SOIL REPORT (tai)
- EVERY 3 YEARS: DATE
- P-1 (NO MORE THEN 400)
- PH (Nate tr4o, ie.) g
- Cu/ZN (NO MORE THEN k00) CU ZN
(IF PEANUTS NO MORE THEN 300)
IRR2 (#2-I)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
CALBRIATION (#sa)
EACH REEL SHOULD BE C LIRAjED EVERY OTHER YEAR
DATE OF CALIBRATION iU-
FLOW RATES
RAIN FALL Ili)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED.
/� SLUDGE (#21 &25)
-DUE EVERY YEAR: DATE
0:. �P: 3 i % RATIO OF SLUDGE �� ,
0: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
OTHER FORMS (A22 AND 921)
RAIN BREAKER FORM CROP YEILDS MORTALITY_
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS _ PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT
CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE
Bermuda grass: Opens March 1st- Ends September 30t
Small Grain Over seed: Opens October 1n-Ends March 31st
Corn: Opens February 15t - Ends June 30t
Cotton: Opens March 15t - Ends August 1st
Rye: Opens September 1�- Ends March 31st
Oats: Opens September 1°t-Ends April 15t
Wheat: Opens September 1st- Ends April 30t
Soybeans: Opens April 1st -Ends September 15w
Fescue: Opens August 1st- Ends July 31 A
Sorghum Hay: Opens March 15t - Ends August 31 st