HomeMy WebLinkAboutNCC231864_Modification Confirmation Email_20230728Georgoulias, Bethany
From:
lase rfiche.ncdenr.gov@mccicloud.io
Sent:
Friday, July 28, 2023 10:00 AM
To:
zach.huett@duke-energy.com
Cc:
Georgoulias, Bethany; zach.huett@duke-energy.com; lisa.echols@duke-energy.com;
covil@mcadamsco.com
Subject:
[External] Modification Confirmation
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This e-mail is to notify you that the modification information for COC No. NCC231864 for the project Duke Energy
Progress Holly Springs Operations Center that you submitted on 7/26/2023 has been added to the permit file records
as of 7/28/2023.
Modification Reason: Other Revision(s) to E&SC Plan
Additional Details (if provided):
You can find all Construction COC Permit files in our Document Repository here.
Questions? Please contact The NC Stormwater Program at (919) 707-3640.
Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future a -mails about this application from
going into Spam filters.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.