HomeMy WebLinkAbout090014_routine_202307260 Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 090014 Facility Status: Active Permit: AWS090014 ❑ Denied Access
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine County: Bladen Region: Fayetteville
Date of Visit: 07/26/2023 Entry Time: 09:15 am Exit Time: 3:00 pm Incident #:
Farm Name: Eason Swine Farm Owner Email: kendrickeason79@gmail.com
Owner: Eason Swine Farms LLC Phone: 910-874-4172
Mailing Address: 69 Doe Crossing Elizabethtown NC 28337
Physical Address: 615 Culbreth-Smith Rd Elizabethtown NC 28337
Facility Status: 0 Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC
Location of Farm: Latitude: 34' 46' 01" Longitude: 78' 35' 24"
SR 1507 1/4 mile South of intersection with SR 1506 and 2 miles South of Ammon.
Question Areas:
Dischrge & Stream Impacts
Waste Col, Stor, & Treat
Waste Application
Records and Documents
Other Issues
Certified Operator: Jeremy Kendrick Eason
Operator Certification Number: 985736
Secondary OIC(s):
On -Site Representative(s):
Name Title
Phone
24 hour contact name
Curtis Barwick
On -site representative
Curtis Barwick
Primary Inspector: Katie
Fontenot
Phone:
Inspector Signature:
Date:
Secondary Inspector(s):
Inspection Summary:
7. Mow around lagoon, get trees off lagoon asap. mow to the toe of lagoon. 60 days to start cleaning lagoon up
Page 1 of 5
Permit: AWS09001z Owner: Eason Swine Farms LLC Facility Number:090014
Inspection Date:07/26/23 Inspection TypeCompliance Inspection Reason for Visit:Routine
Regulated Operations
Swine
Design Capacity Current promotions
Swine - Feeder to Finish 6,840 I 6,840
Total Design Capacity: 6,840
Total SSLW: 923,400
Waste Structures
Effective
Built Closed
Designated
Observed
Type
Identifier Date
Date Date
Freeboard
Freeboard
Lagoon
1
03/14/2005
112/08/1993
20.00
27.00
Page 2 of 5
Permit: AWS09001� Owner: Eason Swine Farms LLC Facility Number:090014
Inspection Date:07/26/23 Inspection TypeCompliance Inspection Reason for Visit:Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
MEIEI
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
0 ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
0 ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
0 ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
0
❑ ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
MEI
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
0
❑ ❑
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Page 3 of 5
Permit: AWS09001� Owner: Eason Swine Farms LLC Facility Number:090014
Inspection Date:07/26/23 Inspection TypeCompliance Inspection Reason for Visit:Routine
Waste Application
Yes No NA NE
Crop Type 1
Coastal Bermuda Grass w/
Rye Overseed
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Kenansville sand, 0 to 3%
slopes
Soil Type 2
Centenary sand
Soil Type 3
Foreston loamy sand
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
❑
0 ❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
0 ❑
❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑
❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
0 ❑
❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Page 4 of 5
Permit: AWS09001� Owner: Eason Swine Farms LLC Facility Number:090014
Inspection Date:07/26/23 Inspection TypeCompliance Inspection Reason for Visit:Routine
Records and Documents
Stocking?
Crop yields?
120 Minute inspections?
Monthly and 1" Rainfall Inspections
Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check th
appropriate box(es) below:
Failure to complete annual sludge survey
Failure to develop a POA for sludge levels
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
f14her 1-1—
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
If yes, check the appropriate box below.
Application Field
Lagoon / Storage Pond
Other
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
34. Does the facility require a follow-up visit by same agency?
Yes No NA NE
EJ
El
2023 61
%
❑■❑❑
❑■❑❑
W__
K1_ \IA
I.IC
❑ ■ ❑ ❑
❑■❑❑
❑■❑❑
❑■❑❑
❑■❑❑
■❑❑❑
Page 5 of 5