HomeMy WebLinkAbout820025_Application_20230728July 27, 2023 Christine Lawson NCDEQ Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 Subject: Pork Plus Facility # AWS820025 State Digester General Permit Dear Ms. Lawson, C AVA N A U G H Stewaia,_t,p ,i,, s,6- ,_;,ovation Cavanaugh & Associates, P.A., on behalf of the farm owner, hereby submits the following application to NCDEQ Division of Water Resources for review of the State Digester General Permit application package for Pork Plus. The subject project is located in Sampson County, North Carolina. To facilitate your review of the enclosed documentation, the following is an itemized breakdown: 1. One (1) original 'State Digester General Permit Application' application form. 2. One (1) copy of the engineering calculations. 3. One (1) copy of a detailed narrative of the Swine Digester Animal Waste Management System. 4. One (1) copy of the FEMA FIRM map labeled with the 'Proposed Digester Site'. 5. One (1) copy of the permit form Section 3.6 components. 6. One (1) full-size set of the engineering plans, as well as one (1) 11"x17" set. The applicable setbacks (per the 'Swine Farm Siting Act' and 15A NCAC 02T) for the proposed digester are shown on sheet C.2.5.3 of the engineering plans, which indicates that the digester will be: 1. Greater than 100' from all wetlands / perennial streams / perennial waterbodies (per 15A NCAC 02T .1304(b)(11)). 2. Greater than 2,500' from all schools, hospitals, churches, outdoor recreational facilities, national parks, State Parks, and child care centers. 3. Greater than 1,500' from all occupied residences. 4. Regarding the setback from property boundaries, there are two properties within 500' of the proposed digester that are also closer than the existing swine houses and lagoons, so the farm owner will obtain setback waivers from those property owners (as indicated on sheet C.2.5.3). Influent sampling will be accomplished via sampling from the influent lift station or gravity main conveying flushed manure to the digester, where applicable. Effluent sampling will be accomplished via sampling from the level control wet well. Regarding usage of the biogas, the applicant plans to utilize the biogas produced from the facility to generate a renewable energy resource for export off the farm. Specific details of how the applicant plans to do this are not yet released, but the applicant plans to begin export of the renewable energy resource within 12 months of commencing construction. Cavanaugh & Associates, P.A. PO Box 11197 Winston-Salem, NC 27116, 1-877-557-8923, www.covanaughsolutions.com Regarding estimate of daily volume of biogas, the daily volume of biogas varies based on animal stocking numbers, animal age, and climatic variations. A gross estimate that is commonly used for in -ground, ambient temperature digesters is about 2 cubic feet of biogas per pig occupant in the farm per day; however, the actual amount of biogas produced by the farm may vary significantly given the considerations described above. Regarding emergency flare, an emergency flare will not be provided for the proposed farm. Rather, should the applicant need to dispose of excess biogas, the system operator will open one or more emergency vent ports to be installed as part of the HDPE digester cover system, and release the biogas. Please do not hesitate to contact our office should you have any questions, comments, or require any additional information. Regards, Cavanaugh & Associates, P.A. Il Jeff P. Cappadona, P.E. Attachments cc: Farm Owner State of North Carolina Department of Environmental Quality Division of Water Resources Animal Feeding Operations Permit Application Form (THIS FORM MAYBE PHOTOCOPIED FOR USE AS AN ORIGINAL) State Digester General Permit — Farm Digester System 1. GENERAL INFORMATION: 1.1 Facility name: Pork Plus 1.2 Print Owner's name: Faison Investments LLC 1.3 Mailing address: PO Box 1015 City, State: Clinton, NC Zip: 28329 Telephone (include area code): (910) 260-0220 Fax: O - Email: 1.4 Physical address: 915 Bill Williams Rd. City, State: Turkey, NC Zip: 28393 Telephone number (include area code): ( ) - Latitude 34.9624' Longitude-78.176719' (Decimal Degrees from Google Earth) 1.5 County where facility is located: Sampson 1.6 Facility location (directions from nearest major highway, using SR numbers for state roads): From Exit 364 on I-40, head west on NC-24 W for 1.0 miles, turn left onto Carrolls Rd. and go 0.4 miles, turn right onto Blanchard Rd. and go 0.2 miles, continue onto Cornwallis Rd. and go 1.6 miles, turn right onto Wilmington Rd. and go 0.7 miles, turn left onto bill Williams Rd. and go 0.8 miles, the farm entrance is on the rim 1.7 Farm Manager's name (if different from Landowner): 1.8 Lessee's / Integrator's name (if applicable; circle which type is listed): Smithfield Foods 1.9 Facility's original start-up date: Date(s) of facility expansion(s) (if applicable): 1.10 Design Contact name: Jeff Cappadona Phone (1-877) 557-8923 Email: jeffrgy.cappadona(&cavanaughsolutions.com 2. OPERATION INFORMATION: 2.1 Facility number: AWS820025 2.2 Operation Description: Please enter the Design Capacity of the system. The "No. of Animals" should be the maximum number for which the current swine waste management system is permitted. Tyne of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals ❑ Wean to Feeder ❑ Layer ❑ Beef Brood Cow ® Feeder to Finish 4,200 ❑ Non -Layer ❑ Beef Feeder ❑ Farrow to Wean (# sow) ❑ Turkey ❑ Beef Stocker Calf ❑ Farrow to Feeder (# sow) ❑ Farrow to Finish (# sow) ❑ Wean to Finish (# sow) ❑ Gilts ❑ Boar/Stud ❑ Turkey Poults ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Milk Cow FORM: AWO-STATE-G-DIGESTER-7/07/2022 Page 1 of 6 ❑ Other Type of Livestock on the farm: No. of Animals: 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): See attached Waste Utilization Plan Acres Required Acreage (as listed in the CAWMP): See attached Waste Utilization Plan Acres Existing Application Area (pre -construction): See attached Waste Utilization Plan Acres Proposed Application Area (post -construction): Same as existing (see new Waste Utilization Plan) Acres Is there a change to the existing WUP? YES or NO (circle one) Is the Existing WUP attached? YES or NO (circle one) Is the New (if applicable) WUP attached? YES or NO (circle one) 2.4 List and Describe all Storage/Treatment Structures Below: a. DIGESTER or other PRIMARY TREATMENT: (double click on "Select" for drop -down menu box) Treatment Existing? Name of Treatment Type of Liner Surface Type of Cover Ttl Capacity Req'd Capacity Unit Type YP (Y/N) Unit Material Area Material (cu. Ft.) (cu.ft.) Digester N Digester Synthetic 25,975 Synthetic (80 mil) 148,972 148,972 Select Select Select Select Select Select a.l Are engineering designs, drawings, specifications, and details attached? YES or NO (circle one) b. SECONDARY TREATMENT/STORAGE: (double click on "Select" for drop -down menu box) Name of Storage Unit Existing? (Y/N) Type of Liner Material Surface Area Ttl Capacity (cu. Ft.) Req'd Capacity (cu.ft.) Lagoon Y Soil in situ 89,497 756,494 591,674 Select Select Select *Note: The "Total Capacity" and "Req'd Capacity" is given per the existing lagoon calculations for this farm, provided by the farm owner and dated 2009-3-5. 2.5 Are KNOWN subsurface drains present within 100' of any application fields? 2.6 Are KNOWN subsurface drains in the vicinity or under the waste management system? 2.7 Does this facility meet all applicable siting requirements? YES or NO (circle one) YES or NO (circle one) YES or NO (circle one) Note: This item has not been marked "Yes" or "No" since this farm requires setback waivers due to the location of the proposed digester (refer to `Setbacks' plan sheet C.2.5.3 attached with this application), and setback waivers are being pursued by the farm owner. 2.8 Describe Water Movement between Barns, Digesters, and Storage Ponds (double click on "Select" for drop -down menu box) Pump Station or Minimum Pump Plan Sheet Location Gravity Pipe Size Capacity Reference GPM TDH Barns to Digester Pump Station (ILS) 8" 56 20 C.2.5.1 t Digester to Secondary Gravity 12" C.2.5.1 FORM: AWO-STATE-G-DIGESTER-7/07/2022 Page 2 of 6 3. Select Select REQUIRED ITEMS CHECKLIST: Please indicate that you have included the following required items by signing your initials in the space provided next to each item. A lica 's laitials 3.1 One completed and signed original of the application for Digester Animal Waste Management System Application Form. 3.2 A general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied and a county road map with the location of the facility indicated. 3.3 Documentation that new digester structure(s) meets the Swine Farm Siting Act, for swine operations. ' V 3.3.1 Site Map. The scale of this map shall not exceed 1 inch = 400 feet. 3.3.2 All proposed digesters to occupied residences > 1500 feet OR no closer than existing setback. Existing setback = > 1,500 feet 3.3.3 All proposed digesters to schools, hospitals, churches, outdoor recreational facilities, national parks, state parks, historic properties, or childcare centers > 2500 feet OR no closer than existing setback. Existing setback = > 2,500 feet 3.3.4 All proposed digesters to property boundaries > 500 feet OR no closer than existing setback. Existing setback = 97 feet Note: This item has not been initialed since this farm requires property boundary setback waivers due to the location of the proposed digester (refer to `Setbacks' plan sheet C.2.5.3 attached with this application), and setback waivers are being pursued by the farm owner. 3.3.5 All proposed digesters to Public Water supply wells > 500 feet. 3.3.6 The map shall show the location of any property boundaries and perennial streams, or rivers located within 75 feet of waste application areas. 3.4 One copy of all engineering documents, including, but not limited to, calculations, equipment specifications, plan and profile drawings to scale, construction materials, supporting equations or justifications. 3.5 A detailed narrative of the Farm Digester Animal Waste Management System. 3.6 A copy of the CAWMP which must include the following components. Some of these components may not have been required at the time the facility was initially certified but must be added to the CAWMP for permitting purposes: 3.6.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility 3.6.2 The method by which waste is applied to the disposal fields (e.g., irrigation, injection, etc.) 3.6.3 A map of every field used for land application 3.6.4 The soil series present on every land application field 3.6.5 The crops grown on every land application field 3.6.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP 3.6.7 The PAN applied to every application field 3.6.8 The waste application windows for every crop utilized in the WUP 3.6.9 The required NRCS Standard Specifications 3.6.10 A site schematic 3.6.11 Emergency Action Plan 3.6.12 Insect Control Checklist with chosen best management practices noted 3.6.13 Odor Control Checklist with chosen best management practices noted 3.6.14 Mortality Control Checklist with the selected method noted FORM: AWO-STATE-G-DIGESTER-7/07/2022 Page 3 of 6 3.6.15 Lagoon/storage pond capacity documentation (design, calculations, etc.); please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility 3.6.16 Site Specific Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (Composting, waste transfers, etc.) 4. ENGINEER'S CERTIFICATION: I, Jeff Cappadona (P.E. representing Owner's name listed in question 1.2), attest that this application for Pork Plus (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledg understand that if all required parts of this application are not completed and that if all required supporting information and attaPj intsN"ot included, this application package will be returned to me as incomplete. Signature Engineer's Seal 5. F. CERTIFICATION: Date Z0Z 7 - Z I, rt,/j14-/ � -�(I �p/� (Owner/Permittee name listed in question 1.2), attest that this application for Pork Pigs (Facility —name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I and tand that if all requ ed parts of this application are not completed and that if all required supporting information and attachments a not included, this pp[ication package will be returned as incomplete. Signature 6. MANAGER'S CER Date 77/ N: (complete only if different from the Farm Owner) I, C- (Manager's name listed in question 1.7), attest that this application for Pork Plus (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION ANIMAL FEEDING OPERATIONS PROGRAM 1636 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 TELEPHONE NUMBER: (919) 707-9129 ELECTRONIC SUBMISSION IS ENCOURAGED. EMAIL TO: RAMESH.RAVELLA@NCDENR.GOV FORM: AWO-STATE-G-DIGESTER-7/07/2022 Page 4 of 6 New Swine Digester Animal Waste Management System THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER WATER QUALITY PERMITTING SECTION ANIMAL FEEDING OPERATIONS PROGRAM 1636 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 TELEPHONE NUMBER: (919) 707-9129 FAX NUMBER: (919) 807-6496 SURFACE WATER CLASSIFICATION: This form must be completed by the appropriate DWR regional office and included as a part of the project submittal information. INSTRUCTIONS TO NC PROFESSIONALS: The classification of the downslope surface waters (the surface waters that any overflow from the facility would flow toward) in which this animal waste management system will be operated must be determined by the appropriate DWQ regional office. Therefore, you are required, prior to submittal of the application package, to submit this form, with items 1 through 6 completed, to the appropriate Division of Water Resources Regional Operations Supervisor (see page 5 of 5). At a minimum, you must include an 8.5" by I V copy of the portion of a 7.5 minute USGS Topographic Map which shows the location of this animal waste application system and the downslope surface waters in which they will be located. Identify the closest downslope surface waters on the attached map copy. Once the regional office has completed the classification, reincorporate this completed page and the topographic map into the complete application form and submit the application package. 7.1 Farm Name: Pork Plus 7.2 Name & complete address of engineering firm: Cavanau¢h, 1213 Culbreth Dr., Wilmineton, NC 28405 Telephone: (817) 557-8923 Fax: (- Email: gus.simmons@cavanaughsolutions.com 7.3 Name of closest downslope surface waters: UT to Bakers Branch 7.4 County(ies) where the animal waste management system and surface waters are located: Sampson 7.5 Map name and date: Turkey. 2019 7.6 NC Professional's Seal (If appropriate), Signature, and Date: On map TO: REGIONAL OPERATIONS SUPERVISOR Please provide me with the classification of the watershed where this animal waste management facility will be or has been constructed or field located, as identified on the attached map segment(s): Name of surface waters: (/•% • %6 ,$4,<,E4,$ Asu eli Classification (as established by the Environmental Management Commission): Proposed classification, if applicable: 2// 9 Signature of regional office personnel: � Date: (All attachments must be signed) Page 5 of 6 (#2) UT TO BAKERS BRANCH EXISTING LAGOON DARK PLUS -ARM 0 FARM BARN C=3 O �_ PROPOSED O COVERED 0 ,J C&MI FARM DIGESTER 0 0 O 0 (#1) UNNAMED v TRIBUTARY TO BAKERS BRANCH �N/ f N (#3) UT TO f BAKERS BRANCH NAME OF STREAM STREAM CLASS STREAM INDEX 1 UT TO BAKERS BRANCH C;Sw 18-68-2-10-2-1 2 UT TO BAKERS BRANCH C;Sw 18-68-2-10-2-1 2 UT TO BAKERS BRANCH C;Sw 18-68-2-10-2-1 LATITUDE: 34°57'42.5"N \ ` WATERSHED CLASSIFICATION MAP BF GRADY BIOGAS COLLECTION PORK PLUS FARM OWNER:FAISON INVESTMENTS, LLC CAVANAU G H Stewardship through innovation I[NZf1.0 IIto] I NOT TO SCALE SU�80N xoxrrr i Cavanaugh & Associates, P.A. 1213 Culbreth Dr. Wilmington, NC 28403 (910) 392-4462 Fax: (910) 392-4612 www.cavanaughsolutions.com PROJECT #: BE19.006 DRAWN BY. LJL BD J: SCALE: 1"=600' 1 DATE. 2020-03 Pork Plus Volume Calculations Project: Project No: Date: Pork Plus BE.19.006 2023-7-27 Existing Configuration (For Reference) Farm Information: Farm Population: Storm and Rainfall: Storm (25-yr, 24-hr): Rainfall In Excess Of Evaporation: "Heavy Rain" Location: Sampson County, NC Design By: JPC Checked By: JPC 4,200 Finishing 7.0 in. 7.0 in. 0.0 in. CAVANAU G H 1 of 5 Proposed Configuration (Proposed Digester) Flow Path: Barns -> Digester (Proposed) -> Existing Lagoon Volumes: Capacity =' 4,200 Finishing Measured Sludge Depth Planned Sludge Depth Sludge to be Removed 41,111 CAVANAU G H Stewardship Through Innovation Oft 0 ft 0 cf 0 gal Note: 'Measured Sludge Depth' (see above) is 0 cf for Proposed Digesters Ca acit * ALW * cf/lb 1= Total Treatment Volume = ft 4,200 135 11.00 567,000 cf ICapacity IDaysofStorage al/ head*da = Total Daily Infow = 1 4,200 90 11.37 1517,860 gallons 69,233 cf * Note: The existing volumes shown below are provided based on the existing lagoon design for this farm, provided by the farm owner and dated 2009-3-5 Volume Required*(cf Digester (Proposed) Existing Lagoon Total Required Desired Digester Treatment Volume 135,000 N/A 135,000 Additional Treatment 8,343 423,657 432,000 Sludge Storage 0 0 0 Excess Wash Water 0 0 0 Rainfall In Excess Of Evaporation 0 52,207 52,207 Storm Storage 0 52,207 52,207 ,"Heavy Rain" 0 0 0 Daily Inflow (90 days) 5,628 63,604 69,233 Total 148,972 1 591,674 1 740,646 Note: Both 'Rainfall In Excess Of Evaporation' and 'Storm Storage' are shown as 0 cf for the digester because the HDPE cover prevents rain from entering the wastewater system and therefore doesn't need to be included in these volume calculations; the rain that falls on the cover is simply pumped off of the cover with a rainwater pump(s). That being said, per the NRCS 366 Anerobic Digester standard, rainfall is included in determining the operational volume of the digester. The NOAA Atlas 14 30yr normal rainfall data for the area has been used to determine the 25- year, 24-hour rainfall on the digester. With this data, the following value has been used for the 25-year, 24-hour rainfall event: Digester Storm (25-yr, 24-hr): 7.5 in. Volume Provided* (cf Digester (Proposed) Existing Lagoon Total Provided Desired Digester Treatment Volume 135,000 N/A 135,000 Additional Treatment 8,343 423,657 432,000 Sludge Storage 0 0 0 Excess Wash Water 0 0 0 Rainfall In Excess Of Evaporation 0 52,207 52,207 Storm Storage 0 52,207 52,207 "Heavy Rain" 0 0 0 Daily Inflow (90 days) 5,628 1 228,424 234,052 Total 148,972 1 756,494 1 905,466 Totals (cf) Volume Required* (cf) Volume Provided* (cf) Efficiency Treatment 567,000 567,000 100% Sludge Storage 0 0 N/A Excess Wash Water 0 0 N/A Rainfall In Excess Of Evaporation 52,207 52,207 100%" Storm Storage 52,207 52,207 100% "Heavy Rain" 0 0 N/A Daily Inflow (90 days) 69,233 234,052 338% Total 740,646 1 905,466 122% Days of Storage: Proposed Configuration Required rove e Dail Inflow Volume cu.ft. 69,2331 234,052 Days of Storage 901 304 2of5 Total Temporary Storage Proposed Configuration (Proposed Digester) Temporary Storage Volume Required* (cf) ages er (Proposed) Existing Lagoon Total Required Excess Wash Water 0 0 0 Rainfall In Excess Of Evaporation 0 52,207 52,207 "Heavy Rain" 0 0 0 Daily Inflow (90 days) 5,628 63,604 69,233 Total 1 5,6281 115,8111 121,439 Temporary Storage Volume Provided* (cf) Digester (Proposed) Existing Lagoon Total Provided Excess Wash Water 0 0 0 Rainfall In Excess Of Evaporation 0 52,207 52,207 "Heavy Rain" 0 0 0 Daily Inflow (90 days) 5,628 228,424 234,052 Total 1 5,6281 280,6311 286,259 Summary Total Temporary Storage (cf) Proposed Configuration Required rove e Excess Wash Water 0 0 Rainfall In Excess Of Evaporation 52,207 52,207 "Heavy Rain" 0 0 Daily Inflow (90 days) 1 69,233 234,052 Total 1 121,439 286,259 CAVANAU G H 3of5 Digester (Proposed) Volume Di ester Proposed Stage -Storage Elevation ft Area sf Incr. Vol cf Cumul. Vol cf 138.00 7,311 - 0 139.00 8,487 7,899 7,899 140.00 9,732 9,110 17,009 141.00 11,406 10,569 27,578 142.00 12,429 11,918 39,495 143.00 13,881 13,155 52,650 144.00 15,401 14,641 67,291 145.00 16,991 16,196 83,487 146.00 18,650 17,821 101,308 147.00 20,378 19,514 120,822 148.00 22,175 21,277 142,098 149.00 24,041 23,108 165,206 150.00 1 25,975 1 25,008 1 190,214 Digester Desired Volume: 135,000 cu ft. (5,000 cy) Digester Treatment Volume (@ Treatment Elevation of 148.06): 143,343 cu ft. (5,309 cy) % Desired: Digester (Proposed) Updated Elevations: 106% Zone Volume Cumulative Vol. Elevation Depth (in.) Planned Sludge 0 0 138.00 144.00 Treatment 143,343 143,343 148.06 23.28 Temporary 5,628 148,972 148.31 20.28 Storm 0 148,972 148.31 20.28 = 150.00' (190,214 cf) Top of Storm Elev = 148.31' (20.28") (148,972 cf) Top of Temp Storage Elev = 148.31' (20.28") (148,972 cf) (Start Pump) Top of Treat Elev = 148.06' (23.28") (143,343 cf) (Stop Pump) Mli CAVANAU G H Stewardship Through Innovation 4 of 5 Existing Lagoon Volume Existing Lagoon Stage -Storage Elevation ft Incr. Vol cf Cumul. Vol cf 87.00 -!L&LLsfL 45,698 - 22,599 88.00 49,447 47,573 70,172 89.00 53,237 51,342 121,514 90.00 57,062 55,150 176,663 91.00 59,685 58,374 235,037 92.00 62,347 61,016 296,053 93.00 65,245 63,796 359,849 94.00 68,073 66,659 426,508 95.00 70,961 69,517 496,025 96.00 73,910 72,436 568,460 97.00 77,027 75,469 643,929 98.00 81,276 79,152 723,080 99.00 85,792 83,534 806,614 99.40 89,497 35,058 841,672 Existing Lagoon Updated Elevations: Note: The dimensions and volumes shown are provided based on the lagoon design for the existing lagoon on this farm, provided by the farm owner and dated 2009-3-5 Zone Volume Cumulative Vol. Elevation Depth (in.) Sludge 0 0 87.00 148.80 Treatment 423,657 423,657 93.96 65.28 Temporary 280,631 704,287 97.77 19.56 Storm 52,207 756,494 98.41 11.88 = 99.40' (841,672 cf) Top of Storm Elev = 98.41' (11.88") (756,494 cf) Top of Temp Storage Elev = 97.77' (19.56") (704,287 cf) (Start Pump) Top of Treat Elev = 93.96' (65.28") (423,657 cf) (Stop Pump) CAVANAU G H 5of5 CAVANAU G H Stewardship Through Innovation Pork Plus Pump Station CalculaMens Project No.: BE.19.006 CAVANAUGH & ASSOCIATES, P.A. P❑ BOX 1 1 1 97 WINSTON-SALEM, NC 271 1 6, 1 -877-557-8923 WWW.CAVANAUGHSOLUTIONS.COM Pressure 25.00 50.00 75.00 100.00 psi Flow 1.00 300.00 700.00 1000.00 GPM ILS 4" Hog Pump, 560 gpm Pork Plus Influent Lift Station R1 Day 1, 12:1 EPANET 2 Pagel Page 1 6/28/2023 10:05:29 AM ********************************************************************** * E P A N E T * Hydraulic and Water Quality * Analysis for Pipe Networks * Version 2.2 ********************************************************************** Input File: Pork Plus ILS.net Link - Node Table: Link Start End Length Diameter ID Node Node ft in ---------------------------------------------------------------------- P1 J1 R3 583 7.549 P4 J4 J1 25 7.549 P5 J5 J1 25 7.549 P-1 R1 J4 #N/A #N/A Pump P-2 R1 J5 #N/A #N/A Pump Energy Usage: Usage Avg. Kw-hr Avg. Peak Cost Pump Factor Effie. /Mgal Kw Kw /day ---------------------------------------------------------------------- P-1 0.00 0.00 0.00 0.00 0.00 0.00 P-2 100.00 75.00 84.07 2.82 2.82 0.00 ---------------------------------------------------------------------- Demand Charge: 0.00 Total Cost: 0.00 Node Results: Node Demand Head Pressure Quality ID ---------------------------------------------------------------------- GPM ft psi J1 0.00 155.58 67.41 0.00 J4 0.00 155.58 67.41 0.00 J5 0.00 157.07 68.06 0.00 R1 -559.16 137.00 0.00 0.00 Reservoir R3 559.16 150.00 0.00 0.00 Reservoir Page 2 Link Results: ---------------------------------------------------------------------- Link Flow VelocityUnit Headloss Status ID GPM fps ft/Kft ---------------------------------------------------------------------- P1 559.16 4.01 9.58 Open P4 0.00 0.00 0.00 Open P5 559.16 4.01 59.46 Open P-1 0.00 0.00 0.00 Closed Pump P-2 559.16 0.00 -20.07 Open Pump Narrative 'Pork Plus' will utilize existing barns with slotted floors over flushing pits to collect manure. Upon flushing, Barns 1-10 will gravity flow waste through a 12" pipe to an influent lift Station (ILS). The influent lift Station will utilize two 10 hp GEA pumps, with a typical flow of approx. 560 gpm (1 pump) through an 8" HDPE (DR 17) forcemain into the anaerobic digester. After treatment in the anaerobic digester (190,214 cubic feet of total volume, 150,054 cubic feet at Operating Level), effluent will gravity flow through the 12" digester outlet pipe to the level control wet well (LC), which connects to a 12" pipe to the existing lagoon, where it will be irrigated in accordance with the waste utilization plan. FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE PIS REPORT FOR ZONE DESCRIPTIONS AND INDEZMAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMATAT HTTP://FRIS.NC.GOV/FRIS -Wilhoul 'nSej Flood Elevation (BEE) With BFE or Depth zone AE.o. AAH, I HNARDAREAS aR SPECIALFLODD — Regulatory Floodway — 0.2%Annual ChaFlood Hazard, A— . f 1%Annual nce Chance Flood with Average Depth Less Than One Faot or With Dreina a p g Areas of Less Than One Square Mile zone x — Future Condition. 1%Annual Chance Flood Hazard zone x OTIERAREASOF —Area wit Red ... d Road Risk due to Levee ROOD HATARD See Notes zonex OTHER — Are as Datarminetltba0utsidatha AREAS 0.2% Annual Chance FloodplMn zonex Channel, Culverl, or Storm Sewer »»»»»m Axredited or Provisionally Accredited GENERAL Lave, Dike, Or Flaadwall STRUCTURES ............ Nan-accredted Levee, Dike, ar Floodwall North Carolina Geodat o Survey bench mark EM ® National GeodeUC Survey bench mark sto® Contractor Fat. NCFMP Survey bench mark Cmss Sections wit 1%Annual Chance Water Surface Elevation (SEE aO----- Coastal Transec[ — — — - Coastal Transect Baseline - Profile Baseline Hydrographic Feature OTREt Iimitoi Stdy FEATURES du isdidim Boundary TED TES USERS I M TO uo601nlimt of Molar- Wave Action JUMWA) B ) s.Pw.,ewray. s.rm iaoow.w,io. timm'nm ®pCBRSArea cu 0e0Wmwlse Protected Aran N Pie,® wIRwTII�;, Fdm��mm'1I'SF: .: I11W��wom�EN1 r�®®M0m® ®0mm®C' 0000M! "U®om`al C:lT Omri NORTH CAROLINA FLOODPW N MAPPING PROGRAM NATIONALROODINSUPANCEPROGRAM O O INSURANCERATEMAP wc NORTH CAROLINA O d waa.2444 v IliNL1 COMcc MUNITY s CID PANEL SURE% N wARSAw.Towr or arose ua .0 _C LA_ EB Q z 02 NUMBER 3]202444001 MAP R.B. 01/05/07 Brown's of Carolina 11 /11 /2010 Hwy 24 East Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN G rower(s): Farm Name: Farm Faison Investments, LLC Pork Plus Sam Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish 4200 re: Storage Period: Application Method: >180 days Irrigation _agoon The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft" tons, etc.): Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gal/yr gal/yr Farrow to Feeder 4015 gal/yr gal/yr Farrow to Finish 10585 gal/yr gal/yr Wean to Feeder 223 gal/yr gal/yr 4200 Feeder to Finish 986gal/yr 4,141,200 gal/yr Total 4,141,200 galtyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibs/yr Ibs/yr Farrow to Feeder 6.5 Ibs/yr Ibs/yr Farrow to Finish 26 Ibs/yr Ibs/yr Wean to Feeder 0.48 Ibs/yr Ibs/yr 4200 Feeder to Finish 2.3 Ibs/yr 9,660 Ibs/yr Total 9,660 Ibs/yr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 64.46 Total N Required 1 st Year: 17494.0888 Total N Required 2nd Year: 20413.8288 Average Annual Nitrogen Requirement of Crops: 18,953.96 Total Nitrogen Produced by Farm: 9,660.00 Nitrogen Balance for Crops: (9,293.96) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 'Reception Area Specifications ��®�o��o��■�©moo ®mom® 3(a) of 8 Reception Area Specifications .� SAW 3(b) of 8 Reception Area Specifications 3 (c) of 8 3 (c) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yie A Barley 1.6 Ibs N / bushel B Hybrid Bermudagrass - Grazed 50 Ibs N / ton C Hybrid Bermudagrass - Hay 50 Ibs N / ton D Corn - Grain 1.25 Ibs N / bushel E Corn - Silage 12 Ibs N / ton F Cotton 0.12 Ibs N / Ibs lint G Fescue- Grazed 50 Ibs N / ton H Fescue- Hay 50 Ibs N / ton I Oats 1.3 Ibs N / bushel J Rye 2.4 Ibs N / bushel K Small Grain - Grazed 50 Ibs N / acre L Small Grain - Hay 50 Ibs N / acre M Grain Sorghum 2.5 Ibs N / cwt N Wheat 2.4 Ibs N / bushel O Soybean 4.0 lbs N / bushel P Pine Trees 40 Ibs N / acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN/ r/animal Farm Total/ r Farrow to Wean 0.84 Farrow to Feeder 1 Farrow to Finish 4.1 Wean to Feeder 0.072 4200 Feeder to Finish 0.36 1512 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1512 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 7560 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 25 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 60.48 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in 5 of 8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop in/hr * inches 3410 2E Norfolk B 0.5 1 2F Norfolk B 0.5 1 6A Goldsboro 0 0.4 1 6B Goldsboro 0 0.4 1 6C Goldsboro 0 0.4 1 6D Goldsboro 0 0.4 1 6E Goldsboro 0 0.4 1 6F Goldsboro 0 0.4 1 6G Goldsboro 0 0.4 1 6H Goldsboro 0 0.4 1 12416 sub2 Norfolk B 0.5 1 sub6a-f Goldsboro 0 0.4 1 sub6g&h Goldsboro 0 0.4 1 6of8 Additional Comments: This plan includes an optional crop rotation of Millet/Rye which may be use in any year. Field specifications for this rotation are listed on page M. Small grain hay after soybeans is an optional crop. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Pork Plus Owner: Faison Investments, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owf Signature: Name of Manager (if different from owner): Signature: Date Name of Technical Specialist: Dawn Williamson Affiliation: _ Murphy -Brown, LLC. Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: Q01, Date 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist'. Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 Grower: Pork Plus Address: PO Box 856 Warsaw, NC 28398 County: Sampson Ueslgneci by: Kbvv Checked By: DSE Date: 03/05/09 Sheet 1 of 7 ANAEROBIC WASTE LAGOON DESIGN FARM INFORMATION Farm Population: Nursery: --------------------- 0 Wean to Finish: _...__..._..__..._..__ 0 Finishing: __-_-_...___._._. 4200 Fic. Farrow to weanling: 0 Farrow to feeder: -------------- -- - •-- 0 Farrow to finish: - --- 0 Boars: __..---••------__-- 0 Storage Period: - --- - 90 Days 25 Yr. / 24 Hr Storm Event - 7.0 In. "Heavy Rain" Factor Rainfall in Excess of Evaporation --•-------- 7.0 In. Additional Water Usage: -- - 0 Additional Drainage Area: --- 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N) ------------ Y Does Operator Want Emergency Spillway? (Y/N) ------------ N Was This Design Built Prior to Sept. 1996? (Y/N) ------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N) ------------ N Seasonal High Water Table Elev: ----- 0.00 Freeboard: 1.0 Ft. Emergency Spillway Flow Depth: Side Slopes: 3 :1 (Fi:V) Top of Dike Elevation: Depth 99.40 Ft. Finished Bottom Elevatior: BOTTOM E 13.20 Ft. 86.20 Ft. Start Pump Elevation: 19.68 In. 97.76 Ft. Stop Pump Elevation: 38.64 In. 96.18 Ft. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES Storm Stor = 52207 (Cu.Ft.) 52,410 (Cu.Ft.) Temporary = 121439 (Cu.Ft.) 122,039 (Cu.Ft.) Permanent = 567000 Cu.Ft. 582,044 Cu,Ft. _ _ _ Total Volume = - 740,646 (Cu.Ft.) 756,494 (Cu.Ft.) 112 Treatment Volume = 283,500 (Cu.Ft.) 1/2 Treatment Volume Elevation = 92.04 Ft. 90 Temporary Storage Volume Elevation = _ N/A Ft. __- Min. Required Liner Thickness - - Lagoon Surface Area: (inside TOD) REQ'D. ' 00.39% 100.49% 102.65% 02.14% 88.33 In. WA In. 1.9 89,497 S.F . Murphy -Brown, LLC Engineering P.O. Box 856 ,VJarsa•l, NC 28398 "310) 293-3434 Grower: Pork PlusDesigned-By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 03/05/09 County: Sampson Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. LAGOON STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT) 87.00 45,698 22,599 88.00 49,447 47,573 70,172 89.00 53,237 51,342 121,514 90.00 57,062 55,150 176,663 91.00 59,685 58,374 235,037 92.00 62,347 61,016 296,053 93.00 65,245 63,796 359,849 94.00 68,073 66,659 426,508 95.00 70,961 69,517 496,025 96.00 73,910 72,436 568,460 97.00 77,027 75,469 643,929 98.00 81,276 79,152 723;080 99.00 85,792 83,534 806,614 99.40 89,497 35.058 841,672 These volumes were calculated usin TOTAL REQD_V_OL 740,646 CF END PUMP = = _ = 96.18 FT START PUMP = = 97.76 FT MAX STORAGE = 98.40 FT the vertical average end area method. CUMULATIVE VOL. ZONE_VO_L_ �^ _ 582,044 CF TR'MT 582,044 704,084 CF TEMP 122,039 756,494 CF STORM 52,410 102.14% 102.65% 100.49% 100.39% Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw, NC 28398 (9; 0) 293-3434 Grower: Pork Plus Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 03/05/09 County: Sampson Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: Arnma T Type Capacity ALW (cu. t./lb) = Totals Nursery - 0 30 1.00 0 Wean to Finish - 0 115 1.00 0 Finishing 4,200 135 1.00 567,000 Farrow to weanling 0 433 1.00 0 Farrow to feeder - 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 567,000 Animal Type Capacity _ ALW ` cu. t./Ib) = i-otal Nursery 0 30 0.00 0 Wean to Finish 0 115 0.00 Finishing 4,200 135 0.00 _ _0 0 _ Farrow to weanling _ 0 433 0.00 _ 0 Farrow to feeder 0 522 0.00 G Farrow to finish 0 1,417_ 0.00_ .- _.0.000 I 0 ---- 0- _ Boars ---------1----- _ _'_0400 Total Reauired Sludae Storaae Volume (cu. ft.)= U TemporarV Storage Volume: Manure Production: Ij Animal Type rapacity ` Sto. Period d.iday = Cotal 1 Nursery 0 90 0.30 0 1 Wean to Finish '-------------- --_-_-_.---0- ---------- 90 ---..._-._•-1.17 -- ---__. - -0- Finishing 4,200_ 90 1.37 517,860 Farrow to weanling - 0 _ 90 90 _ 4.39 y 5.30 - 0 i 0 _ Farrow to feeder - _ - - 0 Farrow to finish 0 90 14.38 0 _ _ Boars -` _ 0 _ — 90 � 4.06 _ _ - - 0 Total Manure Production (gals.)= Total Manure Production (cu.ft.)= Excess Fresh Water: 517,860 69,233 Animal Type - _-�—. -- capacity ''_ Sto. eriod J./day) _ Total - -- ------ ----- Nursery ----.�.__-_ 0 90 _ 0.00 0 Wean to Finish - 0 90 90 -- - 0.00 0.00 0.00 - 0 -.0- 0 ' Finishing 4,200 Farrow to weanling 0 90 _ _ Farrow to feeder__ _ -_- 0 90 _ 0.00 0. _ _ Farrow to finish -- 0 90 _ _-_ 0.00 -__ Boars _ _ 0 90 _ 0.00 _0 0 Total Fresh Water Excess (gals.)= Total Fresh Water Excess (tuft.)= U U reerrnc/ V. U. Box 856, Warsaw NC 28398 (910) 293. 3434 Grower: Pork Plus Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 03/05/09 County: Sampson Sheet 4 of 7 Temporary Storage Volume: (Cont.) Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area + Additional Drainage Area) x Rainfall / 12in./ft Vol.= (89497 sq.ft. + 0 sq.ft.) Y 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 52,207 Storm Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) ' 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (89497 sq.ft + 0 sq.ft.) ' 7.0 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 52,207 "Heavy Rain" Storage Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) ' "Heavy Rain" Factor (in) / 12in./ft. Vol.= (89497 sq.ft + 0 sq.ft.) " 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= 52,207 (CU.FT) Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) = 121,439 (CU.FT) Total Required Permanent Storage (Treatmen: + Sludge) = 567,000 (CU.FT) TOTAL REQUIRED VOLUME = 740646 (CU.FT.) uphy-Brown, Ll_C Engineering P.O Box 856, Warsaw Grower: Pork Plus Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 03/05/09 County: Sampson Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation •-------- ----•--• 99.40 FT. Emergency Spillway Crest Elevation - -. •--••••-••------- Not Al Applicable Top of 25Yr. / 24Hr. Storm Storage --------------- ---- 98.40 FT. Top of "Heavy Rain" Storage -------------------• Not Applicable Start Pump Elevation ............---.----- 97.76 FT. End Pump Elevation --------------------- 96.18 FT. Top of Sludge Storage -- ----------- Not Applicable Seasonal High Watertable Elev............... 0.00 Finished Bottom Elevation - 86.20 FT. Inside Top Length - Not Applicable Inside Top Width -- -- •-- •-------• Not Applicable Side Slopes 3: 1 H:V Lagoon Surface Area ••--------------- 89,497 SF Min. Liner Thickness (if required) --------- - -- 1.9 FT. Freeboard Depth ----•• 1.00 FT. Temporary Storage Period 90 Days Zone Depths: TOTAL DESIGN VOLUME = 756494 (CU.FT.) Treatment / Sludge Storage Zone Depth 10.0 FT. Temporary Storage Zone Depth 1.6 FT. Freeboard / Storm Storage Zone Depth 1.6 FT. Total Lagoon Depth 13.2 FT. Murphy -Brown, LL P.O. Box 856, Warsaw Grower: Pork Plus Designe KB'J;+ Address: PO Box 856 Checker DSE Warsaw, NC 28398 Date: 03/05/09 Countv: Sampson Sheet 6 of 7 SIRT PMP EL.= 97.76 END PMP EL. = 96.18 ZONE ELEVATIONS TOP OF DIKE ELEV = 99.40 TOP OF STORM ELEV = 98.40 TOP OF TEMP STORAGE ELEV = 97.76 TOP OF TREAT ELEV = 96.18 FINISHED BOTTOM ELEV = 86.20 r� r SHWT = 0.00 wn, LLC Engineering P.O. Box 856, Warsaw ldC 28398 (910.) 293-3434 FARMS ENGINEERING DEPARTMENT 14YCWC = (910) 2E9 - 7111. EIT, 5W P• A "X 759 Rp.SC FflL[, Nogw Cl"alA 211% LT CALr_ULATED a aIf-C;,TD n r--- is U U 119'140'19 g EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) (910) 796-7215 EMERGENCY MANAGEMENT SERVICES (EMS) (910) 296-2160 SOIL AND WATER CONSERVATION DISTRICT (SWCD) (910) 296-2120 NATURAL RESOURCES CONSERVATION SERVICE (NRCS) (910) 296-2120 COOPERATIVE EXTENSION SERVICE (CES) (910) 296-2143 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) hump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge- d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop Irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) if holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a day type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c_ Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number. (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice / technical assistance phone number. 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: ffw g b. Contractors Address: Ke�-s `l c . Contractors Phone: Ao Z g2l 0 19 l 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: :- pco • . Mee b. Phone: f��91 013 t 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Liquid Systems Flush gutters • Accumulation of solids CY Flush system is designed and operated sufficiently to remove accumulated solids from gutters as esigned IT Remove bridging of accumulated solids at Lagoons and pits • Crusted solids ;r Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 to 8 inches over more than 30 percent of surface Excessive vegetative • Decaying vegetation QVMaintain vegetative control along banks of growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems Feeders Feed spillage O Design, operate, and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage O Clean up spillage on a routine basis (e.g., 7- to 10- day interval during summer; 15- to 30-day interval during winter) AMIC - November 11, 1996, page 1 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Feed storage • Accumulations of feed 0 Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by ensuring drainage is away from site and/or providing adequate containment (e.g., covered bin for WA brewer's grain and similar high moisture grain products) O Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed Animal holding areas • Accumulations of animal 0 Eliminate low areas that trap moisture along fences wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal O Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastesIAIA (i.e., inspect for and remove or break up accumulated solids as needed) Dry manure handling . Accumulations of animal 0 Remove spillage on a routine basis (e.g., _ systems wastes 7- to 10-day interval during summer; 15- to 30-day interval during winter) where manure is loaded for land application or disposal 1AA 0 Provide for adequate drainage around manure stockpiles O Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed For more information contact: Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC - November 11, 1996, page 2 Swine Farm Waste Management — Odor Control Checklist Permit No.: ^kblfa 66]67 Dat INSTRUCTIONS FOR USE Owner Signature: '7 ` ♦ Odor Control Checklist is required by General Statute 143-215.10C(e)(1) ♦ Check any/all the BMPs you will implement on this facility. Items checked/selected become a requirement of the CAWMP. ♦ Items in bold or pre -selected are required. ♦ Add any site -specific details related to the selected BMPs ♦ Include any other odor control measures not listed ♦ NOTE: Not all BMPs may be cost-effective for every facility. Evaluate each BMP prior to selecting for your facility. Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices FARMSTEAD ♦ Swine Production j"Maintain vegetative or wooded buffers at or near property boundary ♦ Improper drainage 2 /C'ra�a and landscape so water drains away om facilities and prevent ponding Maintain farm access roads and prevent traffic in waste application area ❑ Other BMPs — please describe MORTALITY MANAGEMENT ♦ Carcass ® Dispose of mortality using method approved Decomposition by NCDA&CS State Veterinarian. Manage According to CAWMP (Mortality Management Checklist) and permit(s). ❑ Put carcasses in refrigerated (or freezer) dead boxes within 24 hours for short-term mortality storage. ♦ Incomplete Incineration ❑ Use incinerators with secondary burners for complete combustion. ❑ Other BMPs — please describe • Traps dust and gases, provides dilution and visual screening • May require third party input/approval • Reduce odors and vectors that occur with stagnant conditions • Prevents spillage during transport and tracking of waste onto public roads • Required by statute and permit • May require third party input/approval • Reduce odors by complete incineration Swine AMOC Page 1 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management — Odor Control Checklist Permit No.: A05 %aoo�j Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE / BARN — WASTE HANDLING ♦ Flush tanks ❑ stall flush tank covers ♦ Odorous Gases Flush pits at least 4 times per day ♦ Partial microbial ❑ Empty pits at least once every 7 days decomposition ❑ Underfloor flush with pit ventilation ♦ Agitation of wastes [Install/extend fill lines to near bottom of tanks with anti -siphon vents ❑ Install covers on outside waste collection or junction box ❑ nstall sump tank covers for lift stations ♦ Ammonia Flush/recharge with treated effluent ❑ Treat waste in pits with proven biological or chemical additive ❑ Other BMPs — please describe HOUSE / BARN — FLOOR AND INDOOR SURFACES ♦ Manure covered floors ❑ crape manure from alleys into pens daily nstall fully slotted floor system nstall waterers over slotted floor area Install feeders at high end of solid floors ♦ Odorous Gases crape manure buildup from floors and walls Keep floors dry ❑ Install underfloor ventilation for drying ❑ Replace bedding/scrape at frequency to keep bedding dry ❑ Other BMPs — please describe Swine AMOC • Pit -flush systems • Pit -flush systems • Pit -recharge or "pull -plug" systems • Monitor for any solids accumulation in pit • Will move with other manure via pits • Where applicable • Aids in animal cleanliness • Aids in animal cleanliness • Solid floor/bedding systems Page 2 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management — Odor Control Checklist Permit No.: A..�Spaoa� Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE / BARN — VENTILATION ♦ Dust ❑ Clean fans regularly —specify frequency ♦ Volatile/odorous gases E icient air movement Install temperature and humidity sensors to control ventilation ❑ Treat barn exhaust ❑ Other BMPs — please describe HOUSE / BARN — FEED ♦ Dust ❑ Install feed covers ♦ Adsorbed Gases ® Keep outdoor feed storage covered except hen necessary to add/remove feed Minimize free -fall height of dry feed ❑ Install feed delivery downspout extenders e thefeed covers move spoiled/unusable feed on regular basis V,Feed pellets instead of dry meal e feed additives ♦ Ammonia Use feed -reduced crude protein diet ❑ Other BMPs — please describe HOUSE / BARN — GENERAL ♦ Dust Install temperature and humidity sensors ♦ Odorous Gases to control ventilation ❑ Use ultraviolet light to treat indoor air ❑ Use indoor or outdoor electrostatic space charge system ❑ Other BMPs — please describe • Examples: biofilters, wet scrubbing, windbreaks • May reduce ventilation rate depending on method • Required by rule 15A NCAC 02D .1802 • May require third party input/approval • May require third party input/approval • May require third party input/approval • Maintain relative humidity at 40 to 65% • Can be used to treat exhaust air Swine AMOC Page 3 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management — Odor Control Checklist Permit No.: 6POO' '� J Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAGOON / WASTE STORAGE STRUCTURE ♦ Volatile Gases ® Maintain proper lagoon volume ❑ Minimize free -fall height of waste from discharge pipe to lagoon surface ❑ Extend discharge point of pipe to below lagoon quid level aintain proper surface area -to -volume ratio Use correct lagoon start-up procedures ❑ Aerate for odor control ® Manage sludge levels based on annual sludge rvey as required by permit Keep spilled feed or foreign debris out of lagoon to prevent excess sludge accumulation ❑ Install/use solids separation system ❑ Use proven biological or chemical additives ❑ Use permeable lagoon covers (not a digester) ❑ Use impermeable lagoon cover or anaerobic digester ❑ Other BMPs — please describe LAND APPLICATION ♦ Odorous gases ® Perform land application in accordance with CAWMP ♦ Wind drift ® Pu p intake near lagoon surface ❑ mp from second stage lagoon Fo w good neighbor policy Operate at minimum recommended pressure ❑ Increase setbacks beyond those required by statute, rule, or permit • Sufficient liquid volume/depth is required for proper anaerobic treatment • Use caution not to scour or damage lagoon liner • Monitor for any increase in rate of solids accumulation • Methane can be flared if not utilized • Required by rule 15A NCAC 02D .1802 *Avoid application on known weekends, special days, or holidays/eves if possible Swine AMOC Page 4 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management — Odor Control Checklist Permit No.: Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAND APPLICATION (CONTINUED Apply during favorable wind conditions, (especially for traveling guns or impact 2 W rinklers) ather practical, apply waste on sunny days than cool, overcast days ❑ When possible, apply waste mid -morning to late -afternoon • Recommend checking predicted average hourly wind speed within 24 hours prior to anticipated start • Allows for vertical dissipation of odor • Allows for better vertical dissipation of odor ❑ For traveling guns, use taper -ring or taper -bore • Less odor and drift than ring nozzles p6zzles For traveling guns, use largest -available nozzle that provides acceptable application uniformity ❑ Replace impact sprinklers with low -drift nozzles on center pivots and linear move systems. ❑ Use hose -drag system ❑ Use injection method for waste application ❑ Other BMPs — please describe SLUDGE DISPOSAL ♦ Odorous gases Z�ansport sludge in covered vehicles or tankers gXp I in thin, uniform layers • Speeds drying and prevents pondin Incorporate land -applied sludge as soon as • Required within 48 hours or prior to next rain event, practical after application, and in accordance whichever is first, for conventionally tilled with permit. bare soils ❑ Use injection method for sludge application ❑ Dewater sludge prior to application ❑ Use alternatives to land application, such as compost, gasification, energy generation, etc. ❑ Other BMPs — please describe Swine AMOC Page 5 of 6 APPROVED — 7/25/2019 ADDITIONAL INFORMATION AVAILABLE FROM: Air Management Practices Assessment Tool (AMPAT) AHG-538-A Certification Training for Animal Waste Management Systems: Type A EBAE 103-83 — Lagoon Design and Management for Livestock Manure Treatment and Storage EBAE 128-88 — Swine Production Facility Manure Management: Pit Recharge -Lagoon Treatment EBAE 129-88 — Swine Production Facility Manure Management: Underfloor Flush -Lagoon Treatment EBAE Fact Sheet — Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet— Swine Production Farm Potential Odor Sources and Remedies NC NRCS Standard 359 — Waste Treatment Lagoon NC NRCS Standard 380 — Windbreak/Shelterbelt Establishment NC NRCS Standard 422 — Hedgerow Planting NC NRCS Standard 442 — Sprinkler System Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107 1995 Conference Proceedings Options for Managing Odor: A Report from the Swine Odor Task Force www.extension.iastate.edu/ampat/ NC Division of Water Resources www.bae.ncsu.edu www.bae.ncsu.edu www.bae.ncsu.edu www.bae.ncsu.edu www.bae.ncsu.edu www.nres.udsa.gov www.nres.udsa.gov www.nres.udsa.gov www.nres.udsa.gov Florida Cooperative Extension Service NC State University Swine AMOC Page 6 of 6 APPROVED — 7/25/2019 Version —November 26, 2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality © Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. ® U Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). ❑ Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). 17 Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • th�e.�a of imminent threat of a disease emergency, the State Veterinarian may enact �rfditional teri porary procedures or measures for disposal according to G.S. 106-399.4. of rmOwner/Manager Date 4 / Signature of Technical Specialist Date Anaerobic Digester System O&M Table of Contents I. Definitions.............................................................................................................................................2 II. Introduction.......................................................................................................................................... 3 III. Description of the Operational Components....................................................................................3 1) Gravity Collection Pipe..................................................................................................................3 2) Influent Pump Station (where necessary)....................................................................................4 3) Anaerobic digester........................................................................................................................5 4) Mixing Pump Station.....................................................................................................................6 5) Effluent Pump Station (where necessary)....................................................................................6 6) Storage Basin.................................................................................................................................7 7) Unison Conditioning System.........................................................................................................7 8) Flare..............................................................................................................................................8 9) Transfer Pump...............................................................................................................................8 10) Stormwater Removal Pump......................................................................................................9 IV. Description of Anticipated Maintenance..........................................................................................9 A. Routine System Maintenance Instructions.......................................................................................9 B. Troubleshooting..............................................................................................................................10 C. Emergency Protocols, Repair, and Replacement............................................................................10 D. Warranty Information.....................................................................................................................11 1) Farm Site.....................................................................................................................................11 V. Provisions for Safety Measures...........................................................................................................11 VI. Spill Prevention and Control Provisions..........................................................................................12 Appendix A: Contact Information.............................................................................................................13 Appendix B: Farm Operations and Maintenance Checklist.....................................................................15 Anaerobic Digester System O&M Page 1 of 16 Definitions Anaerobic Digestion - A method of wastewater treatment that utilizes the natural decomposition of the waste by bacteria in the absence of oxygen to produce gases commonly referred to as biogas. Anaerobic Digester - A basin or tank that holds the wastewater for anaerobic digestion. Biogas - Produced by anaerobic digestion, and is typically comprised of approximately 55% methane (the primary constituent of natural gas), with the remainder being mostly carbon dioxide (COA. Anaerobic Digester System O&M Page 2 of 16 II. Introduction The proposed swine manure biogas project uses anaerobic digestion of hog barn waste to produce biogas (consisting of approximately 65% methane, which is the primary constituent of natural gas) which is collected, conditioned, and ultimately injected into the utility's natural gas pipeline. Each hog farm site includes influent collection piping from the hog barns, an anaerobic digester or covered lagoon, a digester mixing system, a biogas conditioning system to remove moisture, a back-up flare unit, and a biogas transfer pipe leading to the Gas Upgrading System (GUS). The anaerobic digesters at each farm site include an HDPE membrane cover to capture the biogas generated by the anaerobic digestion process. The anaerobic digester is partially mixed by pumping, and provides sufficient detention time to effectively reduce the volatile suspended solids in the raw waste by anaerobic digestion. The reduction of volatile solids through microbial processes produces an energy -rich biogas, which is a valuable commodity. There are two (2) types of solids found in liquid waste: organic and inorganic. The inorganic solids are "non -treatable," but they are normally present in such small quantities that they are considered insignificant in the treatment process. However, excessive quantities of sand, grit, clay, etc. can cause the need to pump out the digester more often. The organic solids will break down and decompose by biochemical reduction. The bacteria that is grown and maintained in the system are harmless anaerobic and anoxic bacteria. These same bacteria are provided by nature and are found in streams, lakes, and in the soil to destroy dead plants and animals. The difference is that in the treatment process, man has provided an ideal environment for a concentration of these bacteria to feed and grow; thus, the biological action is greatly accelerated. Raw wastes are the food for the bacteria in the system. The anaerobic digester contains certain populations of bacteria that do not require the presence of oxygen. In addition to the information covered by this manual, the system operator should become familiar with the characteristics of the wastewater being treated and with local, state, and federal laws which may apply to the operation of the system. Design Flow - The waste collection system, influent pump station (where necessary), and anaerobic digester systems have been designed to handle the Average Daily Flow Rate (ADF) of the farms in which they are connected, including the manure and wastes generated by the animals, flushing liquids, and other wastes typical of confined swine animal housing. All treatment units were designed for the Design Flow for continuous, seven (7) days per week operation. III. Description of the Operational Components Below are listed the major component operations. 1) Gravity Collection Pipe Anaerobic Digester System O&M Page 3 of 16 The gravity collection pipe receives the flushed waste from the hog barns and directs that waste to the influent pump station (or mixing pump station, where applicable). During normal operation, the pipe should be free -flowing, with no clogs present, in order to transport waste to the influent pump station or other downstream processes. The gravity collection pipe includes a series of clean -outs that provide access to the gravity collection pipe for removal of a clog or blockage via use of a sewer snake or similar apparatus should the need arise. Sending flushed waste from the hog barns to the gravity collection pipe is the farmer's responsibility. The operator of the biogas system should periodically check each hog barn waste outlet to ensure that there are no overflows, clogs, etc. The influent pump station includes an analog run-time meter for each pump, which can be monitored by the operator to ensure the pumps are operating for sufficient times to indicate proper flushing by the farm owner. 2) Influent Pump Station (where necessary) The influent pump station receives waste from the gravity collection pipe and pumps that waste to the anaerobic digester via buried forced main. The waste enters the digester at the opposite end of the digester outlet (so "new' waste must flow through the curtain baffle system of the digester, resulting in effective treatment of the waste). During normal operation, the pump station will automatically cycle on and off based on the liquid level in the wet well, which is triggered by 4 floats. The lowest float is the "pump off' float, and is set at approximately 12" above the bottom of the wet well. The pump station should not run if the liquid level is below this float. The 2nd lowest float is the "lead pump on" float, and is set at an elevation approximately 2" below the inlet pipe invert, and above the "lead pump off' float. When the liquid level is above this float, only one pump will run at any given time, where the pumps will alternate between cycles (Pump 1 will run while Pump 2 is off, and in the next cycle Pump 2 will run while Pump 1 is off, and so on). The 3rd lowest float is the "lag pump on" float, and is set approximately 6" above the "lead pump on" float. If the liquid level fills above this float, then both pumps will run until the "pump off' float is disengaged. The 4th and highest float is the "high level alarm" float. When the liquid level is above this float, an audible and visual alarm is triggered to alert the operator system that there is a problem that has prevented pump operation. The pipe from each of the two pumps goes through a check valve (which only allows the liquid to travel in one direction) and a plug valve (normally open, but can be closed when needed, such as when servicing the upstream pump). The two pipes join together by a tee, and the downstream pipe leads to the inlet of the digester. Anaerobic Digester System O&M Page 4 of 16 During normal operation, the pumps may run several times an hour to pump waste to the anaerobic digester. Only one pump will run at any given time, normally, where the pumps will alternate between cycles (Pump 1 will run while Pump 2 is off, and in the next cycle Pump 2 will run while Pump 1 is off, and so on). It is not uncommon, however, for both pumps to operate during higher inlet flows. The pumps can also be controlled manually, if desired, or in times of troubleshooting, etc. The control panel next to the pump station includes toggle switches for each pump, which can be set to either (1) Auto (for normal float -based operation), (2) Off, or (3) "Hand" (i.e., manual operation). The alternating of pumps can also be changed within the control panel, where a toggle switch allows the operator to choose "Lock 1", "Alternate", or "Lock 2". During normal operation, the toggle switch will remain at "Alternate" in order to alternate the pumps between pumping cycles, but the operator can choose to lock the use of Pump #1 or lock the use of Pump #2 if needed. In the event of a pipe clog or pump failure, the waste will flow through the gravity "digester bypass" pipe connecting the interior of the pump station to the existing lagoon at an elevation below the top of the wet well, which will avoid overflow of the pump station. Note: Some farms do not have Influent Pump Stations; rather than using an Influent Pump Station, the waste flows from the barns to the Mixing Pump Station, which is further described below. 3) Anaerobic digester The anaerobic digester receives all raw wastes from the hog barns. The complex organic wastes are broken down to simpler compounds by the anaerobic digestion process. As a part of the anaerobic process, bio gases (including methane, carbon dioxide, and hydrogen sulfide) are produced. These gases are captured by an impermeable cover and then directed to the biogas conditioning system for dehydration and pressurization. The gases are collected in perforated piping underneath the cover, which are connected to a main pipe that connects to the conditioning system. The wastes are held for about 45 days to allow the biological process to complete. The sludge that settles at the bottom of the digester is periodically removed by connecting portable pipes and pumps to the sludge removal pipes in the digester, and disposed of by permitted means on the farm or by a contract sludge hauler. During normal operation, the digester cover will likely be "inflated" like a balloon due to the biogas that's trapped beneath. The cover should be free of excessive accumulation of rainwater, and should not show signs of any damage or leaks. The presence of foul odor, a strong wastewater smell, or "dirty" water on the cover may indicate that there is a leak. If such odors or dirty water are observed, the operator should carefully inspect the cover for leaks, and take action to repair the cover temporarily with adhesive tape. Temporary repairs should be followed with a permanent repair or patch as soon as possible. Anaerobic Digester System O&M Page 5 of 16 4) Mixing Pump Station The mixing pump station slowly mixes the waste that has been collected in the anaerobic digester, which provides for more efficient methane production than would be achievable without any mixing. During normal operation, the pumps will run at the same time for several hours per day to mix the waste in the anaerobic digester. A common schedule for the pumps would be 6 hours on, then 6 hours off, and so on. The pumps can also be controlled manually, if desired, or in times of troubleshooting, etc. The control panel next to the pump station includes toggle switches for each pump, which can be set to either (1) Auto (for normal operation), (2) Off, or (3) "Hand" (i.e., manual operation). 5) Effluent Pump Station (where necessary) The effluent pump station receives liquids from the anaerobic digester and pumps that waste to the downstream influent storage lagoon via buried forced main. The liquid enters the effluent pump station at the opposite end of the digester inlet (so "new" waste must flow through the curtain baffle system of the digester, resulting in effective treatment of the waste). During normal operation, the pump station will run based on the liquid level in the wet well, which is triggered by 4 floats. The lowest float is the "pump off' float, and is set at approximately 12" above the bottom of the wet well. The pump station should not run if the liquid level is below this float. The 2nd lowest float is the "lead pump on" float, and is set at an elevation approximately 2" below the inlet pipe invert, and above the "lead pump off' float. When the liquid level is above this float, only one pump will run at any given time, where the pumps will alternate between cycles (Pump 1 will run while Pump 2 is off, and in the next cycle Pump 2 will run while Pump 1 is off, and so on). The 3rd lowest float is the "lag pump on" float, and is set approximately 6" above the "lead pump on" float. If the liquid level fills above this float, then both pumps will run until the "pump off' float is disengaged. The 4th and highest float is the "high level alarm" float. When the liquid level is above this float, an audible and visual alarm is triggered to alert the operator via telemetry system that there is a problem that has prevented pump operation. The pipe from each of the two pumps goes through a check valve (which only allows the liquid to travel in one direction) and a plug valve (normally open, but can be closed Anaerobic Digester System O&M Page 6 of 16 when needed, such as when servicing the upstream pump). The two pipes join together by a tee, and the downstream pipe leads to the inlet of the digester. During normal operation, the pumps may run several times an hour to pump waste to the lagoon. Only one pump will run at any given time, normally, where the pumps will alternate between cycles (Pump 1 will run while Pump 2 is off, and in the next cycle Pump 2 will run while Pump 1 is off, and so on). It is not uncommon, however, for both pumps to operate during higher inlet flows. The pumps can also be controlled manually, if desired, or in times of troubleshooting, etc. The control panel next to the pump station includes toggle switches for each pump, which can be set to either (1) Auto (for normal float -based operation), (2) Off, or (3) "Hand" (i.e., manual operation). The alternating of pumps can also be changed within the control panel, where a toggle switch allows the operator to choose "Lock 1", "Alternate", or "Lock 2". During normal operation, the toggle switch will remain at "Alternate" in order to alternate the pumps between pumping cycles, but the operator can choose to lock the use of Pump #1 or lock the use of Pump #2 if needed. The gravity outlet of the anaerobic digester leads to the inlet of the effluent pump station, and the invert is set at the freeboard of the digester so that the digester maintains a constant level. The inlet pipe to the effluent pump station should remain submerged in water at all times to prevent the escape of gases from beneath the digester cover. Note: Some farms do not have Effluent Pump Stations; rather than using an Effluent Pump Station, the waste gravity flows from the anaerobic digester to the lagoon. 6) Storage Basin The effluent of the anaerobic digester flows from the anaerobic digester outlet pipe to the storage basin. The storage basin is used to store the treated effluent subsequent to anaerobic digestion. The individual farm owners are responsible for the operation and maintenance of the storage basins. However, as this is a critical part of the integrated system, the Operator should note any abnormal operation of the storage basin, such as leaks or excessive liquid level, and communicate such observations to the farm owner. During normal operation, the storage basin will most often appear to be inactive. Waste will periodically flow from the anaerobic digester outlet pipe into the storage basin via gravity. The outlet pipe from the anaerobic digester into the storage lagoon should remain submerged at all times to prevent the escape of gases from beneath the digester cover. As such, it is not uncommon for the pipe to turn down and follow the direction of the inner slope of the lagoon to ensure submergence during times when the lagoon liquid level may be low due to normal pumping and irrigation activities. 7) Biogas Conditioning System Anaerobic Digester System O&M Page 7 of 16 The Biogas conditioning system receives biogas from the anaerobic digester and removes moisture from the biogas by means of compression and heat exchangers. This system will be managed by a 3rd party, but the information is included in this O&M for reference. The biogas from the anaerobic digester is commonly at 100% relative humidity; the biogas is purported to be near 6% relative humidity after going through the conditioning system. The moisture that is removed should be directed back to the digester mixing pump station or other suitable reception pipe for proper management of the condensate. During normal operation, the conditioning system should run without any need for input from the system operator. Audible and visual alarms will indicate issues with the system. The discharge pressure and flow rate can be manipulated by the operator through adjustment of the pressure regulator on the bypass line and through adjustment of the variable frequency drive. The automatic shutoff feature, whereby the operator can set the vacuum pressure shutoff point. As the biogas conditioning skid approaches this setpoint, it will automatically reduce blower or compressor speed to seek a flowrate that matches the biogas production. If the vacuum pressure exceeds the setpoint, the biogas conditioning skid will shutdown and trigger an alarm to the operator via telemetry system. 8) Flare During normal operation, the flare located at each farm should not necessary. In times of need, such as catastrophic failure of the biogas conveyance pipeline, the flare may need to be operated to consume excess accumulated biogas from the digester. The flare is not an automated system, and the Operator must articulate the biogas piping control valving to direct biogas from the digester to the flare, and ignite the flare. Care must be taken by the Operator in igniting the flare, as biogas is highly flammable. Each flare also has a condensate trap manhole. Contained inside is a small PVC drain pipe and PVC drain valve. The PVC drain valve should remain closed at all times unless the Operator is removing condensate. Should the valve be left open, biogas will escape from the piping. Periodically, and at a frequency determined appropriate by the Operator, these condensate traps will be opened momentarily to drain and remove any condensate collected in the piping. It is recommended that the condensate drain valve only be opened when the biogas piping is pressurized, as should the valve be opened under no pressure, ambient air may enter the biogas piping and challenge biogas upgrading by the GUS. 9) Transfer Pump The transfer pump transfers accumulated effluent among available storage basins as the farm owner deems necessary to optimize effluent storage. The transfer pumps are simply and manually operated through use of a local disconnect. Under normal Anaerobic Digester System O&M Page 8 of 16 circumstances, the transfer pump will only be used periodically and infrequently by the farm owner. 10) Stormwater Removal Pump A stormwater removal pump is kept at each digester site in order to remove accumulated rainwater from the top of the basin cover. The pump can be powered by any standard 120v outlet that's available nearby, such as the accessory outlet installed adjacent to the digester mixing pump station. The pump should be placed in a low spot on top of the cover, and the pump outlet should lead to an appropriate area for stormwater discharge (on some sites, pipes have been placed to easily receive the pump outlet pipe, which leads to the natural stormwater drainage swales on the property). IV. Description of Anticipated Maintenance Once the system has been started up and is operating efficiently, very little maintenance will be required. Simple tests should be periodically performed to evaluate the performance of the wastewater treatment components, and the system components visually inspected daily. A well -operated, properly adjusted, system will exhibit the following visible signs of proper maintenance: • All pipes should be intact and watertight. • The pumps should be nearly silent with little to no vibration. • The anaerobic digester should be free of excessive accumulation of rainwater. • Accumulated rainwater may be removed with a portable sump pump. The pumped water may be discharged safely on adjacent vegetated areas, or used for a more beneficial purpose as permitted. • The anaerobic digester cover should be free of any tears, punctures, or failures. • There should be no strong odors coming from the digester or flare. • The storage basin should be clean and free of floating debris. The liquid should be clean and clear. A. Routine System Maintenance Instructions For optimum system operation and maximum treatment efficiency, daily maintenance is necessary. In addition to the daily maintenance, all mechanical equipment should be cleaned weekly and lubricated as often as needed, as specified in the operations and maintenance manual for each piece of equipment provided by the equipment manufacturer. The farm owner will need to periodically remove accumulated sludge from the anaerobic digester. Accumulated sludge may be removed via the anaerobic digester mixing pumps. To use these pumps for sludge removal, the system operator should cease mixing pump operation 48 hours prior to the date of desired sludge removal to allow for settling of heavier sludge to the pump inlet. A quick disconnect fitting is provided for each mixing pump that will facilitate the connection of the pump discharge to sludge application Anaerobic Digester System O&M Page 9 of 16 equipment as chosen by the farm owner, such as slurry tanks or umbilical hose application systems. All sludge applications should be done in accordance with the approved waste utilization plan and nutrient management plan for the farm or hauled via tanker to an approved application site by a contract sludge hauler. Typically, a small amount of sludge will need to be removed from the anaerobic digester every other year. The system operator can monitor sludge accumulation via the inspection ports on top of the digester cover. A pipe or gauge with graduated markings used to determine depth may be used to assess the sludge depth in the digester. Care should be taken when inserting the gauge or pipe to not apply excessive pressure or otherwise puncture the digester liner. Sludge accumulation should be assessed on an annual basis by the system operator. As the digester cover typically accumulates biogas, care should also be taken by the operator to remove as much accumulated biogas as possible prior to opening the inspection port and measuring sludge accumulation. As biogas production slows during cold weather, it is recommended that this measurement occur during the winter when biogas accumulation is at a minimum. After completion of sludge removal activities using the anaerobic digester mixing pumps, the operator should reconnect all fittings and piping as found prior to the sludge removal and re-engage the digester mixing pumps operation in accordance with the schedule and manner in which they had been previously operated. See Appendix C of this document for an operations and maintenance checklist (daily, monthly, quarterly, semi-annually, annually). B. Troubleshooting Refer to equipment O&M manuals as necessary, summarized below: 1. Influent Pump Station 2. Mixing Pump Station: 3. Effluent Pump Station 4. Biogas Conditioning System S. Transfer Pump: 4" Hog Manure Pump or 4" High Pressure Pump (Electric Pumps) 8" Flush Pump (Electric Pump) 4" Hog Manure Pump or 4" High Pressure Pump (Electric Pumps) N/A 3" Pump (Electric Pumps) See Appendix A for contact information for each system component. C. Emergency Protocols, Repair, and Replacement The O&M Manual kept onsite in the farm office building (or wherever farm records are kept for each farm) provides step-by-step instructions for field repair or securing the piece of equipment until qualified repair personnel arrive. This Manual contains emergency contact numbers for the repair or replacement of the supplied equipment in Appendix A. Anaerobic Digester System O&M Page 10 of 16 D. Warranty Information 1) Farm Site (1) Influent Pump Station: "GEA Farm Technologies... warrants to the original buyer and end user... that the parts of all equipment sold under the Company trademark are free from defects in material or workmanship for a period of twelve (12) months from the date of delivery of the equipment to the Purchaser... Any equipment used for commercial usage, commercial lease on one or more farms is warranted for a reduced period of thirty (30) days only." (2) Anaerobic Digester Liner and/or Cover: Workmanship: "Plastic Fusion Fabricators, Inc. hereby warrants that the linings installed by Plastic Fusion Fabricators, Inc. under this warranty shall be installed free from defects in Plastic Fusion Fabricators' workmanship. The warranty set forth in the preceding sentence (the "Workmanship Warranty") shall commence upon acceptance of the work and shall expire on the last day of a period of 1 year from said date..." Material: "AGRUAMERICA, Inc. (AGRU) warrants its material for a period of FIVE(5) Years, prorated, from the final project ship date when subsequently properly installed..." (3) Mixing Pump Station: "GEA Farm Technologies... warrants to the original buyer and end user... that the parts of all equipment sold under the Company trademark are free from defects in material or workmanship for a period of twelve (12) months from the date of delivery of the equipment to the Purchaser... Any equipment used for commercial usage, commercial lease on one or more forms is warranted for a reduced period of thirty (30) days only." (4) Effluent Pump Station: "GEA Farm Technologies... warrants to the original buyer and end user... that the parts of all equipment sold under the Company trademark are free from defects in material or workmanship for a period of twelve (12) months from the date of delivery of the equipment to the Purchaser... Any equipment used for commercial usage, commercial lease on one or more farms is warranted for a reduced period of thirty (30) days only." (5) Biogas Conditioning System (managed by 3rd party) (a) Biogas skid: "This warranty is valid for 30 months from the time the equipment is shipped from Unison's factory or 24 months from the date of startup, whichever occurs first." (b) Biogas Blower / Compressor: "The goods will be free of defects in material and workmanship for a period of twelv e (12) months from the date the goods are placed in use by the buyer or eighteen (18 ) months from the date of shipment, whichever shall occur first." (c) Chiller: "24 months from startup, not to exceed 30 months from shipping." (6) Transfer Pump: "GEA Farm Technologies... warrants to the original buyer and end user... that the parts of all equipment sold under the Company trademark are free from defects in material or workmanship for a period of twelve (12) months from the date of delivery of the equipment to the Purchaser... Any equipment used for commercial usage, commercial lease on one or more farms is warranted for a reduced period of thirty (30) days only." V. Provisions for Safety Measures Anaerobic Digester System O&M Page 11 of 16 A. Restriction of Access: No persons should enter any portion of the wastewater treatment system unless performing a repair or routine maintenance, and only then if accompanied by another person capable of performing life-saving activities should the need arise. No person should Enter a waste collection pit, pump station well, or any portion of the anaerobic digester unless all accumulated biogas has been removed via venting or other utilization and sufficient airflow has been directed to the workspace via fans, blowers, or other means. Personal safety is the responsibility of the person or organization conducting the work, and not specifically the responsibility of the farm owner or other associated equipment providers or construction contractors. B. Emergency Contacts: Information shall be posted at the gate and in the control room. (There will be no harmful chemicals used for the anaerobic digestion system). C. All equipment safety guards, warning labels, safeties, and warning alarms shall be kept in place and operational at all times. D. Keep and maintain all clearances as recommended by equipment manufacturers and as required by law. E. Keep all open flames and sources of combustion away from gas accumulations. Do not smoke near the gas collection, conveyance, or combustion components. It is recommended that any combustion source or open flame be kept to a minimum separation distance of 50 ft from the anaerobic digester cover. VI. Spill Prevention and Control Provisions A. Response to Upsets and Bypasses Including Control Containment and Remediation: Audible alarms will be provided at all controls stations. The Control System will provide remote alarms to alert operator of a problem should one occur. B. Contact Information for Operational Personnel, Emergency Responders, and Regulatory Agencies: Phone numbers for Emergency Responders and Remediation Agency numbers will be located by the computers and control systems in the control room. C. Facility Control Valves will allow operator to isolate Systems if a problem occurs. Anaerobic Digester System O&M Page 12 of 16 Appendix A: Contact Information Project Management and Equipment Service Providers: Management & Equipment CompanyProject Contact/Local Service Influent Pump Station Lee Brock Brock Equipment Company lee@ brockeguipment.com (252) 235-4111 Anaerobic Digester Cover Plastic Fusion Fabricators, Inc. Larry Hice Ihice@plasticfusion.com (256) 852-0378 Mixing Pump Station Lee Brock Brock Equipment Company lee@ brockeguipment.com (252) 235-4111 Transfer Pump Lee Brock Brock Equipment Company lee@brockeguipment.com (252) 235-4111 Flare ProPump & Controls Inc. Jeff McGuire Work: (843) 236-3996 Cell: (704) 658-8113 imcguire@propumpservice.com Mechanical Installation & Controls ProPump & Controls Inc. Jeff McGuire Work: (843) 236-3996 Cell: (704) 658-8113 imcguire@propumpservice.com Anaerobic Digester System O&M Page 13 of 16 Regulatory and other Agencies: Christine Lawson Animal Feeding 1636 Mail Service (919) 707-3664 Operations Program, Center, Raleigh, NC Div. of Water 27699-1636 Resources Anaerobic Digester System O&M Page 14 of 16 Appendix 6: Farm Operations and Maintenance Checklist Operator Present: Time/Date: Farm System Checklist: Mark Yes/✓ or No/X as applicable, fill in blanks where specified Manure Collection / Feedstock System Perform visual appraisal of waste collection system. Any visible signs of overflow or malfunctioning? Check influent pump stations. Any Alarms? Put each influent pump in "Hand". Operating normally? Any rattling or unusual noises from influent pumps? Any observed leaks or spills from pipes, fittings, or well? Test the alarm. Functioning? Excessive accumulation of solids or debris in well? Agitation system in need of operation? RECORD THE RUN HOURS FOR PUMP I RECORD THE RUN HOURS FOR PUMP 2 RECORD THE RUN HOURS FOR PUMP 3 RECORD THE RUN HOURS FOR PUMP 4 Digester System Perform visual appraisal of digester (walk around). Any visible signs of overflow or malfunctioning? Does the cover appear to be leaking gas / odorous? Any visible tears, rips, or holes observed in the cover? >10% cover area under stormwater/rainwater? Check mixing pump stations. Any Alarms? Put each mixing pump in "Hand". Operating normally? (not necessary if mixing pumps running during visit) Any rattling or unusual noises from mixing pumps? Any observed leaks or spills from pipes, fittings, or well? Excessive accumulation of solids or debris in well? Agitation system in need of operation? RECORD THE RUN HOURS FOR PUMP I RECORD THE RUN HOURS FOR PUMP 2 RECORD THE RUN HOURS FOR PUMP 3 RECORD THE RUN HOURS FOR PUMP 4 Biogas Skid Are there any alarms? Are there any fluid leaks observed? Check oil level — oil needed? Anaerobic Digester System O&M Page 15 of 16 Excessive vibration of noise? Are there any visible fluid leaks on skid or chiller? RECORD THE RUN HOURS FOR GAS COMPRESSOR Notes Anaerobic Digester System O&M Page 16 of 16 SAMPSON COUNTY, NORTH CAROLINA OWNER FAISON INVESTMENTS, LLC 915 BILL WILLIAMS RD. TURKEY, NC 28393 CIVIL ENGINEER CAVANAUGH & ASSOCIATES, P.A. PO BOX 11197 WINSTON-SALEM, NC 27116 1-877-557-8923 ELECTRICAL ENGINEER DAVID SIMS & ASSOCIATES, P.C. 108 GILES AVENUE, SUITE 100 WILMINGTON, NORTH CAROLINA 28403 (910) 791-8016 / (910) 395-5734 (FAX) SHEET INDEX C.1.1 - COVER & SHEET INDEX C.2.5.1 - PORK PLUS OVERALL SITE PLAN C.2.5.2 - PORK PLUS HYDRAULIC PROFILE C.2.5.3 - PORK PLUS SETBACKS C.3.1 - INTENTIONALLY LEFT BLANK C.3.2A - INFLUENT LIFT STATION DETAILS C.3.213 - LEVEL CONTROL DETAILS C.3.3 - MIXING STATION DETAIL C.3.4 - DIGESTER DETAILS C.3.4A - COVERED LAGOON DETAILS C.3.5 - EROSION CONTROL DETAILS C.3.6 - AREA 1000 MISCELLANEOUS DETAILS 1 C.3.7 - AREA 1000 MISCELLANEOUS DETAILS 2 C.3.8 - AREA 1000 MISCELLANEOUS DETAILS 3 EXISTING tfm IM+ co OO gm oe ue `_c� 0 ut6 fo fo X XT 0 gas ©7 GAS SYSTEM PROPERTY LINE LIMITS OF DISTURBANCE SEDIMENT FENCE MAJOR CONTOURS MINOR CONTOURS FORCEMAIN INFLUENT FORCEMAIN EFFLUENT FORCEMAIN TRANSFER FORCEMAIN PLUG VALVE SOLENOID VALVE REDUCER AIR RELEASE VALVE CLEANOUT MANHOLE GRAVITY MAIN STORM PIPE DITCH OVERHEAD ELECTRICAL UNDERGROUND ELECTRICAL UTILITY POLE TELEPHONE PEDESTAL UNDERGROUND TELEPHONE FIBER OPTIC PEDESTAL FIBER OPTIC FENCE TREE LINE WETLANDS APPROXIMATED WETLANDS BLUE LINE STREAM JACK AND BORE BORE PIT EXISTING IRON PIPE TEMPORARY ROCK CHECK DAM GAS MONITORING WELL SHRUB TREE LIGHT ROAD CENTERLINE EDGE OF PAVEMENT CHECK VALVE BIOGAS WELL PROPOSED LOD SF 25 FM — IFM — EFM — TFM — sv t eARV co GM OE 0 GAS Z 8 T1 I BEFORE YOU DIG! NC ONE CALL (TOLL FREE) 0 0 1� 0 (OR 1-800-632-4949) IT'S THE LAW! �.�`` VICINITY MAP SCALE- NOT TO SCALE raAVANAU G H Stewardship through innovation DATE: JULY 27, 2023 SHEET C.1.1 PROJECT NO. BE.19.006 / / // J I I � / (\ \ \ I ADJUST GRADING AS NEEDED TO \ I ALLOW SPACE FOR DIGESTER COVER \ I ANCHOR TRENCH AND FLAT AREA \ I FOR EQUIPMENT / WET WELLS (TYP.) \ / PROPOSED RAINWATER PUMP AND RAINWATER OUTLET SEE DETAILS 4/C.3.6 AND \ \ SHEET C.3.8 nD-2 --- \ r MS � \ I DRA P \ / \ D-5 I / ,� /N\ I FM ILS-6 1 / INV / B-3 D-7 VB I/ BAF B/1 e BIOGAS SKID / c e I— LC-1 // /— l INV//—_ --,\ \ > Table 1: Identification List Section I Description Quantity Unit Additional Info Gravity Waste Collection (GWC) GWC-I-PIPE 12" HDPE (DR 17) Gravity Collection Line 732 L.F. GWC-2-CO Cleanout 2 each Influent Lift Station & Forcemain (ILS) ILS-I-PS Influent Lift Station - - Table 2/C.2.5.1 and Detail 1/C.3.2A ILS-2-1NV 12" Digester Bypass Inlet - - Inv. 144.25' ILS-3-PIPE 12" HDPE (DR 17) Digester Bypass Pipe 29 L.F. ILS-4-1NV -------- ILS-5-FM 12" Digester Bypass Outlet --------------------- 8" HDPE (DR 17) Forcemain - ---------------------------- 583 - L.F. Inv.144.00' ILS-6-1NV 8" HDPE (DR 17) Forcemain Inv. Out - - Inv. 146.00' Digester (D) D-1-DIGESTER Proposed Digester ITable 4/C.2.5.1 and Sheet C.3.4 D-2-MS Mixing Station ITable 3/C.2.5.1 and Sheet C.3.3 D-3-PIPE 8" HDPE (DR 17) 52 L.F. D-4-SUMP HDPE Sump Box Mixing System Inlet Not used D-5-FM 6" HDPE (DR 17) Forcemain 30 L.F. D-6-PRA Pump Repair Area - - D-7-BAF HDPE Baffle (Underflow) - - Sheet C.3.4 D-8-B_AF D-12-SLG HDPE Baffle (Overflow) Sludge Removal Pipes (HDPE DR 17) No_t used 1201 L.F. 3 pipes at 40 L.F. each Level Control (LC) LC-1-INV Digester Inv. Out - - Inv. 148.06' LC-2-PIPE 12" HDPE (DR 17) Digester Outlet Pipe 301 L.F. LC-3-PS Level Control Station Not used LC-4-FM 6" HDPE (DR 17) Forcemain Not used LC-5-INV Lagoon Invert From Digester - - Inv. 144.00' LC-6-WW Level Control Wet Wel I - - Table 5/C.2.5.1 and Detail 2/C.3.2B LC-7-PIPE 12" PVC (DR 35) Digester Outlet Pipe 398 L.F. END OF ON -FARM /� PIPE \ / \ PROJECT AND o \ I \ / / \ — — \ / / \_ j _ _ —_-- _ — — — — J —Table 3: Mixing Station (Detail 1/C.3.3) Table 2: Influent Lift Station Detail 1 C.3.2 BEGINNING OF ALIGN `b- ° ( / ) / \ \ PROJECT, BIOGAS / / \ ✓ — _ — — — — / / " \ _ -PIPING BY ALIGN RNG lip— /\ \ ✓ / _ = — _ \ / \ / � �✓ / -- /PIPE ,, � p� / �-� -- —=�� /, �-__-� --_ �� \ QD / — I POWER POLES AND POWER LINES _ LC-6 I TO BE RELOCATED AS, END CAP M 0 WW \ \ I NECESSARY BY POWER COMPANY, o� r — �� I REFER TO ELECTRICAL PLANS / LC-7 PIPE \ gads --- --— — — — — — — __---___--- / ,X- / D-1 / DIGESTER NEW ANAEROBIC DIGESTER TOP OF DIKE 150.00' / /D-12 SLG D-3 1 \ 11 ENSURE SUFFICIENT PIPE o� COVER OVER PROPOSED / �'" I \------ — — — — — — — — — — — —/ 1 / / / // GRAVITY PIPE �°o 1-1 / � I � � � f � / ) � // Table 4: Digester Data Table / 1— I� j \\\ \\ r/ °�rn / / 10 Irri I I / M T, 03 m� /\\ jam— \\ /' -P. CID o� i\ oo /CY) ✓ / / /\ // \ j�' /// /�/ \ \\\ �n o7 /\\ m D / \ / rnz °'� m`D j�/ _/ \ /�z. \� o� of Finished Grade: 150.00 ft Rim: 150.50 ft Invert In: 141.00 ft Bottom of Dry Well: 140.50 ft Depth of Dry Well: 10.00 ft Selected Pump Rate: 1,000 (1 pump) gpm Pump Horsepower: 7.5 hp Electrical Supply: 240 V Electrical Frequency: 60 hz Phase: 10 Length: 210 ft Width 125 ft Top of Dike Elev: 150.00 ft Operating Level Elev: 148.31 ft Bottom Elev: 138.00 ft Total Volume: 190,214 cf Volume at Operating Level 148,972 cf S.A. @ Inside Top of Dike: 25,975 ftz Slope: 3:1 - Total Cut Total Fill Net Surplus 4,348 CY 2,421 CY 1,927 CY i�p .� z L3 U) //III f' \,Table 5: Level Control Wet Well (^ ALL 10 BARNS USE \ — _� Z / o I \ _ / \ 1 _ J 1 1 1 / 25% compaction factor used for fil l I FLUSH TANKS — ➢ _ _ P Z _ o w' — I r — — — \ L \ co o�,—I I .......... . _� 1 1 1 / \\ / / \ IIIII II —I o o r /� /J 1 1 / Farm Information III III 1 1 o ILS-1 \ --- _ /---- = ��__-- i — 1 0 PS \ _ g , , _ oo / GWC-2 \ / -- �� B -- \ <'\ /� COI1 I\ \ B Farm Name: Pork Plus Permit Number: AWS820025 Permitted Capacity: 4,200 Finished Grade: 146.00 ft Rim: 147.00 ft Invert In (From South): 139.00 ft Invert In (From North): 139.00 ft Bypass Riser: 146.00 ft Bypass Invert Out of Wall: 144.25 ft Bottom of Wet Well: 137.00 ft Depth of Wet Well: 10.00 ft Design Flow: 300 gpm Selected Pump Rate: 560 (1 pump) gpm Total Dynamic Head (TDH): 20 ft Pump Horsepower: 10 hp Pump Speed (RPM): 1,760 RPM Electrical Supply: 240V Electrical Frequency: 60 hz Phase: 10 Impeller Diameter: 8 in. Motor Type: TEFC Selected Pump: GEA Pump Model: 4" Hog Shaft Length: 10 ft. Finished Grade: 150.00 ft Rim: 150.50 ft Invert In: 143.00 ft Invert Out: 147.56 ft Bottom of Wet Well: 142.50 ft Depth of Wet Well: 8.00 ft GM 8--- GWC-1 --- - --ao- PIPE I /I \ oAA ILS-1 I 1 1 1/ --�// LC-5 ILS-3 INV PIPE I Ls- 4 I I to INV L— -- ,� EXISTING LAGOON TOP OF DIKE 145.00 FREEBOARD 144.00' \ \\ �\ \\ �' I I I / rrt / \ \ — \ \ \ — — / / // / /✓ / / — l / \ NOW OR FORMERLY -- I \ \ \ FAISON INVESTMENTS SAMPSON CO. PIN: 18010287601 -------- —--_— DB 1355 PG 97IIII/ ll/JI __,_ — / / / / / // �// /� � /' -- \ \✓/ \ \ /' // — \ \ \ \ \ I / / PROPOSED APPROXIMATE 120 LF OF 4 I ( // HDPE DR11 MIN. BIOGAS LINE I \\��\ \ \ 1 / \ \ / / \ \ \ \ --' / / / \\\�' WETLANDS \r\� � \ DIRECTIONAL BORE UNDER STREAM AND ` L WETLANDS\ Lij � z J Cn 0 r^ U v J O O z m z O U z 0 QOL OL ZE 7� L 0 U� 0- SHEET NUMBER C.2.5.1 o 0 CN " w �— O N m Q_ CL co �Z > > Q J a CL Z a U W N : J^ = / DUE TO METHODS OF REPRODUCTION. I` o U vi C O O ZZ h U ro O� ro U N Lo ri 160 160 NOTE: PER THE NRCS 366 ANEROBIC DIGESTER STANDARD, N RAINFALL IS INCLUDED IN DETERMINING THE OPERATIONAL VOLUME OF THE DIGESTER. THE NOAA z ATLAS 14 30YR NORMAL RAINFALL DATA FOR THE AREA HAS BEEN USED TO DETERMINE THE 25-YEAR, 24-HOUR RAINFALL ON THE DIGESTER. WITH THIS DATA, c� THE OPERATIONAL VOLUME FOR THE DIGESTER DESIGN �•J AT THIS SITE IS BASED ON 12-INCHES OF STRUCTURAL FREEBOARD PLUS 7.5 INCHES FOR THE 25-YEAR, 24-HOUR RAINFALL EVENT TO DETERMINE THE 20.28 15 5 INCHES OF FREEBOARD FOR THE DIGESTER. 155 r^�� k "/ / U m PROPOSED LEVEL CONTROL Q. WET WELL (LC-6) TOD: 150.00' U 8" MIXING STATION (SEE DETAIL 1 /C.3.3) HDPE COVER (TYP) Q RIM:150.50' RIM: 150.50' EMERGENCY BYPASS TO 150 4" INFLUENT LIFT STATION EXISTING LAGOON 150 RISER INV. 146.00 (SEE DETAIL 1/C.3.2A) WALL INV. 144.25' (ILS-2) OUTLET OL: 148.31' INV: 148.06' #��4 5 - C-1) _ (LOUTLETJ--­.� RIM: 147.00 DRY WELL INV: 147.56' LLJ BARN #1 BARN #2 BARN #3 BARN #4 BARN #5 BARN #6 BARN #7 BARN #8 BARN #9 BARN #10 �F�F� Co FFE: 146.00' FFE: 146.00' FFE: 146.00' FG: 146.00' FFE: 146.00' FFE: 146.00' FFE: 146.00L FE: 146.00' FFE: 146.00' FFE: 146.00' FFE: 146.00'A AA AA o � 7�0� P�pF z I,I I I II II I I I I I I I I II II F MN TOD: 145.00' �cr at_�co�22x)eO4 U_ � J INV: 146.00' Op145 45 /p!t�� (ILS-6) INV: 145.00 INV: 144.00' p (LC-5) FB: 144.00' PROPOSED DIGESTER INV: 143.00 Q0 cr I WET WELLJ� z INV: 142.50' EMERGENCY BYPASS FROM pl�plJ I I INV: 142.50' BOTTOM: 142.50' U INFLUENT LIFT STATION-8" PUMP RETURN INV. 144.00' (ILS-4)ct �y INV: 141.00 O ° MAN S Op�FR OSEO HEApER U � 140 S\ OPE) BOTTOM: 140.50' SOUTH F) (0 5 ° MAN NORTH 140 CL INV: 139.00' INV: 139.00' BOTTOM: 139.00' EXISTING LAGOON 7I L BOTTOM: 137.00' 0 135 TOD: TOP OF DIKE 135 SHEET NUMBER TOB: TOP OF BANK FFE: FINISH FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE OL: OPERATING LEVEL BOTTOM: 132.60' NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE 130 APPROXIMATED BASED ON BEST 130 AVAILABLE SURVEY INFORMATION N 0 C) O 0) CN O CNCN m U U z � Z W Z W 125 125 CL N : J^ 1 1 1 \ 1 -- ` NOW OR FORMERLY JONES FLOYD LEE NOW OR FORMERLY 1 - - - - - - - SAMPSON CO CLARIDA, LINZAI PIN:18012788602 \/ / SAMPSON CO PIN:18021946001 1 - 1 1 DEED: 911 /518 DEED: 1733/198 /:�:;:� \ NOW OR FORMERLY \ NEWMAN, DORA C. SAMPSON CO 1 PIN: 18074288001 / 1 1 DEED:937/19 , / I I NOW OR FORMERLY I I\ NOW 0 FORMERLY RICHMOND, ARLENE TURNER � OLIVER, WILLIAM SCOTT SAMPSON CO PARLENE TURNER I SAMPSON CO. PIN: 18075809002 / NOW OR FORMERLY DEED: N AI DEED: N: 1 / MCCALOP, ESSIE, MRS., EST. I / / \ /88 SAMPSON CO PIN:18065548001 1 I 1 DEED: N/A 1 1 \ I NOW OR FORMERLY / CROMARTIE, JAMES V., JR / SAMPSON CO PIN:18024668001 1 \ DEED:1885/455 NOW OR FORMERLY NEWMAN, DORA C. SAMPSON CO 1 ( I PIN:18025659002 / / I DEED:813/534 \ ` I \ \ 1 � \ / 1 NOW OR FORMERLY 1 1 I LUCAS, HENRY PRESTON JR SAMPSON CO PIN:18112980001DEED: 1394/660 \ 1 1 FARM OWNER TO OBTAIN PROPERTY LINE SETBACK \ / / 1 WAIVER FROM PROPERTY OWNER \ I / / NOW OR FORMERLY / MCCALOP, ESSIE, MRS., EST SAMPSON CO PIN:18065548001 DEED: N/A \ 500' DIGESTER SETBACK / \ \ FROM PROPOSED DIGESTER \lo- \ \ \ \ 0 U C NOW OR FORMERLY OLIVER, WILLIAM SCOTT - SAMPSON CO _ ro PIN:18075808001 DEED:1532/444 1 M 1 / Lo NOW OR FORMERLY 0 FAISON, DEXTER A / SAMPSON CO \ PIN:18033360001 - `' DEED:1038/43 N c/) ro Ll 1 / \ NOW OR FORMERLY \ \ \ \- -JONES FLOYD LEE JR SAMPSON CO \ ' PIN:18084324002 \DEED: 1676/877 Q. I / � U NOW OR FORMERLY Q HINES, JAMES L III SAMPSON CO PIN: 18045604001 DEED:07E/404 \ \ \ TOP OF DIKE �, \ \ NOW OR FORMERLY \ \ / FAISON INVESTMENTS LLC SAMPSON CO. PIN: 18010287601 DEED: 1335/97 cr o \ NOW OR FORMERLY / U V GOODSON & WELLS FARMS, INC.. C� � I u� NOW OR FORMERLY \ 1 SAMPSON CO. PIN: 18019580017 Q or N/A. N, / 1 DEED: 1960/312 O J U / \ SAMPSON CO PIN: N/A CL- Q \ DEED: N/A / \ co co C \ / \ Llj NOW OR FORMERLY _ / \ / GOODSON & WELLS FARMS, INC.. 1 9,>, SAMPSON CO. PIN: 18019437003 / EXISTING 4" WELLS TO \\ DEED: 1960/312 1 \ / - BE ABANDONED AND �� FARM OWNER TO OBTAIN \ RELOCATED O PROPERTY LINE SETBACK WAIVER \ z CA- C) Q 0- Q FROM PROPERTY OWNER NOW OR FORMERLY LUCAS, HENRY PRESTON JR SAMPSON CO PIN:18112980001 DEED: 1394/660 / \ STORAGE 1,500' RESIDENCE SETBACK \ BUILDING FROM PROPOSED DIGESTER I \ \ TOP OF DIKE SHEET NUMBER � NOW OR FORMERLY / \ LUCAS, HENRY JR I / / NOW OR FORMERLY i C.2.5.3 SAMPSON CO PIN:18012605106 / HD3 FARMS OF THE CAROLINAS, LLC \ \ DEED: 1841/995 - / SAMPSON CO PIN: 18012605109 \ DEED:1842/01 \ I / _ -� `� / - / NOW OR FORMERLY \ \ I co GOODSON & WELLS FARMS, INC.. N o 0 \ 1 I SAMPSON CO. PIN: 18015850801 •• I o 6 - I NOW OR FORMERLY \ DEED: 1960/312 1 I N O r" CARROLL'S REALTY PARTNERSHIP \ / I I m U U z SAMPSON CO. PIN: 18012605108 CL CL cn ' Q DEED: 1325/989 l� J UNOCCUPIED I 1 I W Y RESIDENCE \\ W v a NOW OR FORMERLY \ \ 1 I Q W = U \ / LUCAS, HENRY JR / �' / \ o CL o U N SAMPSON CO PIN:18012605107 / \ / DEED: 1841 /995 - - - - 2,500' DIGESTER SETBACK / ••b� FROM PROPOSED AERIAL FROM IMAGERY IS 2021 CONFIDENTIAL THESE PLANS CONTAIN INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO CAVANAUGH & ASSOCIATES, P.A. DO NOT COPY, REPRODUCE, NOR DISTRIBUTE IN WHOLE OR PART L3 � z OC) O U m z O OL D_ ZE zQ_ OC) SHEET NUMBER C.3.2A n N O (.0 C) N aj m U cn J � 0 Z cl- c� 7 Z U U W __j z O O c0—nw� U W J J aWN ZOE z O U Z b' C) Ld z cn Q LEVEL CONTROL WET WELL DETAIL 2 SCALE: NOT TO SCALE C.3.2B Q Ltj z SHEET NUMBER C.3.2B n N o Q0 � CN aj n LLi m (3 cn J C 0 Z CL C� 7 a Z U C) U U W __j U) z C; C) Ld z cn Q o U C OO *� O O U ca 00 O � N L3C/)10 'Z T — / m Q �i ro U O h Q SHEET NUMBER C.3.3 N o Q MIXING STATION N 0 DETAIL , m z SCALE: NOT TO SCALE C.3.3 J O Q Q C Z Z U W 7 U __j a C) U I U) WHOLE OR PART INFLUENT HEADERS - PIPE DETAIL DETAIL SCALE: NOT TO SCALE C.3.4 CN a� Q m c z o � � cn J 0 Q C Z z 7 U w � o a o v vvi CONFIDENTIAL THESE PLANS CONTAIN INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO CAVANAUGH & ASSOCIATES, P.A. DO NOT COPY, REPRODUCE, NOR DISTRIBUTE IN WHOLE OR PART INFLUENT HEADERS - PIPE DETAIL DETAIL SCALE: NOT TO SCALE PLAN VIEW ANTI —SEEP COLLAR (,TYP.1 DETAIL r6 SCALE: NOT TO SCALE C.3.4 CONFIDENTIAL THESE PLANS CONTAIN INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO CAVANAUGH & ASSOCIATES, P.A. DO NOT COPY, REPRODUCE, NOR DISTRIBUTE IN WHOLE OR PART SHEET NUMBER C.3.4A N o CN o Q w O m c z J C 0 Z Q_ O � cn Q o Q 7 a z � o U v w � (0 L`OU %. z CONTROL MAINT. SCHED. DETAIL 6 SCALE: NOT TO SCALE CONFIDENTIAL THESE PLANS CONTAIN INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO CAVANAUGH & ASSOCIATES, P.A. DO NOT COPY, REPRODUCE, NOR DISTRIBUTE IN WHOLE OR PART 17 0 ci Q O Q �I Q z J z ci:� O _ � O � co � O O U Q_ Q z � � O Z QL W O� SHEET NUMBER C.3.5 N o N O o� C) w " O m U Z J � � Z CL O � co Q W o - a 0 o V v Q) 16 . Mw~ W w V Q W _zOEo ` O U z Lij Q z_ (� J o C Q W �� O � z C � 20 � W O Ld z 0 Z OL ZE QQ CL Ld Ld , U OC) SHEET NUMBER C.3.6 N O N o aj p W " O m o c z a Z Oco o 7 a Z O o U v W � vvi w Z PLANS CONTAIN INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO CAVANAUGH & ASSOCIATES, P.A. DO NOT COPY, REPRODUCE, NOR DISTRIBUTE IN WHOLE OR PART Lij Q J 0 ` V Q r n v J J LLJ co U z W W �z ZE J � W U z (� Z � OC) SHEET NUMBER C.3.7 n N �o O o C) w " o m U c z J 0 a- U � co Q cl� z 0 7 U J (I- Q0 c) I I J N ;� ;•••J THESE PLANS CONTAIN INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO CAVANAUGH & ASSOCIATES, P.A. DO NOT COPY, REPRODUCE, NOR DISTRIBUTE IN WHOLE OR PART n N O N N W z 7 w Zoo v—iw~ LEA U) U Q J J N Q LLA ZwZ if o H U O Z FI, 1. V Im ON 10 �y J O U I- z a O U z 0 U) ZE z_ J OL 0 rz 0 O n LN ON 4 0LLJ 0 O � WLLJ cl:�z Q� J W U SHEET NUMBER C.3.8 0 O W m UL UL O > z 0 W 7 z U W O J a C) (j N Cot i