Loading...
HomeMy WebLinkAboutNCC216216_NOT Closeout Documents_20230725 City of I300 W Crowell Street, Monroe, 011IU0 e ee , on oe, NC 281 12 Engineering monroenc.org • 704-282-4500 • Po Box 69,Monroe, NC 281 1 1 7/18/2023 CERTIFIED MAIL RETURN RECEIPT REQUESTED Blair Construction, Inc. Attn: Brian Nichols P.O. Box 612 Gretna, VA 24557 RE: Project Name: James River Equipment -2112 Morgan Mill Road Project ID: PREN202100162 County: Union Mr. Nichols, This letter is to serve as notice that the City of Monroe is releasing your erosion and sedimentation control bond. The above referenced site has permanent ground cover sufficient to restrain erosion. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01 ) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Enclosed you will find the original bond documents as we received them. If you have any questions please contact Zach Ross at 704-282-4583 or Lross@monroenc.org. Sincerely, Zach Ross Construction Inspector II RECEIVED JUL 2 0 2023