HomeMy WebLinkAboutSW5221102_email_20230412
Peck, Kaitlin
From:Farkas, Jim J
Sent:Wednesday, April 12, 2023 3:40 PM
To:twhite@pintailofs.com; eaverette@stocksengineering.com
Cc:Valentine, Thad
Subject:RE: SW5221102 Bryson's Ridge Subdivision - Phase 2
As of today, April 12, 2023, we have not received a resubmission to address the below comments. Please provide the
requested information or request a resubmission extension by close of business on 4/19/2023 or the project will be
returned due to inactivity.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: Farkas, Jim J
Sent: Thursday, February 23, 2023 3:54 PM
To: twhite@pintailofs.com; eaverette@stocksengineering.com
Cc: Valentine, Thad <thad.valentine@ncdenr.gov>
Subject: RE: SW5221102 Bryson's Ridge Subdivision - Phase 2
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
th
Management Permit Application for the subject project on November 28, 2022. A review of that information has
determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If
you have any questions, please feel free to contact me. My contact information is listed below.
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
1
Jim.farkas@ncdenr.gov
From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>
Sent: Monday, November 28, 2022 11:03 AM
To: twhite@pintailofs.com; eaverette@stocksengineering.com
Cc: Valentine, Thad <thad.valentine@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Subject: SW5221102 Bryson's Ridge Subdivision - Phase 2
Good morning,
We received your post-construction stormwater permit application for the above mentioned project on 11/28/2022.
Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per
statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SW5221102
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
Margie DeBerry
Environmental Specialist, Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9209
margie.deberry@ncdenr.gov