Loading...
HomeMy WebLinkAboutSW5221102_email_20230412 Peck, Kaitlin From:Farkas, Jim J Sent:Wednesday, April 12, 2023 3:40 PM To:twhite@pintailofs.com; eaverette@stocksengineering.com Cc:Valentine, Thad Subject:RE: SW5221102 Bryson's Ridge Subdivision - Phase 2 As of today, April 12, 2023, we have not received a resubmission to address the below comments. Please provide the requested information or request a resubmission extension by close of business on 4/19/2023 or the project will be returned due to inactivity. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Thursday, February 23, 2023 3:54 PM To: twhite@pintailofs.com; eaverette@stocksengineering.com Cc: Valentine, Thad <thad.valentine@ncdenr.gov> Subject: RE: SW5221102 Bryson's Ridge Subdivision - Phase 2 Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater th Management Permit Application for the subject project on November 28, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 1 Jim.farkas@ncdenr.gov From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Monday, November 28, 2022 11:03 AM To: twhite@pintailofs.com; eaverette@stocksengineering.com Cc: Valentine, Thad <thad.valentine@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW5221102 Bryson's Ridge Subdivision - Phase 2 Good morning, We received your post-construction stormwater permit application for the above mentioned project on 11/28/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW5221102 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 2 3