Loading...
HomeMy WebLinkAbout- 7/26/2023 2:24 PMmr-1 irucAnexfor major novelopmout Permit (last revised 12127106) North Carolina DIVISION OF COASTAL. MANAGEMENT T. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Albemarle Plantation Property Owners Association Albemarle Plantation Manna Expansion/Breakwater Applicant 1: First Name MI Last Name Lee B Duncan Applicant 2: First Name MI Last Name N/A NIA NIA If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1 Plantation Drive NIA Hertford NC ZIP Country Phone No. FAX No. 27944 USA 252 - 426 -1128 ext. NIA - - Street Address (if different from above) City State ZIP same as above - Email lee.duncan@albemarleplantation.com 2. Agent/Contractor Information Business Name NIA Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 . Contractor # Phone No. 2 . ext. - ext. FAX No. Street Address (if different from above) City State ZIP Email CForm Continues on back> 252-808-2808 . 1.888-4RCOAS'T .. www.nccoastalmonagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Perquimans 421 Albemarle Blvd Subdivision Name City State zip Albemarle Plantation Hertford NC 27944 - Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 426 - 4037 ext. NIA, I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank River Basin Yeopim Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑unknown Yeopim River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Perquimans County 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 3380 linear feet 580 Acres c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 6000 sglft, 1 acre, NWL (normal water level) (if many lot sizes, please attach additional page with a list) 10 ❑NHW or ®NWL e. Vegetation on tract Upland: Pinus teeds, Quercus sp., Canya sp., Liquidambar styraciflua, Diosppyros sp. Forested Wetland: Tasodium distichum, Nyssa sylavtica, Acer rubrum. f. Man-made features and uses now on tract 18-hole golf course, clubhouse and associated appuratures, single family and multifamily residential structures, existing marina. g. Identify and describe the existing land uses adjacent to the proposed project site. Adjacent land use is single family residential. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Transitional (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? Dyes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ❑NA If yes, by whom? see orginal permit #58-59 I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next pages 252-808-2808 :. 1-888-4RCOAST :: www.necoastalmanaegement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (1) or (ii) above, has a delineation been conducted? ®Yes ❑No fAttach documentation, if available) n. Describe existing wastewater treatment facilities. Lagoon with spray system o. Describe existing drinking water supply source. Perquimans County Water Department p. Describe existing storm water management or treatment systems. Existing infrastructure consistent with the subdivision permits. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑PubliclGovernment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The marina expansion is needed to accommodate the increased number of transient boaters and to allow for a number of slips for the construction of Phase it of Albemarle Plantation. The dredging is required due to boats utilizing the facility that are larger than those originally occupying the Marina. The channel has silted in compared to the original construction existing water depths. Increased storm activity and marina utilization has shown a need for a breakwater. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The marina expansion will use typical piling installation equipment, back hoe, wash down pumps, barge, etc. The dredge spoil areas will be an upland area with safeguards to prevent introduction into waters or wetlands. All equipment will be stored on an upland site. d. List all development activities you propose. Marina development, Dredging, and Breakwater construction. Additional 325 foot long, 10 foot wide pier with 500 square foot T head and 12 finger piers, and 800 linear feet of breakwater. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f, What is the approximate total disturbed land area resulting from the proposed project? 3 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No ®NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. Form continues on backs 252-808-2808 11-888-4RCOAST .. www.nccoastalrnanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit B. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name John J. Hendrickson Phone No. 571-230-9135 Address 143 Country Club Drive, Hertford, NC 27944 Name Walter 5chriefer Phone No. 828-702-2960 Address 188 Beech Point Drive, Hertford, NC 27944 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. include permit numbers, permittee, and issuing dates. CAMA Permit 58-59, HPB Enterprises, 11/20/1989 CESAW-0089-N-072-0027, HPB Enterprises, 11/29/1989 CAMA Permit 109-03, HPB Enterprises, 08/05/2003 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j, A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date July 26, 2003 Print Name Lee ncan Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures information 252.808.2808 — 1-888-4RCOAST .. www.nccoastaimanagement.net N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: 1A+k 1wrT0JV lwmri Nllso Su-to*voo Address of Property: ID Mailing Address of Owner: t S ,r` kmoLo i` C 271 Owner's email 6.46 Ou0�� Owner's Phone#: 20ft *` 4 +ji►Z,,$ ar1E pla�wl�w1�+� .Cn+�+► - .. Agent's Name: Agent Phone#: Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom. portion to be completed by the Adiacent Property Owner) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing,with dimensions must be rrovided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 401 S. Griffin St., Ste. 300, Elizabeth City, NC, 27909. DCM representatives can also be contacted at (252) 264-3901. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, YOU must sign the appropriate blank below.) DO wish to waive some/all of the 15' setback am ,�Ugnature of Adjacent Riparian Property owner I do not wish to waive the 15' setback requirement (initial the blank) Signature of Adjacent Riparian Property Owne Typed/Printed name of ARPO: Olkf4 Mailing Address of ARPO: VV);.-Ooxrw 4 r 'V 1710 �r ARPO's email: . ARPO's Phone#: Z.3 ' GD wt Date: C �1� '.�0 'waiver is valid for up to one year from ARPO's Signature* Revised July 2021 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: ,( 1�l gwitJk a,.., ft .,...... � Address of Property: t O&VP G 2-7 Mailing Address of Owner: UA Lu4swc* DeAve i A1r4U-1 dl1,D t M 4. '1.11144 Owner's email: Lec.&w *,Q Owner's Phone#: -4u— u zo Agent's Name: Agent's Email: Agent Phone#: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom ortion to be com leted bV the Adjacent Prol2e Owner) I hereby certify that I own property adjacent to the above referenced property, The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawin with dimensions must be Provided with this letter. V 100 NOT have objections to this proposal, I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 401 S. Griffin St., Ste. 300, Elizabeth City, NC, 27909. DCM representatives can also be contacted at (252) 264-3901a No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setback " signature of Adjacent Riparian Property Owner do not wish to waive the 15' setback requirement (initial the blank) 4� Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Mailing Address of ARPO: LOA L 09t 4 ",Lpi F r r1 ARPO's email: ARPO's Phone#: �* t !•' Date: �i waiver is valid for up to one year from ARPO's Signature* Revised July 2021 9 N I SCALE: 1 100' EXISTING 6x12'STRUCTURE INCORPORATES STORAGE AND ELECTRICAL PANEL FOR THE MARINA 4..� '00, SCALE: 1 " = 100' NEW 5-SIDED STRUCTURE DECKING APPLIED ON EXISTING PILES 'OSED 12x12' STRUCTURE TO to DMMODATE DOCKMASTER'S :�E WITH INTEGRATED STORAGE. RATIONAL GOALS PROVED VISIBILITY & SAFETY )DITIONAL STORAGE :CURE (LOCK) INFRASTRUCTURE --aa 07 li - N %a SCALE: 1 " = 50' op 4w NEW 5-SIDED • �` STRUCTURE • DECKING APPLIED • ON EXISTING PILES . w ' PROPOSED 12x12' STRUCTURE TO • ACCOMMODATE DOCKMASTER'S OFFICE WITH INTEGRATED STORAGE. OPERATIONAL GOALS • IMPROVED VISIBILITY & SAFETY • ADDITIONAL STORAGE • SECURE (LOCK) INFRASTRUCTURE • t� r� i N SCALE: 1 " = 100' ADDITIOW SLIF PROPOSED BR �I i h, h, Dredin The original marina design was predicated on the fact that no dredging would be required for its installation. This fact corresponds to the requirements of CAMA for new marinas. Unfortunately, over the past 30 years the water depth in the navigable areas of the marina has been reduced limiting navigation in and around the marina and limiting the use of existing slips. This proposal requests funding for dredging in areas of the marina that have had significant "silting" since the marina was built. Several areas in and around the marina need to be dredged to return the marina to the function originally designed and permitted to. They are: • In several instances the decrease in navigable water in and around C and D docks presents a hazard to approaching the fueling dock with larger boats from time to time going aground. • The depth of water between C and D docks has been reduced to a point where sailboats and larger boats cannot use the slips on the north side of C dock. • The water depth at the fuel pier has also been reduced slightly • The water depth south of A dock has been significantly reduced since the original construction of the marina. This dock has the deepest water and the shallow water to the south restricts maneuvering of larger vessels. This reduction also impacts the installation of many wave attenuation systems. zo-2.9 3.o-3.9 4. o-4.9 s.o-s.9 6.0 6.9 7.o-7.9 225 �IIII Thls chart should nat 6e used for navigational purposes. Figure 1-Marina Hydrographic Survey y r '/ d-A� I r S r i/ rn �. 6 _ s W• ,. � � j Il•J III i `` ``� `, � _C ••� D-"�__ p rain_•• � f ,V�� [N �, c��• r i \ Figure 2 - CID dock Figure 3 - South of A dock Figure 2 and 3 indicate the areas to be dredged. The dredging is intended to return the operational depth to the original depths at the time of construction and original CAMA permitting. We estimate that we need to remove: • 1,250 cu yards of material between C and D docks (Figure 2) • 1,400 cu yards of material at the approach to and in front of the fuel dock (Figure 2) • 1,450 cu yards of material south of A dock (Figure 3) Based on recent soundings conducted be experienced hydrographic surveyors (Figure 1), we are estimating that 4100 cu yards of dredge material will be required to return the marina to its original operational depths. At an average cost $10 a cu yard for hydraulic dredging, the cost is estimated to be $41,000. It is assumed that hydraulic dredging costs between $5 and $20 per cu yard with most estimates indicating between $4 and $8 per cu yard. Dredging can be covered by grants to at least a level of 50%. Based on the time frame that has expired since the original marina construction, a Major Development Permit is required. Any significant work at the marina will require a Major Permit. As a result, it is judicial to apply for a permit that includes as much major work as possible so that grant money can be requested and then the scope of work be altered to fit the funding and operational considerations. The proposed dredging would: • Provide a safe approach to the fuel dock for larger vessels • Allow larger vessels to fuel • Allow for increased use of slips on C dock for larger power boats and sail boats • Allow navigational and maneuvering room for larger vessels at A dock • Allow for the future installation of a wave attenuation system south of A dock Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 9. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑PubliclGovernment OPrivate/Community c. (i) Dock(s) and/or pler(s) (ii) Number 1 (iii) Length 325 ft (iv) Width 1 o ft (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes MNo If yes: (ii) Number 1 (iii) Length 60 (iv) Width 8 (v) Floating []Yes ®No Nate: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 36 (ii) Number of slips existing 160 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel 00pen water; no dredging required ❑Other; please describe: k. Typical boat length: 35 ft m. (i) Will the facility have tie pilings? ®Yes ❑No (ii) If yes number of tie pilings? 11 ❑ This section not applicable b. (i) Will the facility be open to the general public? MYes [:]No d. (i) Are Finger Piers included? ®Yes ❑No If yes: (ii) Number 12 (iii) Length 30 ft avq (iv) Width 3.5 ft (v) Floating ❑Yes ®No f. (i) Are Boatlifts included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ® Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). mixed types - sailboat - trawler - yacht - open runabout I. (i) Will the facility be open to the general public? ®Yes ❑No m8ti8-� ti 11-8 t84RCOAS :: wr4w.necoastalmanastement.net reprised:/2127106 Form DCM MP-4 (Structures, Page 2 of 4) 12. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ® Toilets for patrons: Number: 4; Location: Dockside Cafe building - approx. 200 yards from Dockmaster office ® Showers ® Boatholding tank pumpout; Give type and location: Mechanical Pump Out located at end of T" Dock b. Describe treatment type and disposal location for all sanitary wastewater. Lagoon with spray system c. Describe the disposal of solid waste, fish offal and trash. dumpster and haul off d. How will overboard discharge of sewage from boats be controlled? all vessels arriving are inspected by local marina officials for waste management purposes e. (i) Give the location and number of "No Sewage Discharge" signs proposed. 2 located on main dock and fuel dock (ii) Give the location and number of "Pumpout Available" signs proposed. 2 located on main dock and fuel dock f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. nla g. Where will residue from vessel maintenance be disposed of? nla h- Give the number of channel markers and "No Wake" signs proposed 9 i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. Fueling station is located on the end of "C" dock and trained team is available. j. What will be the marina policy on overnight and live -aboard dockage? Allow transient overnight stay and live -aboard options per AP Marina Policy k. Describe design measures that promote boat basin flushing? Marina design allows for free flow of Yeopim Creek waters I. If this project is an expansion of an existing marina, what types of services are currently provided? Boat Slips, Fuel, pump -out, power, water, wifi, bathrooms, showers, laundry m. Is the marinaidocking facility proposed within a primary or secondary nursery area? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.necoastalmanagefnent.not revised- 12/27106 Form DGM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlandslmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None p, Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ® This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑ This section not applicable a. Length 800 linear feet proposed b. Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands S, MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑PubliclGovernment ❑Private/Community c- Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL 252-808-2808 :: 1-888-4RCOAST -- www.necoastatmanagement.net revised: 12127106 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. Single family homes 500+ yards on either side Single family homes 500+ yards on either side Note, For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body unknown e. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 6 ft avg 8. OTHER ❑ This section not applicable a. Give complete description: Proposed marina development includes new pier, dredging and breakwater addition. The proposed pier addition is 325 foot long, 10 foot wide, with 500 square foo T head and 12 finger piers. Proposed breakwater is 800 linear feet of floating breakwater sections to reduce wave action in the Marina. Dredging is proposed to maximize Marina slip availability. Date 07/26/2023 Project Name Albemarle Plantation Marina ExpansionlBreakwater Applicant Name Lee Duncan - Senior General 11anager Applicant Signature 252-808-2808 :: 1-888-4RCQAST z: www.nccoastalmanagarnent.not reprised: 12/27106 Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this farm to Joint Application for LAMA Major Permit, Form 0CM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length 500 ft Width 158 ft Avg. Existing 5.6 ft NA NA Depth Final Project 7 ft NA NA Depth 1. EXCAVATION El This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. silt 4100 cu c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? if any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑VVL ®None (ii) Describe the purpose of the excavation in these areas: To access slips the have filled with silt, to facilitate safe approach to fuel dock, to allow larger vessel fueling, and to allow access to slips for larger vessels. d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Albemarle Plantation Golf Driving Range 450ftX60ft C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ®Yes []No ❑NA []Yes ®No ❑NA (k) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (S8), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: Create a berm between driving range and woods to conatin range balls f. (i) Does the disposal include any area in the water? ❑Yes ®No DNA (ii) If yes, how much water area is affected? 252.808.2808 :e 1,688-4 RCOAST s: wwv_u.nccoastaitnanagement.net revised. -i 2/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑BreakwaterlSill ❑tither: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e Type of stabilization material- f. (i) Has there boon shoreline erosion during precodino 12 months? [--]Yes ❑No El NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlandslmarsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or (ii) Amount of material to be placed in the water other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill ❑WL ❑None (ii} Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Dump site is on property and will be erosion controlled with silt Hydraulic Dredge fencing c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No ❑NA site? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. (4) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 07/26/2023 Date Lee Duncan Senior G neral Manager AP Marina Dredging Applicant N Project Name Applicant Signature 282-888-2808 :: 1-888-4RCOAST :: www.necoastaimanagemlent.net revised: 12126106