HomeMy WebLinkAboutNCC232214_ESC Approval Submitted_20230727 ROY COOPER �,llti� <_s
Governor ills
I ( ''
ELIZABETH S.BISER
' *
Secretary -Esrpy,�,pae> ---=
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
January 06, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Roanoke Chowan Community Health Center
Attn: Mr. Phillip Keith Bowen, Jr., Facilities Management and IT Administrator
113 Hertford County High Road
Ahoskie, North Carolina 27910
RE: Project Name: Roanoke Chowan Community Health Center
Project ID: Berti-2023-005
County: Bertie Acres Approved: 3.0
City: Aulander
Address: 114 Brick Mill Road
River Basin: Chowan
Date Received by LQS: December 09, 2022
Submitted By: Ark Consulting Group
Plan Type: New
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eN01 form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
�D w- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
�QJ/� Washington RegionalOffice I943 Washington Square Mall I Washhgton,North Carolina 27889
awommtc�w dw+a� /`d 252.946.6481
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Sincerely, rr
CL \'St„,„'
Samir Dumpor, PE
Regional Engineer
Land Quality Section
cc w/o enc: Phillip Keith Bowen,Jr.; Roanoke Chowan Community Health Center (email)
Nicholas Fitzgerald, PE,Ark Consulting Group (email)
WaRO Division of Water Resources (email)
1. The developer is responsible for the control of sediment on-site. If the approved erosion
and sedimentation control measures prove insufficient, the developer must take those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50%capacity.
All sediment storage measures will remain on site and functional until all grading and final
landscaping of the project is complete (15A NCAC 04B .0113).
2. The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S.
Army Corps of Engineers'jurisdiction of Section 404 of the Clean Water Act,the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances,or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within the
limits of disturbance, of any land disturbing activity to prevent sediment from leaving the
limits of disturbance, entering existing drainage systems, impacting an on-site natural
watercourse or adjoining property. (NCGS 113A-57)
PROJECT INFORMATION SHEET
APPROVAL DATE: January 06, 2023
RESPONSIBLE PARTY: Roanoke Chowan Community Health Center
PROJECT NAME: Roanoke Chowan Community Health Center
COUNTY: Bertie NO.: Berti-2023-005
OFF-SITE BORROW
AND/OR DISPOSAL SITE: NO.:
START-UP DATE:
CONTRACTOR:
ON-SITE CONTACT:
ON-SITE PHONE NO.:
OFFICE PHONE NO.:
COMPLETE &RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: Bradley West
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
donald.west@ncdenr.gov
CERTIFICATE OF PLAN APPROVAL
4-4
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b). CA%iwamw Ht%1tik COW.,
���► CSAAlw tt ike bA41 . t E'RTI ' co . ( Ad% u)
Project Name and Location
°tic& ao 3 SImre
Date of Plan Approval Regional Engineer
Certificate of Coverage Number & Cm` , 2423 ,� Oti �'