HomeMy WebLinkAboutNCC202223_NOT Closeout Documents_20230724 4 e) Greenville
NUKIH4 ( iv 1{ U 1. 1 IJ n
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
June 20,2023
Letter of Final Inspection
Rocky Russell
Rocky Russell Development, LLC
106 Regency Blvd
Greenville,NC 27834
Re: Project Name: Kinsey Creek Phase 2
Project Number: ESCP-2020-0029
County: Pitt
Disturbed Acreage: 3.77
Responsible Party: Rocky Russell Development, LLC
Dear Mr. Russell,
At your request,this office has completed its final site inspection of the referenced project. We
find the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter,the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCGO1 permit.
Please do not hesitate to call if you have any questions.
Re pectfully,
iziT,āLā C . :47
Victor. C Long
Engineer Assistant Ill
Engineering Department
City of Greenville
vlong@greenvillenc.gov
www.greenvillenc.gov
252-329-4888
52-329-4467 1500 Beatty Street, Greenville, NC 27835-7207 greenvillenc.got