Loading...
HomeMy WebLinkAboutNCC202223_NOT Closeout Documents_20230724 4 e) Greenville NUKIH4 ( iv 1{ U 1. 1 IJ n ENGINEERING Engineering Department-Sedimentation/Erosion Control Program June 20,2023 Letter of Final Inspection Rocky Russell Rocky Russell Development, LLC 106 Regency Blvd Greenville,NC 27834 Re: Project Name: Kinsey Creek Phase 2 Project Number: ESCP-2020-0029 County: Pitt Disturbed Acreage: 3.77 Responsible Party: Rocky Russell Development, LLC Dear Mr. Russell, At your request,this office has completed its final site inspection of the referenced project. We find the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter,the referenced Sedimentation and Erosion Control Plan has been closed for this project and you will need to terminate your NCGO1 permit. Please do not hesitate to call if you have any questions. Re pectfully, iziT,ā€˜Lā€ž C . :47 Victor. C Long Engineer Assistant Ill Engineering Department City of Greenville vlong@greenvillenc.gov www.greenvillenc.gov 252-329-4888 52-329-4467 1500 Beatty Street, Greenville, NC 27835-7207 greenvillenc.got