HomeMy WebLinkAbout20221576 Ver 1_USACE More Info Requested_20230726Impact ID
Wetlands
W-02
W-04
W-11
W-12
W-72
W-73
W-74
W-78
W-79
W-80
W-81
W-82
W-83
W-85
W-86
W-87
W-88
W-14
W-16
W-17
W-18
W-20
W-22
W-24
W-26
W-28
W-32
W-34
W-42
W-60A
W-64
W-76
W-77
W-84
W-45
W-47
W-49
W-51
W-53a
W-53b
W-53c
W-55
W-56
W-57
W-58
W-59
W-60
W-61
W-62
W-63
W-68
W-69
W-70
W-74
W-75
Streams
S-02
S-05
S-13
S-85
S-88
S-71
S-15
S-16
S-17
S-19
S-20
S-21
S-59
S-22
S-60
S-23
S-24
S-25
S-86
S-26
S-63
S-30
S-64
S-31
S-65
S-32
S-33
S-72
S-34
S-73
S-35
S-74
S-36
S-75
S-37
S-38
S-76
S-77
S-18
S-43
S-44
S-46
S-47
S-50
S-78
S-90
S-51
S-55
S-56
S-57
S-89
S-82
S-68
S-69
S-66
S-87
S-100
WOTUS Name
P1S_WA1
P1S_WB
WWA
WWA
P1S_WB
P1S_WD
P1S_WD
AR_501_WC
AR_501_WB
AR_501_WA
WWAK
AR_501_WD
P1S_WB
WWA
WWAW
WWAW
WWAK
P2S_WA
P2S_WB
P2S_WC
P2S_WD
P2S_WE
P2S_WG
P2S_WH
P2S_WI
P2S_WJ
P2S_WL
P2S_WN
P2S_WS
P2S_WO
P2S_WM
P2S_WA
P2S_WB
P2S_WK
P2W_WA
P2W_WB
P2W_WC
P2W_WD
P2W_WE
P2W_WE
P2W_WE
P2W_WG
P2W_WG
P2W_WH
P2W_WH
RD_P2W_WA
WHA1
WHA1
RD_P2W_WHA2
RD_P2W_WHA2
P2W_WE
P2W_WE
P2W_WE
P2W_A_WB
P2W_A_WA
P1S_S2
P1S_S5
P1W_S7
P1S_S5
P1S_S6
P1W_S7
P2S_S11
P2S_S12
P2S_S13
P2S_S14
P2S_S15
P2S_S16
P2S_S16
P2S_S17
P2S_S17
P2S_S18
P2S_S20
P2S_S21
P2S_S21
P2S_S22
P2S_S22
P2S_S23
P2S_S23
P2S_S24
P2S_S24
P2S_S25
P2S_S26
P2S_S26
P2S_S27
P2S_S27
P2S_S28
P2S_S28
P2S_S29
P2S_S29
P2S_S3
P2S_S30
P2S_S30
P2S_S33
P2S_S35
P2S_S4
P2S_S5
P2S_S7
P2S_S8
P2W_S11
P2W_S11
P2W_S11
P2W_S12
P2W_S5
P2W_S6
P2W_S7
P2W_S7
P2W_S8
RD_P2S_SB
RD_P2S_SB
RD_P2S_SD
RD_P2S_SD
P2S_S20
Alignment
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 1 Water & Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Water
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Phase 2 Sewer
Impact Type
Permanent Cover Conversion
Permanent
Temporary
Temporary
Permanent
Temporary
Permanent Cover Conversion
Temporary
Temporary
Temporary
Permanent Cover Conversion
Temporary
Temporary
Permanent Cover Conversion
Temporary
Permanent Cover Conversion
Temporary
Permanent Cover Conversion
Permanent Cover Conversion
Temporary
Temporary
Permanent Cover Conversion
Temporary
Temporary
Temporary
Temporary
Temporary
Temporary
Permanent Cover Conversion
Permanent Cover Conversion
Temporary
Temporary
Temporary
Temporary
Permanent Cover Conversion
Permanent Cover Conversion
Permanent Cover Conversion
Permanent Cover Conversion
Permanent Cover Conversion
Permanent Cover Conversion
Permanent Cover Conversion
Temporary
Permanent Cover Conversion
Temporary
Permanent Cover Conversion
Temporary
Temporary
Permanent Cover Conversion
Temporary
Temporary
Temporary
Temporary
Temporary
Temporary
Permanent Cover Conversion
Permanent
Temporary
Temporary
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Temporary
Permanent without a loss
Temporary
Permanent without a loss
Permanent without a loss
Temporary
Temporary
Permanent without a loss
Temporary
Permanent without a loss
Temporary
Permanent without a loss
Temporary
Permanent without a loss
Temporary
Temporary
Permanent
Temporary
Permanent
Temporary
Permanent
Temporary
Permanent
Permanent without a loss
Temporary
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Permanent without a loss
Temporary
Permanent without a loss
Permanent without a loss
Temporary
Permanent without a loss
Permanent without a loss
Permanent without a loss
Temporary
Permanent without a loss
Temporary
Permanent without a loss
Permanent
Temporary
Permanent without a loss
Impact Description
Trenching, Clearing, Grubbing, Stabilization
Culvert installation, cover fill for culverts
Clearing, Construction Access
Clearing, Construction Access
Culvert installation, cover fill for culverts
Clearing, Grubbing
Trenching, Clearing, Grubbing, Stabilization
Clearing, Pump Around After Rain Events
Clearing, Pump Around After Rain Events
Clearing, Pump Around After Rain Events
Trenching, Clearing, Grubbing
Clearing, Grubbing
Clearing, Grubbing
Trenching, Clearing, Grubbing
Clearing, Grubbing
Trenching, Clearing, Grubbing
Clearing, Grubbing
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Clearing, Construction Access
Clearing, Construction Access
Trenching, Clearing, Grubbing
Clearing, Construction Access
Clearing, Construction Access
Clearing, Construction Access
Clearing, Construction Access
Clearing, Construction Access
Clearing, Construction Access
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Clearing, Construction Access
Clearing, Grubbing
Clearing, Grubbing
Clearing, Construction Access
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Trenching, Clearing, Grubbing
Clearing, Grubbing
Trenching, Clearing, Grubbing
Clearing, Grubbing
Temporary Construction Access
Temporary Staging Area
Clearing, Grubbing
Trenching, Clearing, Grubbing
Temporary Construction Access
Temporary Construction Access
Clearing, Grubbing
Clearing, Grubbing
Clearing, Grubbing
Excavation, Stabilization
Trenching, Clearing, Grubbing
Culvert installation
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Culvert installation
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Culvert installation
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Culvert installation
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Culvert installation
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Culvert installation
Construction Access and Dewatering, Area to be Returned to Pre-construction Conditions
Excavation, banks returned to pre-construction contours and stablized per "Special Embankment for River/Stream Bank Stabilization". Permanent fords will be limited to 20-foot width.
Feature Type
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Perennial
Perennial
Perennial
Perennial
Perennial
Perennial
Intermittent
Intermittent
Intermittent
Intermittent
Intermittent
Perennial
Perennial
Perennial
Perennial
Perennial
Perennial
Intermittent
Intermittent
Perennial
Perennial
Intermittent
Intermittent
Intermittent
Intermittent
Ephemeral
Perennial
Perennial
Ephemeral
Ephemeral
Ephemeral
Ephemeral
Perennial
Perennial
Ephemeral
Perennial
Perennial
Perennial
Intermittent
Intermittent
Intermittent
Intermittent
Intermittent
Perennial
Perennial
Perennial
Intermittent
Intermittent
Intermittent
Intermittent
Intermittent
Perennial
Ephemeral
Ephemeral
Perennial
Perennial
Perennial
Cowardin Classification
PFO
PFO
PEM
PEM
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PSS
PEM
PEM
PFO
PEM
PEM
PEM
PEM
PEM
PEM
PFO
PFO
PEM
PFO
PSS
PEM
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PFO
PEM
PEM
PFO
PFO
PEM
PEM
PFO
PFO
PFO
PEM
PFO
R5
R5
R5
R5
R5
R5
R4
R4
R4
R4
R4
R5
R5
R5
R5
R5
R5
R4
R4
R5
R5
R4
R4
R4
R4
R6
R5
R5
R6
R6
R6
R6
R5
R5
R6
R5
R5
R5
R4
R4
R4
R4
R4
R5
R5
R5
R4
R4
R4
R4
R4
R5
R6
R6
R5
R5
R5
NCWAM Classification
Headwater Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Headwater Forest
Riverine Swamp Forest
Headwater Forest
Headwater Forest
Headwater Forest
Riverine Swamp Forest
Riverine Swamp Forest
Headwater Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Headwater Forest
Bottomland Hardwood Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
Riverine Swamp Forest
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Stream Area (Sq Ft)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3787
1814
1813
1505
154
1483
1016
101.030144
219
245
430
49
647
264
1019
374
95
43
170
68
208
89
368
45
154
127
7019
345
1003
44
1945
67
1459
29
877
5102
361
637
404.045752
108
109
299
391
183
189
436
79
226
314
267
42
1009
31
63
151
7076
374
Stream Area (Ac)
8.69375573921028E-02
0.041643709825528
4.16207529843893E-02
3.45500459136823E-02
3.53535353535354E-03
3.40449954086318E-02
2.33241505968779E-02
2.31933296602388E-03
5.02754820936639E-03
5.62442607897153E-03
9.87144168962351E-03
1.12488521579431E-03
1.48530762167126E-02
6.06060606060606E-03
2.33930211202938E-02
8.58585858585859E-03
2.18089990817264E-03
9.87144168962351E-04
3.90266299357208E-03
1.56106519742883E-03
4.77502295684114E-03
2.04315886134068E-03
8.44811753902663E-03
1.03305785123967E-03
3.53535353535354E-03
2.91551882460973E-03
0.16113406795225
7.92011019283747E-03
2.30257116620753E-02
1.01010101010101E-03
4.46510560146924E-02
1.53810835629017E-03
3.34940312213039E-02
6.6574839302112E-04
2.01331496786042E-02
0.11712580348944
8.28741965105602E-03
0.014623507805326
9.27561414141414E-03
2.47933884297521E-03
2.50229568411387E-03
6.86409550045914E-03
8.9761248852158E-03
4.20110192837466E-03
4.33884297520661E-03
1.00091827364555E-02
1.81359044995409E-03
5.18824609733701E-03
7.20844811753903E-03
6.12947658402204E-03
9.64187327823692E-04
2.31634527089073E-02
7.11662075298439E-04
1.44628099173554E-03
3.46648301193756E-03
0.162442607897153
8.58585858585859E-03
Stream Length (lf)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
229
53
54
37
36
94
65
59
41
40
44
3
47
13
38
54
12
11
47
10
30
9
46
11
35
56
448
20
354
20
380
20
458
22
82
275
50
30
73
31
41
51
74
20
47
48
20
30
29
66
10
40
11
21
24
892
53
CORPS ADDED STREAM WIDTH (FT)
16.5371179039301
34.2264150943396
33.5740740740741
40.6756756756757
4.27777777777778
15.7765957446809
15.6307692307692
1.7123753220339
5.34146341463415
6.125
9.77272727272727
16.3333333333333
13.7659574468085
20.3076923076923
26.8157894736842
6.92592592592593
7.91666666666667
3.90909090909091
3.61702127659574
6.8
6.93333333333333
9.88888888888889
8
4.09090909090909
4.4
2.26785714285714
15.6674107142857
17.25
2.83333333333333
2.2
5.11842105263158
3.35
3.18558951965066
1.31818181818182
10.6951219512195
18.5527272727273
7.22
21.2333333333333
5.53487331506849
3.48387096774194
2.65853658536585
5.86274509803922
5.28378378378378
9.15
4.02127659574468
9.08333333333333
3.95
7.53333333333333
10.8275862068966
4.04545454545455
4.2
25.225
2.81818181818182
3
6.29166666666667
7.93273542600897
7.05660377358491
Wetland Area (sq ft)
8545
15030
20155
6086
4966
383
241
714
770
822
4238
1034
10168
23438
3505
3859
4087
3529
903
6794
94
5155
864
2218
26
20809
2568
2157
3552
1283
31
1399
466
1621
2808
16490
9028
4413
115718
41111
12486
10532
24748
3177
11046
2614
3160
1297
3506
2538
5858
31899
13452
12318
9301
Wetland Area (ac)
0.196166207529844
0.34504132231405
0.462695133149679
0.139715335169881
0.114003673094582
8.79247015610652E-03
5.5325987144169E-03
1.63911845730028E-02
1.76767676767677E-02
0.018870523415978
9.72910927456382E-02
2.37373737373737E-02
0.233425160697888
0.538062442607897
8.04637281910009E-02
8.85904499540863E-02
9.38246097337006E-02
8.10146923783287E-02
2.07300275482094E-02
0.155968778696051
2.15794306703398E-03
0.118342516069789
1.98347107438017E-02
5.09182736455464E-02
5.96877869605142E-04
0.477708907254362
5.89531680440771E-02
4.95179063360882E-02
8.15426997245179E-02
2.94536271808999E-02
7.11662075298439E-04
3.21166207529844E-02
1.06978879706152E-02
3.72130394857668E-02
6.44628099173554E-02
0.378558310376492
0.207254361799816
0.101308539944904
2.65651974288338
0.943778696051423
0.2866391184573
0.24178145087236
0.568135904499541
7.29338842975207E-02
0.253581267217631
6.00091827364555E-02
7.25436179981635E-02
2.97750229568411E-02
8.04866850321396E-02
5.82644628099174E-02
0.134481175390266
0.732300275482094
0.308815426997245
0.282782369146006
0.21352157943067
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8-Digit HUC
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030003
03030004
03030004
03030002
03030002
03030004
03030002
03030002
03030002
03030002
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030002
03030002
03030002
03030002
03030002
03030002
03030002
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030003
03030003
03030003
03030003
03030003
03030003
03030003
03030003
03030004
03030003
03030003
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030004
03030003
03030003
03030003
03030003
03030004
Mitigation Required
Yes
Yes
No
No
Yes
No
Yes
No
No
No
Yes
No
No
Yes
No
Yes
No
Yes
Yes
No
No
Yes
No
No
No
No
No
No
Yes
Yes
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
No
Yes
No
No
Yes
No
No
No
No
No
No
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
Yes
No
Yes
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
No
Mitigation Ratio
1:1
2:1
N/A
N/A
2:1
N/A
1:1
N/A
N/A
N/A
1:1
N/A
N/A
1:1
N/A
1:1
N/A
1:1
1:1
N/A
N/A
1:1
N/A
N/A
N/A
N/A
N/A
N/A
1:1
1:1
N/A
N/A
N/A
N/A
1:1
1:1
1:1
1:1
1:1
1:1
1:1
N/A
1:1
N/A
1:1
N/A
N/A
1:1
N/A
N/A
N/A
N/A
N/A
N/A
1:1
2:1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2:1
N/A
2:1
N/A
2:1
N/A
2:1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2:1
N/A
N/A
Mitigation Credits
0.196166207529844
0.690082644628099
N/A
N/A
0.228007346189164
N/A
5.5325987144169E-03
N/A
N/A
N/A
9.72910927456382E-02
N/A
N/A
0.54
N/A
0.09
N/A
8.10146923783287E-02
2.07300275482094E-02
N/A
N/A
0.118342516069789
N/A
N/A
N/A
N/A
N/A
N/A
8.15426997245179E-02
2.94536271808999E-02
N/A
N/A
N/A
N/A
0.06
0.378558310376492
0.207254361799816
0.101308539944904
2.65651974288338
0.943778696051423
0.2866391184573
N/A
0.568135904499541
N/A
0.253581267217631
N/A
N/A
2.97750229568411E-02
N/A
N/A
N/A
N/A
N/A
N/A
0.21352157943067
458
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
40
N/A
40
N/A
40
N/A
44
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
48
N/A
N/A
Impact Sheet
Phase 1 Water & Sewer, Page 5, 6
Phase 1 Water & Sewer, Page 5, 6
Phase 1 Water & Sewer, Page 3, 4
Phase 1 Water & Sewer, Page 3
Phase 1 Water & Sewer, Page 5, 6
Phase 1 Water & Sewer, Page 7
Phase 1 Water & Sewer, Page 7
Phase 1 Water & Sewer, Page 14
Phase 1 Water & Sewer, Page 14
Phase 1 Water & Sewer, Page 15
Phase 1 Water & Sewer, Page 1
Phase 1 Water & Sewer, Page 12, 13
Phase 1 Water & Sewer, Page 5, 6
Phase 1 Water & Sewer, Page 3, 4
Phase 1 Water & Sewer, Page 2
Phase 1 Water & Sewer, Page 2
Phase 1 Water & Sewer, Page 1
Phase 2 Sewer, Page 49
Phase 2 Sewer, Page 47, 49
Phase 2 Sewer, Page 45, 46
Phase 2 Sewer, Page 45
Phase 2 Sewer, Page 44, 45
Phase 2 Sewer, Page 43, 44
Phase 2 Sewer, Page 42, 43
Phase 2 Sewer, Page 41, 42
Phase 2 Sewer, Page 41, 42
Phase 2 Sewer, Page 38, 39
Phase 2 Sewer, Page 33, 34
Phase 2 Sewer, Page 10, 11, 12
Phaes 2 Sewer, Page 31
Phase 2 Sewer, Page 33, 34, 35
Phase 2 Sewer, Page 49
Phase 2 Sewer, Page 47, 49
Phase 2 Sewer, Page 40, 41
Phase 1 Water & Sewer, Page 1
Phase 2 Water, Page 28
Phase 2 Water, Page 26
Phase 2 Water, Page 25
Phase 2 Water, Page 23, 24
Phase 2 Water, Page 8, 9, 10
Phase 2 Water, Page 10, 11
Phase 2 Water, Page 10, 11, 12
Phase 2 Water, Page 3
Phase 2 Water, Page 4, 5
Phase 2 Water, Page 5, 6
Phase 2 Water, Page 5, 6
Phase 2 Water, Page 12
Phase 2 Water, Page 6
Phase 2 Water, Page 6
Phase 2 Water, Page 6
Phase 2 Water, Page 6
Phase 2 Water, Page 9
Phase 2 Water, Page 8, 9, 10
Phase 2 Water, Page 9, 10, 11
Phase 2 Water, Page 20
Phase 2 Water, Page 21, 22
Phase 1 Water & Sewer, Page 5, 6
Phase 1 Water & Sewer, Page 10, 11
Phase 1 Water & Sewer, Page 3
Phase 1 Water & Sewer, Page 10, 11
Phase 1 Water & Sewer, Page 7
Phase 1 Water & Sewer, Page 3
Phase 2 Sewer, Page 30
Phase 2 Sewer, Page 28
Phase 2 Sewer, Page 28
Phase 2 Sewer, Page 22, 23
Phase 2 Sewer, Page 21, 22
Phase 2 Sewer, Page 20, 21
Phase 2 Sewer, Page 20, 21
Phase 2 Sewer, Page 20
Phase 2 Sewer, Page 20
Phase 2 Sewer, Page 18, 19
Phase 2 Sewer, Page 18, 19
Phase 2 Sewer, Page 18
Phase 2 Sewer, Page 18
Phase 2 Sewer, Page 17
Phase 2 Sewer, Page 17
Phase 2 Sewer, Page 16
Phase 2 Sewer, Page 16
Phase 2 Sewer, Page 15
Phase 2 Sewer, Page 15
Phase 2 Sewer, Page 13, 14
Phase 2 Sewer, Page 6
Phase 2 Sewer, Page 6
Phase 2 Sewer, Page 6
Phase 2 Sewer, Page 6
Phase 2 Sewer, Page 5
Phase 2 Sewer, Page 5
Phase 2 Sewer, Page 5
Phase 2 Sewer, Page 5
Phase 2 Sewer, Page 41, 42
Phase 2 Sewer, Page 3, 4
Phase 2 Sewer, Page 4
Phase 2 Sewer, Page 43, 44
Phase 2 Sewer, Page 23, 24
Phase 2 Sewer, Page 39, 40
Phase 2 Sewer, Page 35, 36
Phase 2 Sewer, Page 33, 34, 35
Phase 2 Sewer, Page 32
Phase 2 Water, Page 3
Phase 2 Water, Page 2
Phase 2 Water, Page 3
Phase 2 Water, Page 2
Phase 2 Water, Page 19, 20
Phase 2 Water, Page 18
Phase 2 Water, Page 10
Phase 2 Water, Page 10
Phase 2 Water, Page 10
Phase 2 Sewer, Page 2
Phase 2 Sewer, Page 2
Phase 2 Sewer, Page 7
Phase 2 Sewer, Page 6, 7
Phase 2 Sewer, Page 18, 19
X
-79.0333034
-79.03212309
-79.04022072
-79.04759466
-79.032
-79.027
-79.0271
-79.0152
-79.0115
-79.0077
-79.0498
-79.0196
-79.0324
-79.04
-79.0462
-79.0462
-79.0499
-79.04643756
-79.04782645
-79.05343522
-79.0549654
-79.05636689
-79.06027895
-79.06395255
-79.06643234
-79.06805393
-79.07831949
-79.09557685
-79.18679701
-79.10448309
-79.0935883
-79.04643756
-79.04782645
-79.07340415
-79.04776465
-79.04729809
-79.0469427
-79.04615945
79.0253879
79.0253879
79.0253879
-79.0334332
-79.03341195
-79.03002333
-79.0302971
-79.0276878
-79.0262336
-79.0262336
-79.0280539
-79.0280539
79.025388
79.025388
79.025388
-79.0358
-79.0405
-79.03055748
-79.01580018
-79.0394
-79.01580018
-79.0272
-79.03951326
-79.10942706
-79.11515339
-79.11840299
-79.14012033
-79.14499591
-79.14943136
-79.14943136
-79.15204042
-79.15204042
-79.15505431
-79.15712219
-79.15918186
-79.15918186
-79.16468454
-79.16468454
-79.16737157
-79.16737157
-79.17133668
-79.17133668
-79.17603712
-79.20256002
-79.20256002
-79.20447524
-79.20447524
-79.20601754
-79.20601754
-79.2068664
-79.2068664
-79.0671218
-79.2121268
-79.2121268
-79.0601147
-79.13638712
-79.07341858
-79.08772449
-79.09355782
-79.09794499
-79.03786364
-79.03786364
-79.03786364
-79.04062608
-79.03423291
-79.02662197
-79.02258377
-79.02258377
79.0244537
-79.2172092
-79.2172092
-79.2001531
-79.2001531
-79.15712219
Y
35.6176779
35.6152914
35.61567172
35.61547204
35.6147
35.6108
35.6109
35.6065
35.6069
35.607
35.6157
35.6079
35.6158
35.6159
35.6155
35.6145
35.6157
35.59893773
35.59895083
35.5921717
35.58994609
35.58892503
35.58650865
35.58373607
35.58213224
35.58104365
35.57422814
35.56433825
35.54954565
35.56565354
35.5642433
35.59893773
35.59895083
35.57734544
35.61486862
35.60930038
35.6046852
35.59981802
35.5630381
35.5630381
35.5630381
35.54469717
35.54470801
35.54673611
35.54661327
35.5656
35.5481835
35.5481835
35.5478378
35.5478378
35.563038
35.563038
35.563038
35.5206
35.5932
35.61462373
35.61534958
35.6155
35.61534958
35.6109
35.61557815
35.56532833
35.56550453
35.56638887
35.56322984
35.56085589
35.55889003
35.55889003
35.55817324
35.55817324
35.55803075
35.55744943
35.55638873
35.55638873
35.5537413
35.5537413
35.55337132
35.55337132
35.55300177
35.55300177
35.55238007
35.54264572
35.54264572
35.54225751
35.54225751
35.54214889
35.54214889
35.54216325
35.54216325
35.58181118
35.542821
35.542821
35.586636
35.56283232
35.57741509
35.56751611
35.56408154
35.56414841
35.54122904
35.54122904
35.54122904
35.53821488
35.58958279
35.58641321
35.56011747
35.56011747
35.5512052
35.5447308
35.5447308
35.5434331
35.5434331
35.55744943
Corps Cross-referenced with Plans?
See comment
OK
OK
See comment
OK
See comment
OK
OK
OK
See comment
See comment
OK
OK
OK
See comment
See comment
See comment
OK
OK
OK
OK
OK
OK
OK
OK
See comment
OK
OK
OK
OK
OK
OK
OK
OK
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
OK
See comment
OK
See comment
See comment
OK
OK
OK
See comment
OK
OK
OK
OK
OK
OK
See comment
OK
OK
OK
OK
OK
OK
OK
OK
See comment
OK
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
OK
See comment
See comment
OK
OK
OK
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
See comment
OK
OK
See comment
See comment
See comment
Corps comments?
This appears to be a road crossing for the utility access road, but the plans and spreadsheet list as permanent conversion. Should be permanent loss and mit. at 2:1; unless road ends
prior to that?
Note: two portions of the same wetland are proposed for permanent impacts due to utility access road
ESC-10 incorrectly labels this as part of Impact W-11
ESC-12 incorrectly labels this as Impact W-75
Sheet AD-2 shows this wetland/impact on the north side of the access road, whereas all other plan sheets show it on the south side of the access road
ESC-8 incorrectly labels this as Impact W-85
ESC-9 incorrectly labels this as Impact W-11
ESC-9 incorrectly labels this as Impact W-87
ESC-8 incorrectly labels this as Impact W-11
Sheet ESC-40 incorrectly labels this wetland impact (on the west side of the stream) as "S-28", when it should be W-28
Wetland P2W_WA not highlighted on Sheet WL-28
Wetland P2W_WB not highlighted on Sheet WL-25/26
Wetland P2W_WC not highlighted on Sheet WL-25
Wetland P2W_WD not highlighted on Sheet WL-23
Wetland P2W_WE not highlighted on Sheet WL-7 through WL-10, and no profile view available either
Wetland P2W_WE not highlighted on Sheet WL-7 through WL-10, and no profile view available either
Wetland P2W_WE not highlighted on Sheet WL-7 through WL-10, and no profile view available either. Appears to be a temp access road? Why are there permanent conversion impacts?
Wetland P2W_WG not highlighted on Sheet WL-4, and no profile view available either
Wetland P2W_WG not highlighted on Sheet WL-4, and no profile view available either
Wetland P2W_WH not highlighted on Sheet WL-5, and no profile view available either
Wetland P2W_WH not highlighted on Sheet WL-5, and no profile view available either
Appears practicable to avoid wetland imapcts by changing the configuration of the proposed staging area. Wetland RD_P2W_WA not highlighted on Sheet WL-11
Could not find civil drawing for this access road (not on WL-5)
Could not find civil drawing for this access road (not on WL-5)
Wetland RD_P2W_WHA2 not highlighted on Sheet WL-5, and no profile view available either. Construction laydown yard in this wetland (per Sheet WL-5) does not appear to avoid and minimize
impacts to the maximum extent practicable.
Wetland RD_P2W_WHA2 not highlighted on Sheet WL-5, and no profile view available either
Wetland P2W_WE not highlighted on Sheet WL-7 and WL-8, and no profile view available either
Wetland P2W_WE not highlighted on Sheet WL-7 through WL-10, and no profile view available either
Wetland P2W_WE not highlighted on Sheet WL-7 through WL-10, and no profile view available either
Impact ID is the same as an impact in Phase 1 Sewer/Water plans. Wetland P2W_A_WB not highlighted on Sheet WL-19, and no profile view available either
Wetland P2W_A_WA not highlighted on Sheet WL-20, and no profile view available either
S-05 and S-85 appear to be reversed b/w ESC-15 / “Phase I Water and Sewer Line Potential WOTUS Impacts” and the Impacts spreadsheet. Also, stream does not appear to actually be 34'
wide
S-05 and S-85 appear to be reversed b/w ESC-15 / “Phase I Water and Sewer Line Potential WOTUS Impacts” and the Impacts spreadsheet. Also, stream does not appear to actually be 40'
wide
“Phase I Water and Sewer Line Potential WOTUS Impacts” shows 33 lf impact, which is inconsistent with impacts spreadsheet. Acreage is ok though
Spreadsheet incorrectly lists water as P2S_S13, when (according to Sheet FM-39) it should be P2S_S36
Impact listed on “Phase I Water and Sewer Line Potential WOTUS Impacts” (54 lf / 274 sf) is inconsistent with impacts spreadsheet
Impact listed on “Phase I Water and Sewer Line Potential WOTUS Impacts” (53 lf / 374 sf) is inconsistent with impacts spreadsheet
The length of this temp impact does not appear to minimize to the maximum extent practicable. Purpose of this impact does not appear to be attributable to FM installation for Vinfast
Permanent impact lengths do not match culverts/lengths as shown on Sheet FM-5
The length of this temp impact does not appear to minimize to the maximum extent practicable. Purpose of this impact does not appear to be attributable to FM installation for Vinfast
Permanent impact lengths do not match culverts/lengths as shown on Sheet FM-5
The length of this temp impact does not appear to minimize to the maximum extent practicable. Purpose of this impact does not appear to be attributable to FM installation for Vinfast
Permanent impact lengths do not match culverts/lengths as shown on Sheet FM-5
The length of this temp impact does not appear to minimize to the maximum extent practicable. Purpose of this impact does not appear to be attributable to FM installation for Vinfast
Permanent impact lengths do not match culverts/lengths as shown on Sheet FM-5
Spreadsheet incorrectly lists water as P2S_S3, when (according to Sheet FM-58) it should be P2S_S23
The length of this temp impact does not appear to minimize to the maximum extent practicable.
Impact listed on “Phase II Water and Sewer Line Potential WOTUS Impacts” (20 lf) is inconsistent with impacts spreadsheet
Spreadsheet incorrectly lists water as P2S_S35, when (according to Sheet FM-32) it should be P25_S13
Sheet FM-55 shows wetland at this crossing but not the stream (P2S_S4)
Stream P2W_S11 not highlighted on Sheet WL-3
Stream P2W_S12 not highlighted shown on Sheet WL-2, and no profile view available either
Stream P2W_S11 not highlighted on Sheet WL-3
Stream P2W_S12 not highlighted shown on Sheet WL-2, and no profile view available either
Stream P2W_S5 not highlighted on Sheet WL-19, and no profile view available either
Stream P2W_S6 not highlighted on Sheet WL-17, and no profile view available either
Stream P2W_S7 not highlighted on Sheet WL-9, and no profile view available either
Stream P2W_S7 not highlighted on Sheet WL-9, and no profile view available either
Stream P2W-S8 not highlighted on Sheet WL6, and no profile view available either
Permanent impact lengths do not match culverts/lengths as shown on Sheet FM-5
The length of this temp impact does not appear to minimize to the maximum extent practicable. Purpose of this impact does not appear to be attributable to FM installation for Vinfast
This impact does not appear by that Impact ID (S-100) on the “Phase II Sewer Line Potential WOTUS Impacts” document