Loading...
HomeMy WebLinkAbout1346-004_Directional Drill Creek Preparation (2).pdfRequest For Information KSCCO KEMP SIGMON RFI # 1346-004 . CONSTRUCTION CO. Date 7/5/2023 Date Needed By 7/19/2023 To: Greg Tucker, gtucker@jtrussellandsons.com Project Name Rowan C204426 Project # 1346 Summary KSCC is requesting permission to install a dike and (2) 36" HDPE flow through pipes to decrease the flow of water in the area above the 12" directional drill. Per the drawings, we are concerned with a frack out in the creek and managing the flow of water will decrease any environmental concerns. Per the drawings the line is supposed to be less than three feet from the surface and we want to mitigate any turbidity. Attachments: Submitted By: Andrew Smith 828-838-2786 andrew@kempsigmonconstruction.com