Loading...
HomeMy WebLinkAboutSW8170208_Current Permit_20170427Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY April 27, 2017 Thomas K. Moore, Jr., Member/Manager Coastal Marine Properties, LLC 104 Wyndham Way Wilmington, NC 28411 Subject: State Stormwater Management Permit No. SW 170208 Hampstead Marine Center High Density Wet Detention Pond Project Pender County Dear Mr. Moore: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director The Wilmington Regional Office received a complete, Stormwater Management Permit Application for Hampstead Marine Center on April 25, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 170208 dated April 27, 2017, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until April 27, 2025, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (3 0) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis in the Wilmington Regional Office, at (910) 796-7215. Sincerely, Ell n Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/arl: G:\\\Stormwater\Permits & Projects\2017\170208 HD\2017 04 permit 170208 cc: Adam Grady, P.E., Hanover Design Services Barnes Sutton, Pender County Planning Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7275 State Stormwater Management Systems Permit No. SW8 170208 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Coastal Marine Properties, LLC Hampstead Marine Center 166 Andrew Jackson Lane, Hampstead, Pender County FOR THE construction, operation and maintenance of one (1) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until April 27, 2025, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control measure. The stormwater control measure has been designed to handle the runoff from a total pf 149,599 square feet of impervious area which includes 119,599 sf currently proposed and 30,000 sf for future development. 3. The overall tract and the drainage area will be limited to the amount of built -upon area indicated in Sections 1.2 and 1.6 of this permit, and per approved plans. 4. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 5. All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity. Page 1 of 7 State Stormwater Management Systems Permit No. SW8 170208 6. The following design criteria have been permitted for the wet detention pond and must be provided and maintained at the design condition: Pond 1 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: 5.71 248,854 0 b. Total Impervious Surfaces, ft2: Onsite current, ft2: Onsite Future, ft2: offsite, ft2-0 149,599 119,599 30,000 c. Average Pond Design Depth, feet: 3.5 d. TSS Removal Efficiency: 90% e. Design Storm, inches: 1.5 f. Permanent Pool PP Elevation, FMSL: 34.50 g. Permitted PP Surface Area, ft2: 16,187 h. Temporary Storage Elevation, FMSL: 35.50 i. Permitted Storage Volume, ft3: 18,552 j. Predevelopment 1 yr-24 hr. discharge rate, cfs: 4.45 k. Controlling Orifice, inch 0pipe.- 2.0 I. Orifice Flow Rate, cfs: .06 m. PP Volume, ft : 60,500 n. Foreba Volume, ft3: 13,324 o. Maximum Fountain Horsepower: 1/4 p. Receiving Stream/River Basin: UT Mullet Run / CPF24 q. Stream Index Number: 18-87-9-1 r. Classification of Water Body: SA (>1/2 mile II. SCHEDULE OF COMPLIANCE No component of the approved stormwater management system and the runoff collection system shown on the approved plans shall be altered in any way unless and until the Division has approved of the revised plan. 2. The stormwater management system shall be entirely constructed, vegetated and fully operational for its permitted use prior to the construction of any built -upon surface. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. "The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 170208 6. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/4 horsepower. 7. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. All stormwater collection and treatment systems must be located in either public rights - of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements to the nearest public right-of-way. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. f. The construction of any permeable pavement for BUA credit. 11. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 170208 III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Permit Transfer Application Form, accompanied by the supporting documentation and processing fee as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256, c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 6. The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Approved plans, calculations, supplement forms, operation and maintenance agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control measure must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 170208 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee. Permit issued this the 27th day of April 2017. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION E K.Tracy Da , P.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 170208 Page 5 of 7 State Stormwater Management Systems Permit No. SW8 170208 Hampstead Marine Center Stormwater Permit No. SW8 170208 Pender County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 170208 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Wilmington Regional Office Barnes Sutton, Pender County Planning Page 7 of 7 DEML.R USE ONLY Date ecei ed Fee Paid Permit Number J Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW 4 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Hampstead Marine Center 2. Location of Project (street address): 166 Andrew Tackson Ln City:Hampstead County:Pender Zip:28443 3. Directions to project (from nearest major intersection): The Site is aRRrox. 0.37 miles southwest of the intersection of US 17/210 and Sloop Point Road and is located on the eastern side of US 17/NC210 4. Latitude:34* 25' 49" N Longitude:-77° 38' 07" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SMI 102 - Renewal Application Form b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) . and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density NHigh Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES.Industrial Stormwater ❑Sedimentation/Erosion Control: 5.59 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b. if any of these permits have already been acquired please provide the Project Name, Project/ Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? NNo ❑Yes �AM Z��� If yes, see S.L. 2012-200, Part VI: htW://12ortal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 ill. CONTACT INFORMATION 1. a. Print Applicant / Signing OfficiaPs name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the vroject): Applicant/Organization Coestal Marine Properties, LLC Signing Official & Title:Thomas K. Moore, Tr., Member Manager b.Contact information for person listed in item la above: Street Address104 Wyndham Way City:Wilmington State•NC Zip:28411 Mailing Address ((fapplicable):104 Wyndham Way City:Wilmington State•NC Zip:28411 Phone: f916 1 232 2272 Fax: L l Emaildaddetaflodftgil.com c. PIease check the appropriate box. The applicant listed above is: ® The property owner (Slap to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:N/A Signing Official & Title: b.Contact information for person listed in item 2a above. Street Address: City: State -_Zip: Mailing Address (if applicable): City: State- Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the projecfs construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:N/A Signing Official & Title b.Contact information for person listed in item 3a above: Mailing Address City: Stake: Zip: Phone: ( ) Fax: ( 1 Email: 4. Local jurisdiction for building permits fender County Point of Contact:Barnes F%tton Phone $: (910 ) 27M161 —EIVE. Fonn SWU-101 Version Opt. 31, 2013 Page 2 oft JAN 2 4 2017 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater Runoff from the drainage area will be collected by means of invereted crown drop inlets and storm sewer. The run-off will be treated in a wet detention basin. After treatment the pond outflows to the on site wetlands which drain into an unnamed tributairy that flows into Mullet Run 18-87-9-1 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area:18.65 acres 5. Total Coastal Wetlands Area:10.58 acres 6. Total Surface Water Area: N/A acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:8.07 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NHvvJ line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or Za line. The resultant project area is used to calculate overall percent built upon area (B A). Non -coastal wetlands landward of the NHW (or MHK9 line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 43.6 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area Drama a Area Receiving Stream Name Mullet Run Stream Class * SA; HQW Stream Index Number * 18-87-9-1IMF Total Drainage Area (sf) 248,854 On -site Drainage Area (sf) 248,854 MAN 15 Off -site Drainage Area (sf) 0 Proposed Impervious Area** s 149,599 Y� % Impervious Area** total 60 Impervious`* Surface Area Drainage Area 1 Drama a Area ? Drama a Area Drama Area _ On -site Buildings/Lots (sf) 35,824 On -site Streets (sf) 77,457 On -site Parking (sf) - On -site Sidewalks (sf) 318 Other on -site (sf) 6000 Future (sf) 30,000 Off -site (sf) N/A Existing BUA*** (so N/A Total (sf): 149,599 R Stream Class and Index_ Number can be determined at: http*ortal.nedenr.org/web/wq/ps/csu/classi cations Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 '* lnsidepermts area is defined as the bidit upon area including, but not limited to, buildings, roads, parking areas, gravel areas, etc. Report only that amount of existing B UA that u471 rematlt after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A proiects in buion county: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http.//porW.ncdenr.org web/wq/ws/sg[bmR:manual Vl. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from Ettp:/l .2rt&Lncdenr.orLr/web/wo/ws/su/statesw/fgt= doc;. The complete application package should be submitted to the appropriate DEMLR Office. (the appropriate office may be found by locating project on the interactiveonNnemapath!M://Wrtal.ncdenr.orizweb/wq/wslsu/mans.) Please indicate that the following mauiMd information have been provided by Initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.orglweb/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. I Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VIl belom) 3. Original of the applicable Supplement Forms) (sealed, signed and dated) wi O&M f agreement(s) for each BMW. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to lie.. htto•//www envhelp&M/Rages/onestDRURn s.htmi for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 3/2 mile of the site boundary, include the th mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to t .5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and Corm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal wabers, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. cc �` _- Form SWU-101 Version OcG 31, 2013 Page 4 of 6 E C G I �/ E JAN 2 4 20V BY. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an &Vx11" copy of the NRfS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Scl►edule a site visit for DEMLR to verify the SHVVP prior M subusittal, (910) 796-7378,) 10. A copy of the most current property deed. Deed book: 4628 Page No: 2MO-2384 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC �AYn,_ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hft://www.secakM.state.nc.us/Co[Rorations/­CSearch.asR2i VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed 8UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from ha,oJ/tal ncdenr.org WMr/sst4le-gton5water- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holders) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Adam H. Grady Consulting Firm: Hanover Desigg Services, PA Mailing Address:1123 Floral Parkway City:Wgmington State•NC , _ Zip:28403 Phone: (910 1 343-8002 Fax: (910 1 343,9941 Email•ahgrady@hdsilm.com DL PROPERTY OWNER AUTHORIZATION (if Contact Inforutatiot, iteru 2 lots been filled out, coruplete tins section) L (print or type uaure of person listed in Contact Infonnation, iter►r 2a) WA , certify that I own the property identified in this permit application, and thus give permission to (print or type ►nante of person listed in Constact hybrntation, itelt Ia) NIA with (print or type same of organization listed its Contact Inforntatios, itennt is} NVA to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. 03EIVE Form SWU-101 Version Oct, 31, 2013 Page 5 of 6 JAN 2 q 2017 8Y: As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stDrmwater treatment facility without a valid permit I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action includ' the assessment o civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date:• 13 t 1, ��—�`' �' a Notary Public for the State of County of do hereby certify that ��AS . M OO cJ pe . rsonally Dwared before me this day ofJ ANVAE'Y P I-7 and acknosyledge the due execution a application for a stormitness my hand and official seal, SEAL cc =W w O� O eJ m U� Za21 My commission expires 5�1• X. APPLICANT'S CERTIFICATION ��,rr _ 1, (Pont or type name of person listed in Contact Information, item 1e) . Th O M G S 9. Mc* re . Jr. certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approve4vlens, that the required deed restrictions and protective covenants will be recorded, and that the p ject complies with the requirements of the applicable stormwater rples under 15A N C 2H .1000 an other applicable state storm71,1; ments. a Notary Public for theState of J � L County of - . do hereby certify that o Ma� L MO Q_� A— personally appeared before me this 13 day ofJ AN �A?_�W. and acknowJedge the due exegation oft dapplkation for a stormwat�p�1 ,�Witness my hanal Id J SEAL My commission expires J3+ 5 J C,-I)rJ46 Hampstead Marine Center AS bui� Tions Stormwater Permit No. SW8 170208 Pender County Designer's Certification State Stormwater Management Systems Permit No SW8 170208 c Ac (u AN .as a duly registeredlin the State rth Carolina havingi been authorized to observe iodica weekly/ full time) the construction of the project, =—Alo,do �--, for � _ (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: JZ&,,EAJF n, YZF- - ZO DC*(��JFF4:> J5)3 CAA) SWPe!> CvAOUX 4 DZV HVDDiuf wxe- , FJPDE'b, t7a,114C 7-ft.E 7)PIR To ECEIVEft OCT 17 2013 RV Registration Number Date SEAL r Page 6 of 7 State Stormwater Management Systems Permit No SW8 170208 Certification Requirements- 1 The drainage area to the system contains approximately the permitted acreage. - The drainage area to the system contains no more than the permitted amount of built -upon area. r- 3 All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation..ZXCO/VTa XP'N7Z4:5 - Aw6K-JA�'-. 9. Vegetated slopes are no steeper than 3.1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. %-_12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided14. --14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. Ik15. .16. The required system dimensions are provided per the approved plans. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Wilmington Regional Office Barnes Sutton, Pender County Planning OCT Page 7of7 Hanover Design Services, P.A. Land Surveyors, Engineers, Land Planners October 16, 2018 Ms. Georgette Scott, Stormwater Supervisor Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Pond Certification: Permit # SW8 170208 Hampstead Marine Center HDS # 14212 Georgette: tze- After both observing in the field and evaluating the attached as -built, it is found the pond has been built in substantial compliance with the approved plans. Please see the attached certification and as -built sealed on 10-16-2018. If you have any questions or require additional information, please do not hesitate to call me. Sincer ly, Adam Grady, PiD Hanover Design Services P.A. agrady@hdsilm.com (910) 343-8002 Office (910) 343-9941 Fax 1123 Floral Parkway Wilmington, N.C. 28403 Phone (910) 343-8002 Fax 910) 343-9944 Business Firm License No. C-0597 Permit (to be provided by DWQ) WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information, o�OF. W ATF9pG •� r L PROJEW XFCWATRNi Project name Hampstead Marine Center Contact person Thomas K. Moore, Jr. Phone number 910-232-2272 Date 111912017 REV 3/13/2017 Drainage area number Pond 1 N DESIGN INFORMATION Site Characteristics Drainage area 248,854 fe Impervious area, post -development 149,599 fe % Impervious 60.12 % Design rainfall depth 1.5 in Storage Volume: Non -SA Water Minimum volume required Volume provided Storage Volume: SA Waters 1.5° runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: )-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage providcd Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume `�,385 fe --'4g,552 ft3 OK, volume provided is equal to or in excess of volume required. w A to ft3 ft3 ft (Y or N) 3.7 in 0.20 (unitiess) 0.55 (unitless) 3.23 in/hr OK 4.45 ft3/sec 13.71 fe/sec 9.26 ft3/sec 35.50 fmsl 34.50 fmsl 34.20 fmsl 35.00 fmsl 34.00 1msl 25.00 fmsl 24.00 fmsl 1.00 ft ,��,�,r`il r i Ifill,, gig* CAR(), *"tit Q 151 % ��� SEAL _ 43186 Data not needed for calculation option #1, but OK if provided. Data not needed for calculation option #1, but OK if provided. (YorN) fmsl MAR 15 2014 BY° Form SW401-Wet Detention Basin-Rev.94118r12 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) JIL QE$li3N #100111111111UTION Surface Areas Area, temporary pool 20,060 fe Area REQUIRED, permanent pool 14,931 fe SAIDA ratio 6.00 (unitiess) Area PROVIDED, permanent pool, APamy001 16,187 ft` Area, bottom of 1Oft vegetated shelf, Aw ,hg 12,645 ft' Area, sediment cleanout, top elevation (bottom of pond), AboLpnnd 1,361 ft' Volumes Volume, temporary pool 18,552 fO Volume, permanent pool, VPam-p l 60,500 fO Volume, forebay (sum of forebays if more than one forebay) 13,324 fi3 Forebay % of permanent pool volume 22.0% % SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y-or N) SAIDA ratio 6.00 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vp",,,,yd 60,500 fe Area provided, permanent pool, Ap._pw 16,187 fe Average depth calculated 3.74 ft Average depth used in SAIDA, dw (Round to nearest 0.5ft) 3.5 it Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Apm_,d 16,187 fe Area, bottom of 1 Oft vegetated shelf, Ab�Ls,df 12,645 f( Area, sediment cleanout, top elevation (bottom of pond), Abdrord 1,361 fe "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 9.00 ft Average depth calculated 3.74 ft Average depth used in SAIDA, d",,, (Round to down to nearest 0.5ft) 3.5 ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (If circular) Area of orifice (if -non- ircular) Coefficient of discharge (Co) Driving head (H.) Drawdown through weir? Weir type Coefficient of discharge (Cw) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (throug'h discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to v.4dth ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 2.00 in in 0.60 (unitless) 0.33 ft N (Y or N) (unitless) (unitless) ft ft 4.45 fO/sac 13.71 fislsec 0.06 felsec 3.51 days OK OK Insufficient forebay volume. OK OK OK OK �I�CElVEy� MAR 15 2009 u OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.0 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Portable Pump Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2 Permit Number:G (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a tenance record on this B1i+lI'. This maintenance record will be kept in a log in a known set location. Any deficient BUF elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, Pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the problem The entire BNIP Trash debris is present. Remove the trash debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. Vegetation is too short or too 10n Maintain vegetation at a height of approximately six inches. EC E IV. Form SW401 Wet Detention Basin O&M Rev.4 e I of 4 JAN 2 4 2017 RY:. . BMP element: The inlet device: Swale The forebay bV71 Pennit Number: {to be provided byDWO Drainage Area Number: or I The pipe is treatment area The pipe is cracked or otherwise damaged. Erosion is occurring in the Swale. Sediment has accumulated to a depth greater than the original design depth for sediment storage. has are present. Best professional practices show that pruning is needed to maintain optimal plant health Plants are dead, diseased or dying. are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the Swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BUR Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraytng. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BM?. Consult a professional to remove and control the abet growth. Remove the plants by wiping them with pesticide (do not spray). Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 9.5 feet in the main pond, the sediment shall be removed. ECEIVE When the permanent pool depth reads 5.5 feet in the fo a e" n shall be removed. BY: Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 34.5 29----------- Pe en Pool - Volume - - - - - Sediment Removal Elevation 25 Volume 28 -ft Min. ------------------------------------ V---- Sediment Bottom Elevation 24 1-ft N Storage Sedimex Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Note: The legally responsible party should not be a homeowners association unless more than 50°fo of the lots have been sold and a resident of the subdivision has been named the president. I, H EAT" 5V' AAtA, 5V-- , a Notary Public for the State of G . County of do hereby certify that TH OM AS - Of— personally appeared before me this 13 Tu day of J A NVAr.Y and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, �%�`'" A J LU- IQL�' O G • io�Op�tHP,���