Subject: State Stormwater Management Permit No. SW 170208
Hampstead Marine Center
High Density Wet Detention Pond Project
Pender County
Dear Mr. Moore:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
TRACY DAVIS
Director
The Wilmington Regional Office received a complete, Stormwater Management Permit Application for
Hampstead Marine Center on April 25, 2017. Staff review of the plans and specifications has determined
that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC
2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 170208 dated April 27, 2017,
for the construction, operation and maintenance of the BMP's and built -upon areas associated with the
subject project.
This permit shall be effective from the date of issuance until April 27, 2025, and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the conditions listed in this
permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions,
certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the
permit. Failure to establish an adequate system for operation and maintenance of the stormwater
management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew
the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and
must be filed with the OAH within thirty (3 0) days of receipt of this permit. You should contact the OAH
with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process
at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their
website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Linda
Lewis in the Wilmington Regional Office, at (910) 796-7215.
Sincerely,
Ell
n Tracy Davis, P.E., Director
Division of Energy, Mineral and Land Resources
GDS/arl: G:\\\Stormwater\Permits & Projects\2017\170208 HD\2017 04 permit 170208
cc: Adam Grady, P.E., Hanover Design Services
Barnes Sutton, Pender County Planning
Wilmington Regional Office Stormwater File
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405
910 796 7275
State Stormwater Management Systems
Permit No. SW8 170208
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Coastal Marine Properties, LLC
Hampstead Marine Center
166 Andrew Jackson Lane, Hampstead, Pender County
FOR THE
construction, operation and maintenance of one (1) wet detention ponds in compliance with
the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as
the "stormwater rules') the approved stormwater management plans and specifications and
other supporting data as attached and on file with and approved by the Division of Energy,
Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and
considered a part of this permit.
This permit shall be effective from the date of issuance until April 27, 2025, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff
as described in Section 1.6 of this permit. The runoff from all built -upon area within the
permitted drainage area of this project must be directed into the permitted stormwater
control measure. The stormwater control measure has been designed to handle the
runoff from a total pf 149,599 square feet of impervious area which includes 119,599 sf
currently proposed and 30,000 sf for future development.
3. The overall tract and the drainage area will be limited to the amount of built -upon area
indicated in Sections 1.2 and 1.6 of this permit, and per approved plans.
4. A 50' wide vegetative buffer must be provided and maintained adjacent surface
waters, measured horizontally from and perpendicular to the normal pool of
impounded structures, the top of bank of both sides of streams and rivers and the
mean high water line of tidal waters.
5. All runoff being directed into wetlands shall flow into and through those wetlands at a
non -erosive velocity.
Page 1 of 7
State Stormwater Management Systems
Permit No. SW8 170208
6. The following design criteria have been permitted for the wet detention pond and must
be provided and maintained at the design condition:
Pond 1
a.
Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
5.71
248,854
0
b.
Total Impervious Surfaces, ft2:
Onsite current, ft2:
Onsite Future, ft2:
offsite, ft2-0
149,599
119,599
30,000
c.
Average Pond Design Depth, feet:
3.5
d.
TSS Removal Efficiency:
90%
e.
Design Storm, inches:
1.5
f.
Permanent Pool PP Elevation, FMSL:
34.50
g.
Permitted PP Surface Area, ft2:
16,187
h.
Temporary Storage Elevation, FMSL:
35.50
i.
Permitted Storage Volume, ft3:
18,552
j.
Predevelopment 1 yr-24 hr. discharge
rate, cfs:
4.45
k.
Controlling Orifice, inch 0pipe.-
2.0
I.
Orifice Flow Rate, cfs:
.06
m.
PP Volume, ft :
60,500
n.
Foreba Volume, ft3:
13,324
o.
Maximum Fountain Horsepower:
1/4
p.
Receiving Stream/River Basin:
UT Mullet Run / CPF24
q.
Stream Index Number:
18-87-9-1
r.
Classification of Water Body:
SA (>1/2 mile
II. SCHEDULE OF COMPLIANCE
No component of the approved stormwater management system and the runoff
collection system shown on the approved plans shall be altered in any way unless and
until the Division has approved of the revised plan.
2. The stormwater management system shall be entirely constructed, vegetated and fully
operational for its permitted use prior to the construction of any built -upon surface.
3. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately. If the stormwater system is used as an Erosion
Control device, it must be restored to design condition prior to operation as a
stormwater treatment device, and prior to occupancy of the facility.
4. The permittee shall at all times provide the operation and maintenance necessary to
assure that all components of the permitted stormwater system function at design
condition. The approved Operation and Maintenance Agreement is incorporated by
reference into this permit and must be followed in its entirety and maintenance must
occur at the scheduled intervals.
5. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. "The records will indicate the date, activity, name
of person performing the work and what actions were taken.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 170208
6. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray
fountain will be allowed in the stormwater treatment system, subject to the following
criteria:
a. The fountain must draw its water from less than 2' below the permanent pool
surface.
b. Separated units, where the nozzle, pump and intake are connected by tubing,
may be used only if they draw water from the surface in the deepest part of the
pond.
C. The falling water from the fountain must be centered in the pond, away from the
shoreline.
d. The maximum horsepower for a fountain in this pond is 1/4 horsepower.
7. The facilities shall be constructed in accordance with the conditions of this permit, the
approved plans and specifications, and other supporting data.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, the permittee shall cause a certification from
an appropriate designer for the system installed to be submitted, certifying that the
permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A modification
may be required for those deviations.
9. All stormwater collection and treatment systems must be located in either public rights -
of -way, dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such rights -of -way, common areas and
easements, in accordance with the approved plans. Access to the stormwater facilities
for inspection and maintenance shall be maintained via appropriate recorded
easements to the nearest public right-of-way.
10. The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of
the project area. The project area is defined as all property owned by the
permittee, for which Sedimentation and Erosion Control Plan approval or a
CAMA Major permit was sought.
d. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
e. The construction of any future BUA listed on the application.
f. The construction of any permeable pavement for BUA credit.
11. Prior to transfer of the permit, the stormwater facilities will be inspected by Division
personnel. The project and the stormwater facility must be in substantial compliance
with all permit conditions. Any items not in substantial compliance must be repaired,
replaced or restored to design condition prior to the transfer. Records of maintenance
activities performed to date will be required.
12. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 170208
III. GENERAL CONDITIONS
1. Any individual or entity found to be in noncompliance with the provisions of a
stormwater management permit or the requirements of the Stormwater rules is subject
to enforcement procedures as set forth in NCGS 143 Article 21.
2. The issuance of this permit does not preclude the Permittee from complying with any
and all statutes, rules, regulations, or ordinances, which may be imposed by other
government agencies (local, state, and federal) having jurisdiction.
3. In the event that the facilities fail to perform satisfactorily the Permittee shall take
immediate corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management systems.
Additional or replacement stormwater management systems shall receive a permit
from the Division prior to construction.
4. This permit is not transferable to any person or entity except after notice to and
approval by the Director. The permittee shall submit a completed and signed Permit
Transfer Application Form, accompanied by the supporting documentation and
processing fee as listed on the form, to the Division of Energy, Mineral and Land
Resources at least 60 days prior to any one or more of the following events:
a. An ownership change including the sale or conveyance of the project area in
whole or in part, except in the case of an individual lot sale that is made subject to
the recorded deed restrictions;
b. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of Session Law 2011-256,
c. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121;
e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e)
and NCGS 57D-6-07;
f. A name change of the current permittee;
g. A name change of the project;
h. A mailing address change of the permittee;
5. The permittee is responsible for compliance with all permit conditions until such time
as the Division approves the transfer request. Neither the sale of the project, in whole
or in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the stormwater permit.
6. The permittee grants DEMLR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until modified, revoked, terminated
or renewed. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Approved plans, calculations, supplement forms, operation and maintenance
agreements and specifications for this project are incorporated by reference and are
enforceable parts of the permit. A copy of the approved plans and specifications shall
be maintained on file by the Permittee at all times.
9. Unless specified elsewhere, permanent seeding requirements for the stormwater
control measure must follow the guidelines established in the North Carolina Erosion
and Sediment Control Planning and Design Manual.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 170208
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit as
allowed by the laws, rules and regulations contained in Session Law 2006-246, Title
15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall submit a permit renewal application request at least 180 days prior
to the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee.
Permit issued this the 27th day of April 2017.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
E K.Tracy Da , P.E., Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 170208
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 170208
Hampstead Marine Center
Stormwater Permit No. SW8 170208
Pender County
Designer's Certification
I, , as a duly registered in the State
of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the
construction of the project,
(Project)
for (Project Owner) hereby state that, to the best
of my abilities, due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance and intent
of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 170208
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount
of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting
of the system.
11. The permitted amounts of surface area and/or volume have been provided.
12. Required drawdown devices are correctly sized and located per the approved
plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, and a
forebay.
15. The required system dimensions are provided per the approved plans.
16. All components of the stormwater BMP are located in either recorded common
areas, or recorded easements.
cc: NCDEQ-DEMLR Wilmington Regional Office
Barnes Sutton, Pender County Planning
Page 7 of 7
DEML.R USE ONLY
Date ecei ed
Fee Paid
Permit Number
J
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW 4 2008 ❑ Ph II - Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ Mgmt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Hampstead Marine Center
2. Location of Project (street address):
166 Andrew Tackson Ln
City:Hampstead County:Pender Zip:28443
3. Directions to project (from nearest major intersection):
The Site is aRRrox. 0.37 miles southwest of the intersection of US 17/210 and Sloop Point Road and is located
on the eastern side of US 17/NC210
4. Latitude:34* 25' 49" N Longitude:-77° 38' 07" W of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt
tRenewals with modifications also requires SMI 102 - Renewal Application Form
b. If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) . and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density NHigh Density []Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major
❑NPDES.Industrial Stormwater
❑Sedimentation/Erosion Control: 5.59 ac of Disturbed Area
❑404/401 Permit: Proposed Impacts
b. if any of these permits have already been acquired please provide the Project Name, Project/ Permit Number,
issue date and the type of each permit:
5. Is the project located within 5 miles of a public airport? NNo ❑Yes �AM Z���
If yes, see S.L. 2012-200, Part VI: htW://12ortal.ncdenr.org/web/lr/rules-and-regulations
Form SWU-101 Version Oct. 31, 2013 Page 1 of 6
ill. CONTACT INFORMATION
1. a. Print Applicant / Signing OfficiaPs name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the vroject):
Applicant/Organization Coestal Marine Properties, LLC
Signing Official & Title:Thomas K. Moore, Tr., Member Manager
b.Contact information for person listed in item la above:
Street Address104 Wyndham Way
City:Wilmington State•NC Zip:28411
Mailing Address ((fapplicable):104 Wyndham Way
City:Wilmington
State•NC Zip:28411
Phone: f916 1 232 2272 Fax: L l
Emaildaddetaflodftgil.com
c. PIease check the appropriate box. The applicant listed above is:
® The property owner (Slap to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/Organization:N/A
Signing Official & Title:
b.Contact information for person listed in item 2a above.
Street Address:
City: State -_Zip:
Mailing Address (if applicable):
City: State- Zip:
Phone: ( ) Fax:
Email:
3. a. (Optional) Print the name and title of another contact such as the projecfs construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization:N/A
Signing Official & Title
b.Contact information for person listed in item 3a above:
Mailing Address
City: Stake: Zip:
Phone: ( ) Fax: ( 1
Email:
4. Local jurisdiction for building permits fender County
Point of Contact:Barnes F%tton Phone $: (910 ) 27M161
—EIVE.
Fonn SWU-101 Version Opt. 31, 2013 Page 2 oft
JAN 2 4 2017
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater Runoff from the drainage area will be collected by means of invereted crown drop inlets and
storm sewer. The run-off will be treated in a wet detention basin. After treatment the pond outflows to the
on site wetlands which drain into an unnamed tributairy that flows into Mullet Run 18-87-9-1
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the White Oak River basin.
4. Total Property Area:18.65 acres 5. Total Coastal Wetlands Area:10.58 acres
6. Total Surface Water Area: N/A acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area+:8.07 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal Hi h Water (NHvvJ line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or Za line. The resultant project area is used to
calculate overall percent built upon area (B A). Non -coastal wetlands landward of the NHW (or MHK9 line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 43.6 %
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area 2
Drainage Area
Drama a Area
Receiving Stream Name
Mullet Run
Stream Class *
SA; HQW
Stream Index Number *
18-87-9-1IMF
Total Drainage Area (sf)
248,854
On -site Drainage Area (sf)
248,854
MAN 15
Off -site Drainage Area (sf)
0
Proposed Impervious Area** s
149,599
Y�
% Impervious Area** total
60
Impervious`* Surface Area
Drainage Area 1
Drama a Area ?
Drama a Area
Drama Area _
On -site Buildings/Lots (sf)
35,824
On -site Streets (sf)
77,457
On -site Parking (sf)
-
On -site Sidewalks (sf)
318
Other on -site (sf)
6000
Future (sf)
30,000
Off -site (sf)
N/A
Existing BUA*** (so
N/A
Total (sf):
149,599
R Stream Class and Index_ Number can be determined at: http*ortal.nedenr.org/web/wq/ps/csu/classi cations
Form SWU-101 Version Oct. 31, 2013 Page 3 of 6
'* lnsidepermts area is defined as the bidit upon area including, but not limited to, buildings, roads, parking areas,
gravel areas, etc.
Report only that amount of existing B UA that u471 rematlt after development. Do not report any existing BUA that
is to be removed and which will be replaced by new BUA.
11. How was the off -site impervious area listed above determined? Provide documentation. N/A
proiects in buion county: Contact DEMLR Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http.//porW.ncdenr.org web/wq/ws/sg[bmR:manual
Vl. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application
instruction sheet and BMP checklists are available from
Ettp:/l .2rt&Lncdenr.orLr/web/wo/ws/su/statesw/fgt= doc;. The complete application package should be
submitted to the appropriate DEMLR Office. (the appropriate office may be found by locating project on the
interactiveonNnemapath!M://Wrtal.ncdenr.orizweb/wq/wslsu/mans.)
Please indicate that the following mauiMd information have been provided by Initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://portal.ncdenr.orglweb/wq/ws/su/statesw/forms does.
Initials
1. Original and one copy of the Stormwater Management Permit Application Form.
I Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants
Form. (if required as per Part VIl belom)
3. Original of the applicable Supplement Forms) (sealed, signed and dated) wi O&M f
agreement(s) for each BMW.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to lie..
htto•//www envhelp&M/Rages/onestDRURn s.htmi for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor
the project. This is required in addition to the brief summary provided in the Project
Information, item 1.
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 3/2 mile of the site boundary, include the th
mile radius on the map.
7. Sealed, signed and dated calculations (one copy).
8. Two sets of plans folded to t .5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and Corm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
wabers, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. Details of roads, drainage features, collection systems, and stormwater control measures.
cc �` _-
Form SWU-101 Version OcG 31, 2013 Page 4 of 6 E C G I �/ E
JAN 2 4 20V
BY.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an &Vx11" copy of the NRfS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Scl►edule a site visit for DEMLR to verify the SHVVP prior
M subusittal, (910) 796-7378,)
10. A copy of the most current property deed. Deed book: 4628 Page No: 2MO-2384
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC �AYn,_
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
hft://www.secakM.state.nc.us/Co[Rorations/CSearch.asR2i
VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
8UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided
as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and
protective covenants forms can be downloaded from ha,oJ/tal ncdenr.org WMr/sst4le-gton5water-
forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holders) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:Adam H. Grady
Consulting Firm: Hanover Desigg Services, PA
Mailing Address:1123 Floral Parkway
City:Wgmington State•NC , _ Zip:28403
Phone: (910 1 343-8002 Fax: (910 1 343,9941
Email•ahgrady@hdsilm.com
DL PROPERTY OWNER AUTHORIZATION (if Contact Inforutatiot, iteru 2 lots been filled out, coruplete tins
section)
L (print or type uaure of person listed in Contact Infonnation, iter►r 2a) WA , certify that I
own the property identified in this permit application, and thus give permission to (print or type ►nante of person
listed in Constact hybrntation, itelt Ia) NIA with (print or type same of organization listed its
Contact Inforntatios, itennt is} NVA to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
03EIVE
Form SWU-101 Version Oct, 31, 2013 Page 5 of 6 JAN 2 q 2017
8Y:
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stDrmwater
treatment facility without a valid permit I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement
action includ' the assessment o civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature: Date:•
13 t
1, ��—�`' �' a Notary Public for the State of County of
do hereby certify that ��AS . M OO cJ pe . rsonally Dwared
before me this day ofJ ANVAE'Y P I-7 and acknosyledge the due execution a application for
a stormitness my hand and official seal,
SEAL
cc
=W w O�
O eJ m U�
Za21
My commission expires 5�1•
X. APPLICANT'S CERTIFICATION ��,rr _
1, (Pont or type name of person listed in Contact Information, item 1e) . Th O M G S 9. Mc* re . Jr.
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approve4vlens, that the required deed restrictions
and protective covenants will be recorded, and that the p ject complies with the requirements of the
applicable stormwater rples under 15A N C 2H .1000 an other applicable state storm71,1;
ments.
a Notary Public for theState of J � L County of
- . do hereby certify that o Ma� L MO Q_� A— personally appeared
before me this 13 day ofJ AN �A?_�W. and acknowJedge the due exegation oft dapplkation for
a stormwat�p�1 ,�Witness my hanal Id
J
SEAL
My commission expires
J3+ 5
J C,-I)rJ46
Hampstead Marine Center AS bui� Tions
Stormwater Permit No. SW8 170208
Pender County
Designer's Certification
State Stormwater Management Systems
Permit No SW8 170208
c Ac (u
AN
.as a duly registeredlin the State
rth Carolina havingi been authorized to observe iodica weekly/ full time) the
construction of the project,
=—Alo,do �--,
for � _ (Project Owner) hereby state that, to the best
of my abilities, due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance and intent
of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
JZ&,,EAJF n, YZF- - ZO DC*(��JFF4:> J5)3 CAA) SWPe!>
CvAOUX 4 DZV HVDDiuf wxe- ,
FJPDE'b, t7a,114C 7-ft.E 7)PIR To
ECEIVEft
OCT 17 2013
RV
Registration Number
Date
SEAL r
Page 6 of 7
State Stormwater Management Systems
Permit No SW8 170208
Certification Requirements-
1
The drainage area to the system contains approximately the permitted acreage.
-
The drainage area to the system contains no more than the permitted amount
of built -upon area.
r- 3
All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4.
All roof drains are located such that the runoff is directed into the system.
5.
The outlet structure elevations are per the approved plan
6.
The outlet structure is located per the approved plans.
7.
Trash rack is provided on the outlet structure.
8.
All slopes are grassed with permanent vegetation..ZXCO/VTa XP'N7Z4:5 - Aw6K-JA�'-.
9.
Vegetated slopes are no steeper than 3.1.
10.
The inlets are located per the approved plans and do not cause short-circuiting
of the system.
11.
The permitted amounts of surface area and/or volume have been provided.
%-_12.
Required drawdown devices are correctly sized and located per the approved
plans.
13.
All required design depths are provided14.
--14.
All required parts of the system are provided, such as a vegetated shelf, and a
forebay.
Ik15.
.16.
The required system dimensions are provided per the approved plans.
All components of the stormwater BMP are located in either recorded common
areas, or recorded easements.
cc: NCDEQ-DEMLR Wilmington Regional Office
Barnes
Sutton, Pender County Planning
OCT
Page 7of7
Hanover Design Services, P.A.
Land Surveyors, Engineers, Land Planners
October 16, 2018
Ms. Georgette Scott, Stormwater Supervisor
Department of Environment and Natural Resources
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Re: Pond Certification: Permit # SW8 170208
Hampstead Marine Center
HDS # 14212
Georgette:
tze-
After both observing in the field and evaluating the attached as -built, it is found the pond
has been built in substantial compliance with the approved plans. Please see the attached
certification and as -built sealed on 10-16-2018.
If you have any questions or require additional information, please do not hesitate to call
me.
Sincer ly,
Adam Grady, PiD
Hanover Design Services P.A.
agrady@hdsilm.com
(910) 343-8002 Office
(910) 343-9941 Fax
1123 Floral Parkway Wilmington, N.C. 28403 Phone (910) 343-8002 Fax 910) 343-9944
Business Firm License No. C-0597
Permit
(to be provided by DWQ)
WDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information,
o�OF. W ATF9pG
•� r
L PROJEW XFCWATRNi
Project name
Hampstead Marine Center
Contact person
Thomas K. Moore, Jr.
Phone number
910-232-2272
Date
111912017 REV 3/13/2017
Drainage area number
Pond 1
N DESIGN INFORMATION
Site Characteristics
Drainage area
248,854 fe
Impervious area, post -development
149,599 fe
% Impervious
60.12 %
Design rainfall depth
1.5 in
Storage Volume: Non -SA Water
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5° runoff volume
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the pre/post control of the 1 yr 24hr storm peak flow required?
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: )-yr, 24-hr storm
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the perm. pool elevation)
Top of 1 Oft vegetated shelf elevation
Bottom of 1 Oft vegetated shelf elevation
Sediment cleanout, top elevation (bottom of pond)
Sediment cleanout, bottom elevation
Sediment storage providcd
Is there additional volume stored above the state -required temp. pool?
Elevation of the top of the additional volume
`�,385 fe
--'4g,552 ft3 OK, volume provided is equal to or in excess of volume required.
w
A
to
ft3
ft3
ft
(Y or N)
3.7 in
0.20 (unitiess)
0.55 (unitless)
3.23 in/hr OK
4.45 ft3/sec
13.71 fe/sec
9.26 ft3/sec
35.50 fmsl
34.50 fmsl
34.20 fmsl
35.00 fmsl
34.00 1msl
25.00 fmsl
24.00 fmsl
1.00 ft
,��,�,r`il r i Ifill,,
gig* CAR(),
*"tit
Q 151 % ���
SEAL _
43186
Data not needed for calculation option #1, but OK if provided.
Data not needed for calculation option #1, but OK if provided.
(YorN)
fmsl
MAR 15 2014
BY°
Form SW401-Wet Detention Basin-Rev.94118r12 Parts I. & II. Design Summary, Page 1 of 2
Permit No.
(to be provided by DWQ)
JIL QE$li3N #100111111111UTION
Surface Areas
Area, temporary pool
20,060 fe
Area REQUIRED, permanent pool
14,931 fe
SAIDA ratio
6.00 (unitiess)
Area PROVIDED, permanent pool, APamy001
16,187 ft`
Area, bottom of 1Oft vegetated shelf, Aw ,hg
12,645 ft'
Area, sediment cleanout, top elevation (bottom of pond), AboLpnnd
1,361 ft'
Volumes
Volume, temporary pool
18,552 fO
Volume, permanent pool, VPam-p l
60,500 fO
Volume, forebay (sum of forebays if more than one forebay)
13,324 fi3
Forebay % of permanent pool volume
22.0% %
SAIDA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
Y (Y or N)
Mountain/Piedmont SAIDA Table Used?
N (Y-or N)
SAIDA ratio
6.00 (unitless)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
Y (Y or N)
Volume, permanent pool, Vp",,,,yd
60,500 fe
Area provided, permanent pool, Ap._pw
16,187 fe
Average depth calculated
3.74 ft
Average depth used in SAIDA, dw (Round to nearest 0.5ft)
3.5 it
Calculation option 2 used? (See Figure 10-2b)
N (Y or N)
Area provided, permanent pool, Apm_,d
16,187 fe
Area, bottom of 1 Oft vegetated shelf, Ab�Ls,df
12,645 f(
Area, sediment cleanout, top elevation (bottom of pond), Abdrord
1,361 fe
"Depth" (distance b/w bottom of 1 Oft shelf and top of sediment)
9.00 ft
Average depth calculated
3.74 ft
Average depth used in SAIDA, d",,, (Round to down to nearest 0.5ft)
3.5 ft
Drawdown Calculations
Drawdown through orifice?
Diameter of orifice (If circular)
Area of orifice (if -non- ircular)
Coefficient of discharge (Co)
Driving head (H.)
Drawdown through weir?
Weir type
Coefficient of discharge (Cw)
Length of weir (L)
Driving head (H)
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Storage volume discharge rate (throug'h discharge orifice or weir)
Storage volume drawdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to v.4dth ratio
Trash rack for overflow & orifice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies is:
Y (Y or N)
2.00 in
in
0.60 (unitless)
0.33 ft
N (Y or N)
(unitless)
(unitless)
ft
ft
4.45 fO/sac
13.71 fislsec
0.06 felsec
3.51 days
OK
OK
Insufficient forebay volume.
OK
OK
OK
OK
�I�CElVEy�
MAR 15 2009 u
OK, draws down in 2-5 days.
3 :1
OK
10 :1
OK
10.0 ft
OK
3 :1
OK
2.0 :1
OK
Y (Y or N)
OK
1.0 ft
OK
N (Y or N)
OK
Y (Y or N)
OK
Y (Y or N)
OK
Portable Pump
Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2
Permit Number:G
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a tenance record on this B1i+lI'. This maintenance record will be kept in a
log in a known set location. Any deficient BUF elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
Pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
- Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate the problem
The entire BNIP
Trash debris is present.
Remove the trash debris.
The perimeter of the wet
detention basin
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then plant a
ground cover and water until it is
established. Provide time and a
one-time fertilizer application.
Vegetation is too short or too
10n
Maintain vegetation at a height of
approximately six inches.
EC E IV.
Form SW401 Wet Detention Basin O&M Rev.4 e I of 4
JAN 2 4 2017
RY:. .
BMP element:
The inlet device:
Swale
The forebay
bV71
Pennit Number:
{to be provided byDWO
Drainage Area Number:
or I The pipe is
treatment area
The pipe is cracked or
otherwise damaged.
Erosion is occurring in the
Swale.
Sediment has accumulated to
a depth greater than the
original design depth for
sediment storage.
has
are present.
Best professional practices
show that pruning is needed
to maintain optimal plant
health
Plants are dead, diseased or
dying.
are present.
Sediment has accumulated to
a depth greater than the
original design sediment
storage depth.
Algal growth covers over
50% of the area.
Cattails, phragmites or other
invasive plants cover 50% of
the basin surface.
Unclog the pipe. Dispose of the
sediment off -site.
Replace the pipe.
Regrade the Swale if necessary to
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BUR
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraytng.
Prune according to best professional
practices
Determine the source of the
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BM?.
Consult a professional to remove
and control the abet growth.
Remove the plants by wiping them
with pesticide (do not spray).
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 9.5 feet in the main pond, the sediment
shall be removed. ECEIVE
When the permanent pool depth reads 5.5 feet in the fo a e" n
shall be removed.
BY:
Sediment Removal
Bottom
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 34.5
29----------- Pe en Pool
- Volume - - - - - Sediment Removal Elevation 25 Volume
28 -ft Min.
------------------------------------ V----
Sediment Bottom Elevation 24 1-ft N
Storage Sedimex
Storage
FOREBAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4
Note: The legally responsible party should not be a homeowners association unless more than 50°fo of
the lots have been sold and a resident of the subdivision has been named the president.
I, H EAT" 5V' AAtA, 5V-- , a Notary Public for the State of
G . County of do hereby certify that
TH OM AS - Of— personally appeared before me this 13 Tu
day of J A NVAr.Y and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
�%�`'"
A J
LU- IQL�' O
G
•
io�Op�tHP,���