Loading...
HomeMy WebLinkAbout20231022 Ver 1_ePCN Application_20230720DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 5/12/2022 BIMS # Assigned 20231022 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Mooresville Regional Office - (704) 663-1699 Information for Initial Review la. Name of project: Penny Way la. Who is the Primary Contact? Jon Grabowski 1b. Primary Contact Email: * jrobertson@atiasenvi.com Date Submitted 7/20/2023 Nearest Body of Water Little Sugar Creek Basin Catawba Water Classification Class C Site Coordinates Latitude: 35.261445° A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Mecklenburg Is this a NCDMS Project Yes No Longitude: -80.7945280 Version#* 1 What amout is owed?* $240.00 $570.00 Select Project Reviewer* Andrew Pitner:andrew.pitner@ncdenr.gov 1c. Primary Contact Phone: * (331)600-7248 Q V Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 29 - Residential Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying forthe permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Richard Penny Cobb 2b. Deed book and page no.: 11547 / 604 and 11547 / 604 2c. Contact Person: 2d.Address Street Address 4303 Penny Way Address Line 2 city Charlotte Postal / Zip Code 28213 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA Yes No Yes No 2e. Telephone Number: (331)600-7248 2g. Email Address: jon@redcedarco.com 2a. Name(s) on recorded deed: Charles Wesley Cobb 2b. Deed book and page no.: 37005/840 2c. Contact Person: 2d. Address Street Address 240 W Sugar Creek Road Address Line 2 city Charlotte Postal / Zip Code 28213 2e. Telephone Number: (331)600-7248 2g. Email Address:* jon@redcedarco.com 3. Applicant Information (if different from owner) 3a. Name: Jon Grabowski 3b. Business Name: Red Cedar Construction, LLC 3c.Address Street Address 2020 S Tryon Street Suite #2a Address Line 2 city Charlotte Postal / Zip Code 28203 3d. Telephone Number: (331)600-7248 3f. Email Address:* jon@redcedarco.com 4. Agent/Consultant (if applicable) 4a. Name: Jennifer Robertson 4b. Business Name: Atlas Environmental 4c.Address Street Address 338 S. Sharon Amity Road #411 Address Line 2 city Charlotte Postal / Zip Code 28211 4d. Telephone Number: (704)512-1206 4f. Email Address:* jrobertson@atiasenvi.com 2f. Fax Number: State / Province / Region NC Country USA 2f. Fax Number: State / Province / Region NC Country USA 3e. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: C. Project Information and Prior Project History 0 1. Project Information 1b. Subdivision name: (if appropriate) Sugar Creek Townhomes 1c. Nearest municipality I town: Charlotte 2. Project Identification 2a. Property Identification Number: 08901106,08901105,08901101 2c. Project Address Street Address 4303 Penny Way Address Line 2 city Charlotte Postal / Zip Code 28213 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Little Sugar Creek 3b. Water Resources Classification of nearest receiving water:" Class C 3c. What river basin(s) is your project located in? Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501030102 4. Project Description and History 2b. Property size: 3.98 State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: " The project site is mostly forested with two houses with maintained yards within the review area. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 367 linear feet 4h. Explain the purpose of the proposed project:* Construction of residential development of 40 townhome units. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: Construction will include residential development of 40 units with road ways and includes two stormwater BMPs with associated utilities. Heavy equipment will be used for land clearing and grading as well as construction of one road crossing, and headwalls will be used above and below the road crossing to minimize stream impacts. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No Unknown Comments: Delineation was completed on March 11, 2022 by Atlas Staff 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: Field verified by Steve Kichefski in August 2022. 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans Austin Baggarley, Jennifer Robertson Atlas Environmental Inc. 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? NO D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 3. Stream Impacts V 3a. Reason for impact (?) 3b.lmpact type" 3c. Type of impact* 3d. S. name* 3e. Stream Type* 3f. Type of 3g. S. width 3h. Impact F1 Jurisdiction * length * S1 Road Crossing Permanent Excavation CH 100 Intermittent Both 29 Averege(feeq (iinearfeet) g2 Road Crossing Permanent Culvert CH 100 Intermittent Both 49 Aveage ((eet) (linear feet) S3 Road Crossing 9 Permanent Rip Rap Fill P P CH 100 Intermittent Both 4 35 Average (feet) (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 113 3i. Total stream and ditch impacts: 113 3j. Comments: S1 is 0.003 acre, S2 is 0.004 acre, S3 is 0.003 acre. E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 0 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The site has been designed and engineered to avoid and minimize impacts to the greatest extent possible. There is approximately 367 linear feet of stream channel. The development of the property, including approximately 40 dwellings on 3.96 acres, is being accomplished with only one road crossing. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction and engineering techniques are being applied to further minimize impacts from the development to aquatic resources. There are two retaining walls at the stream crossing one above and one below. The upstream walls is approximately 100 linear feet and the downstream wall is approximately 102 linear feet. Impact S3 is being permitted to insure long term stability and prevent erosion due to the stream crossing. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts are under the mitigation threshold of a Nationwide Permit 29. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 0 V 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Project is not adjacent to protected buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. City of Charlotte Comments: The project engineer is coordinating all of the stormwater requirements. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. This is a single and compete project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?" Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Project will connect to municipal sewer. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?" Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?" Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPAC and the NC natural heritage program; FWS Asheville office coordination, See attached letter from FWS 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA essential fish habitat mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC HPO Buffer Map, Comment letter attached from NC HPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8c. What source(s) did you use to make the floodplain determination? FEMA floodmaps GIS layer Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Penny Way ePCN Attachments Compressed.pdf 4.12MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Austin Baggarley Signature 6;4,441* r WW-t?e , Date 7/20/2023 O