Loading...
HomeMy WebLinkAboutNCC214389_NOT Closeout Documents_20230720 E ;,; JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT 1°iauwa4l I � ti�d;1 SEDIMENTATION INSPECTION REPORT 309 E.MARKET STREET,SMITHFIELD,N C 27577-TELEPHONE(919)209-8333 Inspection Information Date: 7/18/2023 Type of Inspection Construction Stage Date of Inspection: 7/17/2023 ❑ Initial Inspection ❑ Pre-Construction ❑ Routine Site Inspection ❑X Initial Grading Inspection by: Shannon Stanley El On-SiteMeeting ElInfrastructure • ❑ Progress Inspection ❑ Temp Site Stabilization Others Present: Click or tap here to enter ❑X Final Inspection ❑ Vertical text. Photos: El Yes E No ElPlat Inspection ® Final Site Stabilization ❑ Spot Check Inspection Weather and Site Conditions: ❑ Complaint Inspection Sunny and workable Development/Owner Information Project Name: Goodling Rd SD Project Number: 21-021-P Project Location: Goodling Road This Report Sent To: Cary Chandler Email: Click or tap here to enter text. ❑X File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing All homes sold. Activity: ❑ Same as owner RRT Development 6. Comments/Notes: Closeout inspection. The erosion control permit for Johnston County is closed. 7. Corrective Actions: a. 8. Photos: