HomeMy WebLinkAboutNCC214389_NOT Closeout Documents_20230720 E ;,; JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT
1°iauwa4l I
� ti�d;1 SEDIMENTATION INSPECTION REPORT
309 E.MARKET STREET,SMITHFIELD,N C 27577-TELEPHONE(919)209-8333
Inspection Information
Date: 7/18/2023 Type of Inspection Construction Stage
Date of Inspection: 7/17/2023 ❑ Initial Inspection ❑ Pre-Construction
❑ Routine Site Inspection ❑X Initial Grading
Inspection by: Shannon Stanley El On-SiteMeeting ElInfrastructure
• ❑ Progress Inspection ❑ Temp Site Stabilization
Others Present: Click or tap here to enter ❑X Final Inspection ❑ Vertical
text.
Photos: El Yes E No ElPlat Inspection ® Final Site Stabilization
❑ Spot Check Inspection
Weather and Site Conditions: ❑ Complaint Inspection
Sunny and workable
Development/Owner Information
Project Name: Goodling Rd SD Project Number: 21-021-P
Project Location: Goodling Road This Report Sent To: Cary Chandler
Email: Click or tap here to enter text.
❑X File Copy
Land Owner of Record: Person Financially Responsible for Land Disturbing
All homes sold. Activity: ❑ Same as owner
RRT Development
6. Comments/Notes:
Closeout inspection. The erosion control permit for Johnston County is closed.
7. Corrective Actions:
a.
8. Photos: