Loading...
HomeMy WebLinkAboutWQ0002708_Monitoring - 06-2023_20230725Monitoring Report Submittal Permit Number#* Name of Facility:* Month:* June WQ0002708 Wrenn Road WWTF Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2023 Upload Document* June 2023 WQ0002708 NDMR.pdf 1.06MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). marla.dalton@raleighnc.gov Marla Dalton t/'? ow-'w Reviewer: Wanda.Gerald 7/25/2023 This will be filled in automatically Is the project number correct?* W00002708 Is the monitoring report accepted?* Yes NO Regional Office* Raleigh Reviewer: _anonymous Review Date: 7/25/2023 Permit No.: WQ0002708 Facility Name: Wrenn Road WWTF County: Wake Month: June Year: 2023 PPI: 001 Flow Measuring Point: [3 Influent Effluent 13 31616 No Flow 01045 �vr I N C (d Parameter Monitoring Point: Effluent _ Parameter Code W001 01002 --------------- 00310 00916 0 50060 00927 01055 00600 00400 r 00665 00931 00929 T [9 E OO c O N LL ro p y C ¢ ug/L O ❑ U In o N �q L) m y Fo C (N L .0 N V E o CD U- rn .N rn ftl F G C� R o 9^ Z � a ° a "" N@ E 3 O Q io Q o 9 m (II V1 24-hr hrs Gallons mg/L mg/L mg mg/L #/100ml ug/L mg1L ug/L mg/L su mg/L ratio mg/L 1 1100 2 0 2 7:00 10 0 _ 3 8:00 5 0 4 9:00 8 0 - 5 1:00 2 0 - - 6 6:00 10 = 0 7 6:00 10 0- 8 6:00 10 0 - - 9 0 - - - -- 10 0 11 0 12 6:00 10 -0 13 6:00 10 0 14 6:00 10 0 15 6:00 10 0 - 16 0 -- -- —� - 17 0 18 p 19 0 20 6:00 10 0- 21 6:00 10 0 j 22 6:00 10 0 23 0 24 0 25 p- - 26 6:00 10 0 f 27 6:00 10 0 i 28 6:00 10 0 - 29 6:00 10 0 30 0 31 Average: 0.00 Daily Maximum: 0 _ Daily Minimum: 0 Total 0 Grab Sampling Type: Recorded Grab Grab Grab Grab Grab Graben Grab Grab Grab,.' Grab Grab Grab Grab Monthly Limit: 662,885 IT• - 1 � 0 y i 1 hrs W, JUMIL M --- I .� i KNOW .- .�. .C� �.�... Sampling • r....�... Permit No.: WQ0002708 Certified Laboratories Name: Plant Personnel (Names on File) Name: Neuse Plant Lab (51) Name: Name: Pace Analytical, Meritech Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? Yes If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. No t��i QGfiG♦',t' i IuAt Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Marla Dalton Certification No.: 995909 Grade: SI Phone Number: (919) 996-3700 Has the ORC changed since the previous NDMR? Yes v Signature / bate By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee: City of Raleigh Signing Official: Lisa Joseph Signing Officials Title: Resource Recovery Superintendent Phone Number: (919) 996-3700 Permit Expiration: 09130I2( '2,Wa�a3 Signature Date I certify, under penalty of law, that this document and all attachments were prepared under i direction or supervision in accordance with a system designed to assure that all qualified pers properly gathered and evaluated the information submitted. Based on my inquiry of the persc persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate complete. I am aware that there are significant penalties for submitting false information, inclL the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center