HomeMy WebLinkAbout20231020 Ver 1_Sketch_20230724Full PnnA ■
Nam
Lake
(At Full %ndlNarm j WatarWveJ
ND _TZEFS Rew
AkTfV I J-4k L D ksrja -& r
Ta 3U F ,
L!S i N 4) [-ON(.) )Z
1 v
Pleas& approx]rnatelY sketch the followinginformatlon on thl, plan
Ptern, such as I oft x 10o ft; *: pmuid� dJrr►ensions for k
1. All proposed vegetation clearing
Z• l.Ocation of rip rap or fill to be placed above the Fern Por�d/Normal Water Lev
3. location of rip rap ❑r flN to be placed below the Full Pond/ Normal Water Leval elevation
4 Lncatrfln of any proposed structures such as buildings,elevatiar
5- Locotlon ofanY excavatlon ar dredging belvwthe F Pod/ Narmaf�WatekLevel elevat
5. LOc8tlon OfcOnstrucklon access Corridors ion
FQRW SSGP Ip-2pL3
Page 3 of 3