Loading...
HomeMy WebLinkAbout20231020 Ver 1_Site Plan_20230724Full PnnA ■ Nam Lake (At Full %ndlNarm j WatarWveJ ND _TZEFS Rew AkTfV I J-4k L D ksrja -& r Ta 3U F , L!S i N 4) [-ON(.) )Z 1 v Pleas& approx]rnatelY sketch the followinginformatlon on thl, plan Ptern, such as I oft x 10o ft; *: pmuid� dJrr►ensions for k 1. All proposed vegetation clearing Z• l.Ocation of rip rap or fill to be placed above the Fern Por�d/Normal Water Lev 3. location of rip rap ❑r flN to be placed below the Full Pond/ Normal Water Leval elevation 4 Lncatrfln of any proposed structures such as buildings,elevatiar 5- Locotlon ofanY excavatlon ar dredging belvwthe F Pod/ Narmaf�WatekLevel elevat 5. LOc8tlon OfcOnstrucklon access Corridors ion FQRW SSGP Ip-2pL3 Page 3 of 3