HomeMy WebLinkAbout20231019 Ver 1_Pictures_20230724CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: Grassy Farms LLC- 111 Lakeside Loop County: Alexander
Owner:
Print v Signature
Contractor/agent: Charlie Washburn — Marine Construction
Print
Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule_ Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
1, Brassy Farms LI C , hereby state that I have been informed of the Catawba Riparian Buffer Rule.
Any work conducted in the buffer, not specifically stated in the application and approved by the Division of
Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the
construction will be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plan(s) and specification(s), and other supporting materials.