Loading...
HomeMy WebLinkAbout20210660 Ver 1_Certification of Completion_20230724RECEIVED CERTIFICATE OF COMPLETION JUL 2 4 2023 NCDWR Project No.: County: l/f ht� ROWA 4011 & BUFFER PERM11TI Q r� Coun Applicant: Project Name: :,. S; -DRE.LI IJE L lal E / 241y �Imo''Lwcr Date of Issuance of 401 Water Quality Certification: OX / in 4402 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Cer0picatio s I aud , / o&►eL' , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ('/DZ'& Date: 012 /52,23 Agent's Certification I, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, . as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date. rqT— mcxpt 62"InJ6- P'E-:�-IPIF02/n5o 114E LUaRK (70�) 79/- -7 goy