HomeMy WebLinkAbout7-13-22 Springdale Driving Range Ext. - NOV Corrective Action MEMORANDUM TO: Mr. David Brown, PG Regulatory Specialist/ Geologist USACE Wilmington District-Asheville Regulatory Field Office 151 Patton Ave. Room 208 Asheville, NC 28801-5006 david.w.brown@usace.army.mil FROM: Preston Gregg, P.E. PR Engineering, PLLC prengineering@outlook.com (828) 400-9353 DATE: July 13, 2022 RE: Action ID: SAW2020-01111 Notice of Violation – Springdale Resort – Haywood Co. Mr. Brown, PR Engineering, PLLC (PRE) has been working closely with Springdale Resort in efforts to resolve the notice of violation at parcel PIN#8663-59-2373 involving the unauthorized impacts to the unnamed tributaries of Long Branch. PRE has provided erosion control plans outlining corrective measures required to bring the site as closely back as possible to pre-existing conditions. On March 18, 2022, Springdale Resort completed the corrective action plan designed by PRE and reviewed by Haywood County Development Services Specialist Tim Surrett. Both plans and photos are provided in this submittal. It is the intent of PRE and Springdale resort to present back to the ACOE by Fall of this year, a new revised site plan that identifies relocation of the stream that will entail piping in sections of the stream along with stream restoration of the sections that remain open. Proper permit applications will also be filed at this time. Should your office require any additional information in this request to resolve and ultimately release the notice of violation please do not hesitate to contact us should you have any questions or concerns. Sincerely, Preston R. Gregg, PE Principal prengineering@outlook.com 7/13/2022 Unnamed Tributary of Long Branch facing Northeast Direction Site cleanup progress as of July 13, 2022 Sediment Basin implemented adjacent to tributary DIVE R S I O N B E R M DIVER S I O N B E R M DIVE R S I O N B E R M D I V E R S I O N B E R M REMOVE EXISTING POND CONSTRUCTION ENTRANCE STABILIZED OUTFALL TO WATER COURSE STABILIZED OUTFALL TO WATER COURSESTABILIZED OUTFALL TO WATER COURSE STABILIZED OUTFALL TO BASIN 12" SLOPE DRAIN FROM EX. DITCH AT ROAD 12" SLOPE DRAIN FROM EX. DITCH AT ROAD APPROX. LOC. O F W A T E R C O U R S E APPR O X . L O C . O F W A T E R C O U R S E ROCK FILTER OUTLET ROCK FILTER OUTLET LIMITS OF CONSTRUCTION SLOPE STABILIZATION PER DETAILS TEMP S E D I M E N T B A S I N TOP: 7 3 2 9 S F WEIR: 6 6 0 9 S F BOT: 4 3 4 3 S F VOL: 1 3 , 3 5 0 C F ( M I N ) DIVERSION BERM STABILIZED OUTFALL TO BASIN SILT FENCE CONSTRUCTION ENTRANCE SI L T F E N C E SILT FENCE 2 5 ' B U F F E R 25 ' BU F F E R 25' BUFFER STABILIZE WAT E R C O U R S E B A N K S 2 5 ' B U F F E R STABILIZE ALL DISTURBED AREAS PER DETAILS STAB I L I Z E W A T E R C O U R S E B A N K S 2 : 1 DATE SCALE: PROJECT NO. REV. 1 CAD FILE NAME: PRELIMINARY EC PLAN OFSHEET CLIENT & PROJECT DRAWN BY: JLM CHECKED BY: PRG 3-18-2022 SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION HAYWOOD COUNTY ~ PRELIMINARY EC PLAN TO REMOVE NOV ~ SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION WALL FENCE POWER / UTILITY LINES LEGEND EDGE OF GRAVEL MAJOR CONTOUR LINE MINOR CONTOUR LINE CONCRETE BUILDING UTILITY POLE CONTROL SPIGOT UNDERGROUND GAS TANK HVAC TREE ELECTRIC METER TELEPHONE PEDESTAL Grid North (NAD83-2011) EXISTING SHRUBBERY PIN FLAGS WATER VALVE GAS VALVE ELECTRIC TRANSFORMER LIGHT POLE CLEANOUT DRAIN GRATE DITCHLINE STORM PIPE PE R M I T T I N G EROSION CONTROL PLAN C-130 1" = 50' 1 4 P-1564 FIRM NO. *** VERIFY FINAL LOCATION OF EROSION CONTROL MEASURES WITH EXISTING CONDITIONS. COORDINATE WITH ENGINEER. *** SILT FENCE 12' MIN 6'3' 3' 12" MIN. 4" OVERLAP 2:1 S L O P E M A X . TAMP SOIL O V E R M A T / B L A N K E T 4' ROLLMAX BIONET SC150BN ECB OR EQUAL S L O P E DOZER TREADS CREATE CLEAT IMPRINTS PARALLEL TO THE SLOPE CONTOUR SHOULD BE SEEDED AND STABILIZED IMMEDIATELY. SILT FENCE TIE-BACKS(OR J-HOOKS) SHOULD BE USED WHENEVER THE SILT FENCE IS INSTALLED AT AN ANGLE OF 30 DEGREES OR GREATER FROM PARALLEL TO THE CONTOURS. FOR DOWNSLOPE SILT FENCE INSTALLATION, TIE THE SILT FENCE BACK INTO THE SLOPE BY RUNNING ALONG THE CONTOUR 12' MIN. SEE SCHED. FOR INTERVAL NOTE: THIS DETAIL IS REPRESENTATIVE AND FOR ILLUSTRATION PURPOSES. FOLLOW ECB MANUFACTURER'S INSTALLATION SPECIFICATIONS AND PROCEDURES. SHAPE BORROW INTO EARTH BERM SEDIMENT OBTAIN BORROW FROM EXISTING GRADE EXISTING GRADE 18 " M I N . H E I G H T MAX 1 2 MIN3 1 RUNOFF 2' MIN. 10'R MIN. (TYP.) 2-3" COARSE WASHED STONE UNDERLINING NON-WOVEN GEOTEXTILE FABRIC 1. NOTES: INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHEN NEEDED TO PROVIDE POSITIVE DRAINAGE. HARD SURFACE ROAD 1 1-FT. MIN. 2-FT. MIN. 2 CHANNEL BOTTOM 3 1 1 0.5-FT. 2-FT. MAX. AT CENTER 2-FT. MAX. AT CENTER FLOW 0.5-FT. MIN. SECTION A-A NOTE: ROCK CHECK TO BE REMOVED BY GRADING CONTRACTOR AFTER CONSTRUCTION IS COMPLETE AND GRASSING IS ESTABLISHED AREA WHERE SEDIMENT IS TRAPPED 1-INCH d50 WASHED STONE TOP OF BANK NON-WOVEN GEOTEXTILE FABRIC LENGTH AS REQUIRED IN FIELD TO KEY INTO SIDE OF SLOPES OF DITCH 12-INCH D50 RIPRAP 11 2 A A NON-WOVEN GEOTEXTILE FABRIC TOP OF BANK PLACE STONE OVER CHANNEL BANKS OVERFLOW WEIR WIDTH 12-INCH d50 RIPPAP L BA L = THE DISTANCE SUCH THAT POINTS "A" AND "B" ARE OF EQUAL ELEVATION. 6" MIN. 50' M I N . 12' M I N . REF: NCDEQ E&SC MANUAL SECTION 6.06 INTERVAL SCHEDULE: 2-3% - every 100' 5-6% - every 50' >6% - every 40' REF: NCDEQ E&SC MANUAL SECTION 6.20 REF: NCDEQ E&SC MANUAL SECTION 6.03 REF: NCDEQ E&SC MANUAL SECTION 6.83 CHECK DAM SPACING 12" DIA. COMPOST SOCK DITCH CHECK SPACING CHANNEL SLOPE (%) SPACING BETWEEN SOCKS (FT) 1 100 2 50 3 33 4 25 5+20 COMPOST SOCK GROUND LINE (20% OF SOCK DIAMETER TO BE TRENCHED FOR SOCKS 12 IN. AND LARGER) STAKES PLACED AT 2' MAX. TYP. COMPOST SOCK (12" DIAMETER MIN.) STAKES 1' MIN. 2' M I N . 2' SPACING (TYP.) CONTINUOUS ALONG TUBE TOP VIEW OF DITCH SECTION A-A END VIEW OF DITCH REF: NCDEQ E&SC MANUAL SECTION 6.6 Maintenance See silt fence maintenance requirements. Maintenance Inspect compost socks weekly and after each significant rainfall event (1/2 inch or greater). Remove accumulated sediment and any debris. The compost sock must be replaced if clogged or torn. If ponding becomes excessive, the sock may need to be replaced with a larger diameter or a different measure. The sock needs to be reinstalled if undermined or dislodged. The compost sock shall be inspected until land disturbance is complete and the area above the measure has been permanently stabilized. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Maintenance Inspect temporary diversions once a week and after every rainfall. Immediately remove sediment from the flow area and repair the diversion ridge. Carefully check outlets and make timely repairs as needed. When the area protected is permanently stabilized, remove the ridge and the channel to blend with the natural ground level and appropriately stabilize it. Maintenance Periodically check the seeded slopes for rills and washes. Fill these areas slightly above the original grade, then reseed and mulch as soon as possible. REF: NCDEQ E&SC MANUAL SECTION 6.17 Maintenance Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. Monitor and repair the RECP as necessary until ground cover is established. Maintenance Inspect check dams and channels at least weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. Clean out sediment, straw, limbs, or other debris that could clog the channel when needed. Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct all damage immediately. If signficant erosion occurs between dams, addtional measures can be taken, such as installing a protective riprap liner in that portion of the channel (Re: Practice 6.31, Riprap-line and Paved Channels). Remove sediment accumulated behind the dams as needed to prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. USE ROLLMAX VMAX SC250 TRM OR EQUAL NOTE: THIS DETAIL IS REPRESENTATIVE AND FOR ILLUSTRATION PURPOSES. FOLLOW TRM MANUFACTURER'S INSTALLATION SPECIFICATIONS AND PROCEDURES. Maintenance Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. Monitor and repair the RECP as necessary until ground cover is established. DIVERSION BERM & SWALE N.T.S. SURFACE ROUGHENING N.T.S. COMPOST SOCK DITCH CHECK N.T.S. SILT FENCE TIE-BACK/J-HOOK N.T.S. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT N.T.S. EROSION CONTROL BLANKET (ECB) N.T.S. CHANNEL TURF REINFORCEMENT MAT (TRM) N.T.S. CHECK DAM N.T.S. DATE SCALE: PROJECT NO. REV. 1 CAD FILE NAME: PRELIMINARY EC PLAN OFSHEET CLIENT & PROJECT DRAWN BY: JLM CHECKED BY: PRG 3-18-2022 SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION HAYWOOD COUNTY ~ PRELIMINARY EC PLAN TO REMOVE NOV ~ SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION PE R M I T T I N G DETAILS C-200 NTS 2 4 P-1564 FIRM NO. PLAN VIEW SECTION 'd' EXTEND RIP-RAP & FILTER MATERIAL UP SLOPE AND AROUND PIPE 2' MIN. WHEN EXTENDING FROM ROCK FILTER SECTION, EXTEND FROM FULL WIDTH OF ROCK SECTION MAX ROCK DIAMETER ('dMAX') = 1.5 X d50 THICKNESS ('d') = 2.25 X d50 RECEIVING ELEVATION FILTER MATERIAL ROCK d50 50% SHALL BE LARGER THAN SIZE SPECIFIED END WIDTH NOTE: FILTER MATERIAL SHALL BE NON-WOVEN GEOTEXTILE FABRIC. BEGINNING WIDTH 2' MIN. 2' MIN. APRON LENGTH OUTLET CULVERTS*6" D50 6' BEG. WIDTH 15' END WIDTH 9" DMAX 14" d PIPE DIA. 12" Maintenance Inspect riprap outlet protection weekly and after significant (1/2 inch or greater) rainfall events to see if any erosion around or below the riprap has taken place, or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. NOTES: 1. 'La' = LENGTH OF APRON. DISTANCE 'La' SHALL BE OF SUFFICIENT LENGTH TO DISSIPATE ENERGY. 2. FILTER MATERIAL SHALL BE NON-WOVEN GEOTEXTILE FABRIC. 13' APRON LENGTH * WHEN PIPE OR ROCK OUTLETS DISCHARGE TO WATER COURSE OR BASIN EDGE, LINE THE CHANNEL TO THE WATER COURSE OR BASIN BOTTOM WITH END WIDTH AS SHOWN. RIP-RAP OUTLET PROTECTION N.T.S. DATE SCALE: PROJECT NO. REV. 1 CAD FILE NAME: PRELIMINARY EC PLAN OFSHEET CLIENT & PROJECT DRAWN BY: JLM CHECKED BY: PRG 3-18-2022 SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION HAYWOOD COUNTY ~ PRELIMINARY EC PLAN TO REMOVE NOV ~ SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION PE R M I T T I N G DETAILS C-201 NTS 3 4 P-1564 FIRM NO. DATE SCALE: PROJECT NO. REV. 1 CAD FILE NAME: PRELIMINARY EC PLAN OFSHEET CLIENT & PROJECT DRAWN BY: JLM CHECKED BY: PRG 3-18-2022 SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION HAYWOOD COUNTY ~ PRELIMINARY EC PLAN TO REMOVE NOV ~ SPRINGDALE GOLF COURSE DRIVING RANGE EXPANSION PE R M I T T I N G DETAILS C-202 NTS 4 4 P-1564 FIRM NO. TEMPORARY SEDIMENT TRAP SIZING SURFACE AREA (MIN.) 6,550 SF, AT WEIR ELEVATION VOLUME (MIN.) 13,320 CF AS SHOWN: DEPTH: 3.5' FROM BOTTOM TO WEIR, 4.5' FROM TOP OF BERM TO BOTTOM OF BASIN DEPTH (FT) SURFACE AREA (SF) 3.5 (WEIR) 6609 3.0 6261 2.0 5590 1.0 4950 0.0 4343